| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 CrAdmitted-Finance | ₹7.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.5 CrAdmitted-Finance 00 00 NAPASAR ROAD NENO KA BASS BIKANER RAJASTHAN BIKANER RAJASTHAN 334022 UDYAM RJ 08 0001676 | BIKANER | RAJASTHAN | 334022 | ₹7.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹8.1 CrAdmitted-Finance OFFICE NO 304 305 3RD FLOOR PLOT NO 1 USHA CHAMBERS L S C NEW RAJDHANI ENCLAVE DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | ₹8.1 Cr | L3 | Admitted-Finance |
| 4 | L4₹8.1 CrAdmitted-Finance | ₹8.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹8.5 CrAdmitted-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹8.5 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G and G Infratech Private Limited L3 | A S CONSTRUCTION COMPANY L2 | M/s Shrangi Rishi Construction L1 | malik constructions L6 | Jasraj & Company L5 | M/S Royal Enterprises L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 5,87,65,432 ₹5,87,65,432 | 5,52,16,216.46 ₹5,52,16,216.46 | 5,45,00,000 ₹5,45,00,000 | 7,06,44,428 ₹7,06,44,428 | 6,25,67,950.66 ₹6,25,67,950.66 | 6,26,00,000 ₹6,26,00,000 |
| 2.00 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 13,74,096 ₹13,74,096 | 15,57,180.24 ₹15,57,180.24 | 12,10,000 ₹12,10,000 | 15,57,180 ₹15,57,180 | 17,12,898.26 ₹17,12,898.26 | 15,57,180 ₹15,57,180 |
| 3.00 | Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 1,18,58,424 ₹1,18,58,424 | 1,01,74,975.17 ₹1,01,74,975.17 | 83,50,000 ₹83,50,000 | 1,15,00,000 ₹1,15,00,000 | 1,17,81,550.19 ₹1,17,81,550.19 | 1,00,00,000 ₹1,00,00,000 |
| 4.00 | Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 27,88,353 ₹27,88,353 | 24,54,636.92 ₹24,54,636.92 | 23,00,000 ₹23,00,000 | 21,56,901 ₹21,56,901 | 27,00,100.61 ₹27,00,100.61 | 19,00,000 ₹19,00,000 |
| 5.00 | Lump sum price worked out by the contractor for "FENCING , GATE AND STEEL GATE FOR SHEDS" as listed in Schedule ‘A’ Part-VII" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 24,51,876 ₹24,51,876 | 20,48,464.53 ₹20,48,464.53 | 26,00,000 ₹26,00,000 | 23,11,908 ₹23,11,908 | 27,31,286.04 ₹27,31,286.04 | 22,76,072 ₹22,76,072 |
| 6.00 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 11,93,535 ₹11,93,535 | 10,18,497.99 ₹10,18,497.99 | 10,00,000 ₹10,00,000 | 7,85,809 ₹7,85,809 | 10,18,497.98 ₹10,18,497.98 | 7,83,460 ₹7,83,460 |
| 7.00 | Lump sum price worked out by the contractor for " LIGHTING PROTECTION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 3,28,394 ₹3,28,394 | 3,28,394.1 ₹3,28,394.1 | 3,55,000 ₹3,55,000 | 5,04,708 ₹5,04,708 | 4,26,912.33 ₹4,26,912.33 | 3,28,394 ₹3,28,394 |
| 8.00 | Lump sum price worked out by the contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 18,76,174 ₹18,76,174 | 17,24,209.84 ₹17,24,209.84 | 12,50,000 ₹12,50,000 | 15,00,000 ₹15,00,000 | 17,24,209.83 ₹17,24,209.83 | 14,00,000 ₹14,00,000 |
| 9.00Sch 'A' Part-XVII MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under SCH A PART-XV (SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK schedule). | |||||||||
| 10.00 | EXTERNAL ELECTRIC SUPPLY
Supply and fixing, install, test and commissioning of LT Feeder pillar box outdoor type totally enclosed with front and rear opening hinged doors with canopy sloped top projected and raised platform of suitable sizes weather dust vermin proof IP-54 protection CPRI approved, factory fabricated, cubical panel free standing type, made out of 3.15 mm thick CRCA sheet with locking arragement , factory made powder coated as approved colour, copper bus bar suitable for 3 phase 4 wire LT, AC, 50Hz, 433 volts, 200 Amps rating capacity RYBN insulated with sleeved insulation complete with multifunctional meter LED type by showing Amps, volts, frequency etc along with suitable size of CT on outgoing, indicating lamp RYB , complete internal wiring with suitable size of PVC insulated copper conductor cable, including cable glands and lugs for incoming and out going cables as per required sizes, PCC platform made out of 1:2:4 type B1 and pedestal of 60 cm height from GL with suitable nut, bolts, washers etc., all as specified and directed for suitable to accomodate the following items including supply and fix following items and all as specified and directed by Engr-in-Charge. | 1 | Each | 1,85,000 ₹1,85,000 | 1,50,000 ₹1,50,000 | 1,00,000 ₹1,00,000 | 3,00,000 ₹3,00,000 | 1,50,000 ₹1,50,000 | 3,00,000 ₹3,00,000 |
Tender Value
₹6.3 Cr
EMD Value
₹6.4 L
Closing Date
30 Jun 2026, 6:00 pmClosed
CHIEF ENGINEER JAIPUR ZONE JAIPUR
HQ CHIEF ENGINEER JAIPUR ZONE JAIPUR
PROVN OF VEHICLE AND EQPT SHED AT BHARATPUR MIL STN
2026_MES_766341_1
80936/E8
Open Tender
Civil Works
365 days
GE BHARATPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,000
GE BHARATPUR
₹6.4 L
Yes
4 Jul 2026
19 May 2026
2 Jul 2026
19 May 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 4,67,84,390.15 | ₹4,67,84,390.15 |
| 2 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 14,70,055.62 | ₹14,70,055.62 |
| 3 | Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 1,02,59,000.18 | ₹1,02,59,000.18 |
| 4 | Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 24,54,636.92 | ₹24,54,636.92 |
| 5 | Lump sum price worked out by the contractor for "FENCING , GATE AND STEEL GATE FOR SHEDS" as listed in Schedule ‘A’ Part-VII" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 52,08,561.43 | ₹52,08,561.43 |
| 6 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 6,34,735.97 | ₹6,34,735.97 |
| 7 | Lump sum price worked out by the contractor for " LIGHTING PROTECTION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 3,28,394.1 | ₹3,28,394.1 |
| 8 | Lump sum price worked out by the contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 26,11,880.93 | ₹26,11,880.93 |
| 9Sch 'A' Part-XVII MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under SCH A PART-XV (SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK schedule). | |||||
| 10 | EXTERNAL ELECTRIC SUPPLY
Supply and fixing, install, test and commissioning of LT Feeder pillar box outdoor type totally enclosed with front and rear opening hinged doors with canopy sloped top projected and raised platform of suitable sizes weather dust vermin proof IP-54 protection CPRI approved, factory fabricated, cubical panel free standing type, made out of 3.15 mm thick CRCA sheet with locking arragement , factory made powder coated as approved colour, copper bus bar suitable for 3 phase 4 wire LT, AC, 50Hz, 433 volts, 200 Amps rating capacity RYBN insulated with sleeved insulation complete with multifunctional meter LED type by showing Amps, volts, frequency etc along with suitable size of CT on outgoing, indicating lamp RYB , complete internal wiring with suitable size of PVC insulated copper conductor cable, including cable glands and lugs for incoming and out going cables as per required sizes, PCC platform made out of 1:2:4 type B1 and pedestal of 60 cm height from GL with suitable nut, bolts, washers etc., all as specified and directed for suitable to accomodate the following items including supply and fix following items and all as specified and directed by Engr-in-Charge. | 1 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Archdrgmerged.pdf
Additional Documents • 2.31 MB
80936merged.pdf
Tender Documents • 12.65 MB
StrDrgmerged.pdf
Additional Documents • 8.28 MB
TDdrgmerged.pdf
Additional Documents • 8.35 MB
BOQ_858262.xls
BOQ • 0.67 MB
Download all tender documents and submit your bid