| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-AOC | ₹7.7 Cr Quoted ₹8.3 Cr | L1 | Accepted-AOC L1 bidder and LER |
| 2 | L2₹8.5 Cr+₹23.0 L (2.77%)Rejected-Finance NO 5 8 KANKATTI ALA PERIYAKUTTY MADUVU POST VAZHAPPADI TALUK SALEM 636101 | SALEM | SALEM | TAMIL NADU | 636101 | ₹8.5 Cr+₹23.0 L (2.77%) | L2 | Rejected-Finance Higher margin rate. |
| Sl No | Description | Qty | Unit | Selliamman constructions L2 | SAMRAT CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in Soft Disintegrated Rock Not Requiring Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL [ADDITIONAL DEPTH]. | 324.17 | Cum | 637 ₹2,06,496.29 | 620 ₹2,00,985.4 Lowest |
| 2.00 | Earthwork Excavation in Soft Disintegrated Rock Not Requiring Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 532.63 | Cum | 637 ₹3,39,285.31 | 620 ₹3,30,230.6 Lowest |
| 3.00 | Blasting and Removing the Hard Rock measured in solid in the foundation and removing the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidental charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specifications for (OPEN FOUNDATION) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 336.39 | Cum | 2,151 ₹7,23,574.89 | 2,092 ₹7,03,727.88 Lowest |
| 4.00 | Providing and Fixing Dowel Bars with 32mm Steel Rods of 1.5m length embedded into the rock to a depth of 0.9m by providing required depth of holes by drilling the rock in 50mm dia wherever necessary including fixing in position by grouting the embedded portion with CM 1:2 after placing the bars Sub-Structure of Abutment / Pier/Wing and Top Footing of Open Foundation/Raft Foundation. | 252 | Nos | 976 ₹2,45,952 | 950 ₹2,39,400 Lowest |
| 5.00 | Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Abutments,Return Wall & Piers Footing. | 28.03 | Cum | 5,565 ₹1,55,986.95 | 5,414 ₹1,51,754.42 Lowest |
| 6.00 | Vibrated Reinforced Cement Concrete of Grade M35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing Under Abutment, Return Wall & Piers Below Sill Level. | 396.2 | Cum | 10,553 ₹41,81,098.6 | 10,266 ₹40,67,389.2 Lowest |
| 7.00 | Vibrated Reinforced Cement Concrete of Grade M35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS AND WINGS BELOW SILL LEVEL. | 37.8 | Cum | 11,068 ₹4,18,370.4 | 10,767 ₹4,06,992.6 Lowest |
| 8.00 | Vibrated Reinforced Cement Concrete of Grade M35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS AND WINGS ABOVE SILL LEVEL. | 113.55 | Cum | 11,562 ₹13,12,865.1 | 11,246 ₹12,76,983.3 Lowest |
| 9.00 | Vibrated Reinforced Cement Concrete of Grade M35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF CIRCULAR COLUMN PIERS BELOW SILL LEVEL. | 10.6 | Cum | 11,190 ₹1,18,614 | 10,885 ₹1,15,381 Lowest |
| 10.00 | Vibrated Reinforced Cement Concrete of Grade M35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF CIRCULAR COLUMN PIERS ABOVE SILL LEVEL. | 20.33 | Cum | 12,996 ₹2,64,208.68 | 12,642 ₹2,57,011.86 Lowest |
Tender Value
₹7.7 Cr
EMD Value
₹8.1 L
Closing Date
19 Aug 2025, 3:00 pmClosed
The Project Director, DRDA, Virudhunagar Dist
DRDA, Collectorate, Virudhunagar
Construction of Bridge across Gundar river along Manthoppu to Chinnavaiyampatti road at Manthoppu Panchayat in Kariapatti Block at Virudhunagar District under State Special Assistance Phase-I for the year 2025-26
2025_RDTN_587068_2
DIPR/3980/TENDER/2025
Open Tender
Civil Works - Bridges
Item Rate
365 days
Kariapatti Block
Teo Cover System. Refer Tender document.
5 documents required · 5 mandatory
₹0
₹8.1 L
DRDA,Virudhunagar
20 Nov 2025
30 Jul 2025
19 Aug 2025
30 Jul 2025
19 Aug 2025
11 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.34 MB
Tenderdocument.pdf
Tender Documents • 1.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .