Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.7 L
EMD Value
₹3,400
Closing Date
17 Aug 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
Hall no. 4,1st Block Mini Sectt., Kishtwar
refer BOQ
2026_RDPR_318501_20
e-NIT No 65 of REW KISHTWAR 2026-27 Dated. 29.07.2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
refer Tender documents
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹3,400
Yes
27 Aug 2026
30 Jul 2026
18 Aug 2026
30 Jul 2026
17 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed | 57.6 | CUM | 479.3 | ₹27,607.68 |
| 2 | DRY STONE PITCHING (ANY THICKNESS) EXCLUDING COST OF STONES ON HORIZONTAL | 4.32 | cum | 535.55 | ₹2,313.58 |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering 1:3:6 (1 cement : 3 coarse sand : 6 graded stone | 12.79 | cum | 5,733.6 | ₹73,332.74 |
| 4 | CENTERING AND SHUTTERING INCL STRUTTING ,PROPPING ETC | 76.8 | SQM | 286.35 | ₹21,991.68 |
| 5 | C/O SAND | 6.01 | cum | 1,904.58 | ₹11,446.53 |
| 6 | C/O AGG | 11.39 | CUM | 1,904.58 | ₹21,693.17 |
| 7 | C/O STONE | 3.67 | CUM | 2,240.68 | ₹8,223.3 |
| 8 | CIB | 1 | NO | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1050208.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].