| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC NO 6 SELVI BUILDING DEIVANAIAMMAL LAYOUT DHARAPURAM ROAD TIRUPPUR 641 608 | 641608 | ₹3.2 L | 1 | Accepted-AOC Bidder Quoted value Less than the estimate rate |
| Sl No | Description | Qty | Unit | M.Nithananthan L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavating for Sectioning and Levelling and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, Silt or other Loose Soil, Wet Sand or Silt not under water, Light Black Cotton Soil, Sandy Loam and Ordinary Soil including excavated earth etc., complete complying with standard specification (SS20B). | 34 | 1 M³ | 90 ₹3,060 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 34 | 1 M³ | 2,470 ₹83,980 |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications. | 339 | 1 M² | 80.5 ₹27,289.50 |
| 4.00 | Providing and laying Tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications. | 339 | 1 M² | 17 ₹5,763 |
| 5.00 | Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal by adding the shredded plastic waste equal to 10% of bitumen quantity 5.03Kg (50.30 x 10% = 5.03Kg) over the aggregate heated to 170 degree in CMP mixed well with 45.27Kg of hot bitumen VG30 / VG40 Bitumen (160 degree celcious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick bituminious concrete including the cost and conveyance of all materials to C M P site, heating the bitumen and agregates to the required temperature and mixing with minimum required temperature in central hot mix plant 20 - 30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory Roller / Pneumatic roller to the required density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30 t C M P with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plants required, including fuel all other incidental charges etc., complete as per specification using C M P as per clause 507 of MORTH REV-5 specifications. | 14 | 1 M³ | 10,790 ₹1.5 L |
| 6.00Add G.S.T. @ 18% | ||||
Tender Value
₹3.3 L
EMD Value
₹6,500
Closing Date
17 Oct 2025, 3:00 pmClosed
Commissioner
Tiruppur City Municipal Corporation Office, Tiruppur.
Providing BT Patch work to the Pot holes and Pipe Line Cutting Portion at Karupparanyan Nagar 1st Street in ward no 60
2025_MAWS_610203_1
297 / 2025-26 / Z3 / EE, TCMC.,
Open Tender
Civil Works - Roads
90 days
TIRUPPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,500
23 Feb 2026
30 Sept 2025
17 Oct 2025
30 Sept 2025
17 Oct 2025
30 Sept 2025
Amount
Earthwork excavating for Sectioning and Levelling and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, Silt or other Loose Soil, Wet Sand or Silt not under water, Light Black Cotton Soil, Sandy Loam and Ordinary Soil including excavated earth etc., complete complying with standard specification (SS20B).
Providing and laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications.
Providing and laying Tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications.
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal by adding the shredded plastic waste equal to 10% of bitumen quantity 5.03Kg (50.30 x 10% = 5.03Kg) over the aggregate heated to 170 degree in CMP mixed well with 45.27Kg of hot bitumen VG30 / VG40 Bitumen (160 degree celcious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick bituminious concrete including the cost and conveyance of all materials to C M P site, heating the bitumen and agregates to the required temperature and mixing with minimum required temperature in central hot mix plant 20 - 30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN Vibratory Roller / Pneumatic roller to the required density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30 t C M P with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plants required, including fuel all other incidental charges etc., complete as per specification using C M P as per clause 507 of MORTH REV-5 specifications.
Add G.S.T. @ 18%
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid