Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27,003.49Admitted-Finance | -42.30% | ₹27,003.49 | L1 | Admitted-Finance |
| 2 | L2₹27,022.21+₹18.72 (0.07%)Admitted-Finance | -42.26% | ₹27,022.21+₹18.72 (0.07%) | L2 | Admitted-Finance |
| 3 | L3₹29,301.36+₹2,297.87 (8.51%)Admitted-Finance | -37.39% | ₹29,301.36+₹2,297.87 (8.51%) | L3 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
2 May 2026, 4:00 pmClosed
Executive Engineer FCD Jammu
Executive Engineer FCD Jammu
Maintenance works including petty works to be executed at site as per the necessity/ Demands in various nallahs in the jurisdiction of Flood Control Sub-Division IV (Stage Contract 2026-27 upto 31.03.2027)
2026_IFC_308475_4
e-NIT No. 03 of 2026-27
Open Tender
Civil Works
Percentage
365 days
Jammu
as per nit
2 documents required · 2 mandatory
₹500
Executive Engineer FCD Jammu
₹20,000
19 May 2026
23 Apr 2026
4 May 2026
23 Apr 2026
2 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | |||||
| 2Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables act (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil (01 mtr lead) | |||||
| 3Dismantling old protection work including cutting of crates and stacking of stones | |||||
| 4 | Dismantling Dry stone pitching in aprons, drains, etc. including stacking of serviceable material & disposal of unserviceable material, stacking
/disposal lead upto 100 meters. | - | cum | 1 | - |
| 5Opening out old wire crates those and re-binding after filling | |||||
| 6 | Hand-packing stones in wire-crates; excluding cost of crates and stones | - | cum | 1 | - |
| 7Dry stone pitching (any thickness) excluding cost of stones. | |||||
| 7.01 | On Horizontal | - | cum | 1 | - |
| 7.02 | on slopes | - | cum | - | - |
| 8Supply of Nallah Stones | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_999621.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .