Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹60.0 LAdmitted-Finance | -0.01% | ₹60.0 L | L1 | Admitted-Finance |
| 2 | L2₹61.2 LAdmitted-Finance | +2.00% | ₹61.2 L | L2 | Admitted-Finance |
| 3 | L3₹61.8 LAdmitted-Finance | +3.00% | ₹61.8 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
11 May 2026, 5:00 pmClosed
EE W Z.P. Hiingoli
EE W Z.P. Hiingoli
Construction of Bridge from SH 256 Kurunda to Somthana road KM 0/00 to 5/300 VR 129 Tq. Basmath
2026_HINGO_1295330_1
EEW/HING/Open/10/2026-27
Open Tender
Civil Works - Bridges
100 days
Bassmath
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹60,000
15 May 2026
17 Apr 2026
13 May 2026
17 Apr 2026
11 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. (Item No. 12.02 ) a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | - | Cum | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. (12.06 a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Excavation for foundation in soft rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. (12.08 a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) 12.23 Abutment and Return | - | Hrs | - | - | BI01010001010000000000000515BI0100001115 |
| 5 | Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand) 12.25 | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Providing and filling annular space around footing in rock by using concrete of M15 grade etc. complete. 15.05 | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 7 | Providing and laying in situ / ready mix M-20 plain cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu piers, abutment, returns, wings etc. including provision of "V" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood/steel form work centering ( excluding dewatering by means of pump) and including bailling out water and curing finishing in CM 1:3 etc. complete. as directed by engineer in charge basic rate shall be increased for height above 5.00 m in followinh manners
(a) Height upto 5 M. (With Concrete Mixer)With fine agreegates of required specifications (Natural sand / VSI sand finely washed etc )
i) Height up to 5 m, normal rate.
ii) Height 5 to 7.50 m, add 5 percent extra over basic rate.
iii) Height 7.50 to 10 m, 7.50 percent extra.
iv) Over 10 m Height, add 10 percent extra for every 2.50m rise. 17.39 | - | CuM | - | - | BI01010001010000000000000515BI0100001118 |
| 8 | Providing and laying in situ / ready mix controlled M-30 cement concrete of of trap / granite / quartzite/ gniess metal for reinforced cement concrete caps over piers and abutments including necessary sacffolding plywood/steel formwork, compacting by vibrating, finishing in CM 1:3 and curing etc complete ( Excluding reinforcement)
With reversible drum type mixer/ concrete batch mix plant (pan
mixer) . with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) 17.54 | - | CuM | - | - | BI01010001010000000000000515BI0100001119 |
| 9 | Providing and laying weep holes of 100 mm diameter PVC pipes as per drawing for abutment returns, return walls etc. Complete.17.37 | - | RgM | - | - | BI01010001010000000000000515BI0100001120 |
| 10 | Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete. (Item No. 14.01) | - | SqM | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_2225596.xls
BOQ • 0.37 MB
B1doc.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid