| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||
| 1.01 | All kinds of soil. | 14 | One Cubic Metre | 330 ₹4,620 Lowest |
| 2.00Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : | ||||
| 2.01 | In cement mortar | 14 | One Cubic Metre | 3,220 ₹45,080 Lowest |
| 3.00Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: | ||||
| 3.01 | R.S. Joists | 178.25 | One Kilogram | 5 ₹891.25 Lowest |
| 4.00Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured): | ||||
| 4.01 | In cement mortar | 5 | One Cubic Metre | 880 ₹4,400 Lowest |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 9 | One Cubic Metre | 225 ₹2,025 Lowest |
| 6.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 7 | One Cubic Metre | 330 ₹2,310 Lowest |
Tender Value
₹2.9 L
EMD Value
₹5,845
Closing Date
6 Sept 2025, 6:00 pmClosed
The Executive Engineer Civil Tender KTK Circle
Room No 324 3rd Floor CGMT Doorasamparka Bhavana No1 Swamy Vivekananda Road Bengaluru 560008
Reconstruction of buckled compound wall near entry gate of CTO building, Bangalore.
2025_BSNL_245459_1
17/EEC/BSNL/CD/BGL/2025-26
Open Tender
Civil Works - Buildings
Item Rate
90 days
Bengaluru
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
The Accounts officer (Cash)HQ BSNL BGTD Bengaluru
₹5,845
10 Sept 2025
16 Aug 2025
9 Sept 2025
19 Aug 2025
6 Sept 2025
19 Aug 2025
19 Aug 2025 - 4 Sept 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :
In cement mortar
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:
R.S. Joists
Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured):
In cement mortar
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Dismantling old M.S. Gate before demolition of wall and refixing in position with new M.S. Brackets welded to cleat embeded in concrete and hinges of the gate making it operational complete as directed by E-I-C.
M.S. gate-1.20mx1.65m
Cutting of tree routes encountered in foundation trench to receive bed concrete using carpenters saw, power cutter saw and axe wherever required complete as directed and disposal of debris to a lead of 50m.
Trenchs of area upto 1.50sqm
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing :
1:2:4 (1 Cement : 2 coarse sand derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Coursed rubble masonry (first sort) with hard stone supplied by the department in foundation and plinth with : Cement mortar 1:6 (1 cement : 6 coarse sand)
(Note- Only stone shall be supplied free of cost and agency shall quote rate excluding the coursed rubble stone)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
Electric resistance or induction butt welded tubes.
Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) :
Flush/ Ruled pointing
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work.
Credit to the agency for material recovered under item no. 3 of steel work
M.S. joist/channel etc.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .