Loading…
Loading…
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
1 Sept 2026, 4:00 pm4d left
Executive Engineer RnB Handwara
xen handwara
Construction of shopping complex at MC Handwara (Civil and Plumbing Work)Handwara
2026_PWDJK_320585_1
NIT NO 30 OF 2026-27
Open Tender
Civil Works
Percentage
730 days
Handwara
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,500
Executive Engineer RnB Handwara
₹8.8 L
Yes
Superintending Engineer PWD RnB Circle Kupwara
12 Aug 2026
12 Aug 2026
2 Sept 2026
13 Aug 2026
1 Sept 2026
16 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m all kinds of soilnincl dewatering, as directed by
Engineer-in-Charge. | 2,244.54 | cum | 287.3 | ₹6,44,855.19 |
| 2 | Supply and filling gsb under floor including watering , ramming and consolidating with hand rammer with aggregates size not exceeding 90mm including cost and carriage of all materials involved upto site of work all complete | 302.53 | cum | 1,000 | ₹3,02,527 |
| 3 | Providing and laying of stone soling/boulders (Hand Packed) including ramming, dressing and watering and carriage up to site. | 248.4 | cum | 900 | ₹2,23,560.9 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal) crushed incl all carriages | 177.57 | cum | 5,202 | ₹9,23,693.13 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth:
7.3.2 Without bond stone | 11.28 | cum | 2,793 | ₹31,505.04 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1;1.5:3 | 28.59 | cum | 9,395.7 | ₹2,68,613.67 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1.5:3 | - | - | - | - |
| 8 | All works upto plinth level | 550.5 | cum | 8,520.15 | ₹46,90,308.49 |
| 9 | All works above plinth level upto floor V level | 191.49 | cum | 9,911.1 | ₹18,97,866.63 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all levels. Fe-500D TMT bars | 1,275.62 | QTL | 12,320 | ₹1,57,15,638.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
Tendernotice_2.pdf
PDF • 2.23 MB
BOQ_1066150.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].