Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 CrAdmitted-Finance | ₹30.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹36.7 CrAdmitted-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹36.7 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | HL HANDA AND CO L1 | ENVIRO INFRA ENGINEERS LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Design & Construction including Supply, Installation, Testing and Commissioning of :- 50 MLD capacity MPS, Raw Pump House, Raw Stilling Chamber, Building work etc. Complete in all respect and any other work contingent thereto.20 MLD Sewage Treatment plant based on SBR technology, SBR Basin, Polyelectrolyte Solution Tanks, ,Building work other contingent works there to complete in all respect. Tertiary Treatment Comprising of Treated Effluent Collection Sump, Post Chlorination ,Receiving Chamber, Flash Mixer ,Ferric Chloride/Lime/Poly Solution Tanks, Clariflocculator, Rapid Sand Gravity Filter, Backwash/ Service Water, Backwash Tank complete. Administrative cum Chemical Building, Chlorination room, Tonner Shed, Raw Water pump panel room, Operating Gallery for Rapid Gravity filters, Centrifuge Building, Belt/Screw Press/Filter press building, Staff Quarters etc. complete in all respect. as per site requirement | 1 | Complete Job | 11,50,00,000 ₹11.5 Cr | 14,50,00,000 ₹14.5 Cr |
| 2.00 | Design & Construction including Supply, Installation, Testing and Commissioning of :-50 MLD capacity MPS, Raw Sewage Lifting Pumps, Mechanical Coarse screens ,SCADA, PLC etc. inter connecting piping, valves, from MPS to STP. Complete in all respect and any other work contingent thereto.20 MLD Sewage Treatment plant based on SBR technology, SAS Sludge Lifting Pumps, RAS Sludge Lifting Pumps, Air Blowers, Sludge Lifting Pumps to dewatering system, Polyelectrolyte Metering Pumps, other contingent works there to complete in all respect. Tertiary Treatment Comprising of Treated Effluent Lifting Pump, ,Flash Mixer, Metering Pumps, Clariflocculator, Rapid Sand Gravity Filter, Backwash / Service Water, Backwash Tank Filling Pumps complete. Water pump, CCTV cameras, EX Terminal Lighting online analyzing metering system. complete in all respect. as per site requirement and satisfaction in the Engineering-in-charge. | 1 | Complete Job | 18,90,00,000 ₹18.9 Cr | 21,50,00,000 ₹21.5 Cr |
| 3.00 | Boundary Wall - 900 mtr. | 1 | Complete Job | 20,00,000 ₹20 L | 30,00,000 ₹30 L |
| 4.00 | Roads 3.75M Wide (M2)-1425 mtr | 1 | Complete Job | 33,00,000 ₹33 L | 40,00,000 ₹40 L |
| 5.00 | Operation and Maintenance (for 5 years) | 1 | Complete Job | 1,50,000 ₹1.5 L | 1,50,000 ₹1.5 L |
Updated dates
Tender Value
₹31.3 Cr
EMD Value
₹62.6 L
Closing Date
19 Mar 2026, 12:00 pmClosed
Narender Kumar Payal
Construction Division-II
DPR for Design and Construction of 20 MLD into 2.5 Peak Factor 50 MLD Main Sewage Pumping Station, 20 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology, Tertiary Treatment Plant. Boundary wall, roads, platforms, D.G. Set,
2025_HRY_484478_1
202508F51D46 CC6A 4FDC ACD4 16889B31917F2239003
Open Tender
Civil Works
650 days
Panchkula
2 documents required · 2 mandatory
₹10,000
₹62.6 L
Yes
Chief Engineer, PMDA Panchkula
30 May 2026
20 Nov 2025
19 Mar 2026
20 Nov 2025
19 Mar 2026
20 Nov 2025
10 Dec 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.37 MB
BOQ_562497.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid