| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.1 CrAccepted-Finance | ₹37.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹38.5 Cr+₹1.4 Cr (3.82%)Rejected-Finance M 13 S S HARMU HOUSING COLONY PS ARGORA PO DORANDA RANCHI JHARKHAND 834002 | RANCHI | JHARKHAND | 834002 | ₹38.5 Cr+₹1.4 Cr (3.82%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical NEAR FLOUR MILL DHAIYA DHANBAD JHARKHAND 826001 | DHANBAD | JHARKHAND | 826001 | - | - | Rejected-Technical NON RESPONSIVE |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPOSNIVE |
| 5 | Rejected-Technical AT CHAPARIA PO KOIRIDIH PS JASIDIH DIST DEOGHAR JHARKHAND PIN 814153 | GODDA | JHARKHAND | 814153 | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | M/S MANOJ KUMAR PANDEY L2 | ME-PC (JV) L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. | 6,098.21 | CUM | 151.82 ₹9,25,830.24 | 146.23 ₹8,91,741.25 Lowest |
| 2.00 | Extra for earthwork in hard soil as per specification and direction of E/I. (vide classification of soil item-B) | 5,268.86 | CUM | 15.51 ₹81,720.02 | 14.94 ₹78,716.77 Lowest |
| 3.00 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 3,743.58 | CUM | 55.28 ₹2,06,945.1 | 53.25 ₹1,99,345.64 Lowest |
| 4.00 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 3,874.95 | CUM | 128.88 ₹4,99,403.56 | 124.14 ₹4,81,036.29 Lowest |
| 5.00 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). | 867.74 | CUM | 589.51 ₹5,11,541.41 | 567.82 ₹4,92,720.13 Lowest |
| 6.00 | Providing designation 75 A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l | 444.8 | CUM | 5,439.85 ₹24,19,645.28 | 5,239.66 ₹23,30,600.77 Lowest |
| 7.00 | Providing designation 75A brick work in CM (1:6) in superstructure with approved quality of clean coarse & of F.M. 2.5 including providing 10mm thick mortar joints cost of screening, racking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 26.1 | CUM | 5,573.67 ₹1,45,472.79 | 5,368.56 ₹1,40,119.42 Lowest |
| 8.00 | Providing designation 125 mm thick reinforced designation 75 A brick work in C.M (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening, carriage of materials , scafolding, raking out joints to 15 mm depth, curing, taxes and royalty ( but excluding the cost of reinforcement) all complete as per building specification and direction of E/l. | 26.4 | SQM | 713.49 ₹18,836.14 | 687.23 ₹18,142.87 Lowest |
| 9.00 | Providing designation 100A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9" x 4.5" x 3") in C.M. (1:6) in superstructure with approved quality of clean sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 2,762.75 | CUM | 4,509.16 ₹1,24,57,681.79 | 4,343.22 ₹1,19,99,231.06 Lowest |
| 10.00 | Providing 112mm thick reinforced designation 100A brickwork fly ash lime brick (FLAG) confirming to IS 12894-1990 (9" x 4.5" x 3") in C.M. (1:4) in superstructure with approved quality of clean sand of F.M. 2 to 2.5 including the cost of screening carriage of material scaffolfing raking out joint to 15mm depth curing taxes and royalty (but excluding the cost of reinforcement ) all complete as per building specification and direction of E/I. | 1,488.82 | SQM | 578.3 ₹8,60,984.61 | 557.02 ₹8,29,302.52 Lowest |
Tender Value
Refer Docs
EMD Value
₹38.5 L
Closing Date
5 Jun 2026, 5:00 pmClosed
Nodal Officer
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Beside Jharkhand Mantralaya, Dhurwa, Ranchi- 834004.
Construction of Degree College, Boarijor, Godda in Godda District under Sidhu Kanhu Murmu University, Dumka
2026_JSBCC_113570_1
JSBCCL/17/2026-27
Open Tender
Civil Works - Buildings
Works
630 days
Godda
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹38.5 L
JSBCCL
27 Jul 2026
8 May 2026
8 Jun 2026
8 May 2026
5 Jun 2026
8 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. | 6,098.21 | CUM | - | - |
| - | Extra for earthwork in hard soil as per specification and direction of E/I. (vide classification of soil item-B) | 5,268.86 | CUM | - | - |
| - | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 3,743.58 | CUM | - | - |
| - | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 3,874.95 | CUM | - | - |
| - | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). | 867.74 | CUM | - | - |
| - | Providing designation 75 A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l | 444.8 | CUM | - | - |
| - | Providing designation 75A brick work in CM (1:6) in superstructure with approved quality of clean coarse & of F.M. 2.5 including providing 10mm thick mortar joints cost of screening, racking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 26.1 | CUM | - | - |
| - | Providing designation 125 mm thick reinforced designation 75 A brick work in C.M (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening, carriage of materials , scafolding, raking out joints to 15 mm depth, curing, taxes and royalty ( but excluding the cost of reinforcement) all complete as per building specification and direction of E/l. | 26.4 | SQM | - | - |
| - | Providing designation 100A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9" x 4.5" x 3") in C.M. (1:6) in superstructure with approved quality of clean sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 2,762.75 | CUM | - | - |
| - | Providing 112mm thick reinforced designation 100A brickwork fly ash lime brick (FLAG) confirming to IS 12894-1990 (9" x 4.5" x 3") in C.M. (1:4) in superstructure with approved quality of clean sand of F.M. 2 to 2.5 including the cost of screening carriage of material scaffolfing raking out joint to 15mm depth curing taxes and royalty (but excluding the cost of reinforcement ) all complete as per building specification and direction of E/I. | 1,488.82 | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_153711.xls
BOQ • 0.65 MB
SBD17.pdf
Tender Documents • 11.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .