Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29,745.89Admitted-Finance | -0.01% | ₹29,745.89 | L1 | Admitted-Finance |
| 2 | L2₹30,641.33+₹895.44 (3.01%)Admitted-Finance | +3.00% | ₹30,641.33+₹895.44 (3.01%) | L2 | Admitted-Finance |
| 3 | L3₹30,938.81+₹1,192.92 (4.01%)Admitted-Finance | +4.00% | ₹30,938.81+₹1,192.92 (4.01%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 106 NEHRU NAGAR ROORKEE DISTRICT HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical NURSERY SCHOOL 1 SECTOR 33 SUNCITY KURUKSHETRA ROAD KAITHAL 136027 HARYANA | KAITHAL | KAITHAL | HARYANA | 136027 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
2 Jul 2026, 6:00 pmClosed
Executive Officer
Nagar Palika Ladnu
Annual Rate Contract for Construction and repairing of drain at various places in ward no 01 to 22
2026_DLB_566063_2
Npl/2026-27/1033/24
Open Tender
Civil Works
Percentage
Nagar Palika Ladnu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Officer
₹60,000
Yes
6 Aug 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks | 1 | Cum | 678 | ₹678 |
| 1.02 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301 In all type of soil | 1 | Cum | 235.5 | ₹235.5 |
| 1.03 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone, boulders, gravelly material lead 3 Km | 2 | Cum | 197.03 | ₹394.06 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | Cum | 4,575 | ₹4,575 |
| 1.05 | Supplying and fixing machine cut fine dressed Red/Pink sand stone dasa or coping, with full moulding if required laid on cement mortar 1:4 including pointing with admixture of pigment matching with the stone shade. 75 mm thick | 1 | Sqm | 1,664.3 | ₹1,664.3 |
| 1.06 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone | 1 | Sqm | 1,143 | ₹1,143 |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1 | Cum | 5,910 | ₹5,910 |
| 1.08 | Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge. Average thickness 60 to 75 mm | 1 | Sqm | 906 | ₹906 |
| 1.09 | Brick work with machine moulded perforated bricks of class designation 125 conforming to IS: 2222 -1991 in superstructure above plinth level upto two stories in cement mortar 1:6 (1 cement : 6 coarse sand) : With Modular bricks | 1 | Cum | 6,120 | ₹6,120 |
| 1.1 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | Cum | 4,860 | ₹4,860 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1015598.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .