| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.4 LAccepted-AOC | ₹82.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹82.4 LRejected-AOC 30 2 BOWBAZAR WEST LANE P O KRISHNAGAR DIST NADIA 741101 | KRISHNAGAR | NADIA | WEST BENGAL | 741101 | ₹82.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹82.5 LRejected-AOC | ₹82.5 L | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
13 Jan 2026, 4:00 pmClosed
EE(A-M) Chinsurah (A-M) Division
EE(A-M) Chinsurah (A-M) Division
Installation of New Keshabchak Major RLI Schemes (Handed Over) on Turn-Key Basis under Champadanga (A-M) Sub-Division under Chinsurah (A-M) Division under SARASARI MUKHYAMANTRI (Core Sector) Programme in the District of Hooghly
2025_WRDD_976788_1
WBWRDD/EEAM/CNS/CS /eNIT-14 of 2025-26
Open Tender
CIVIL AND ELECTRICAL WORKS
180 days
Hooghly
Please refer Tender documents.
3 documents required · 3 mandatory
₹1.6 L
15 Feb 2026
25 Dec 2025
16 Jan 2026
26 Dec 2025
13 Jan 2026
26 Dec 2025
Supply & Delivery of Materials: Supply and Delivery of 315 mm dia P.V.C pipe class-I ( with a loose matching coupler) marking IS No. 4985/2000 with latest amendments with free solvent cement. Ivory Grey, both end plain. Length of each straight Pipe 6mts with tolerance (±)10mm
Supply and Delivery of 200 mm. dia P.V.C. pipe Class- I ( with a loose matching coupler) marking IS No. 4985/ 2000 with latest amendments with free solvent cement. Ivory Grey, both end plain. Length of each straight Pipe 6mts with tolerance (±)10mm
Supply and Delivery of 140 mm. dia P.V.C. pipe Class- I ( with matching coupler ) marking IS No. 4985/2000 with latest amendments with free solvent cement. Ivory Grey, both end plain. Length of each straight Pipe 6mts with tolerance (±)10mm
Supply and Delivery of 140 mm. dia P.V.C. pipe Class-II ( with a loose matching coupler) marking IS No. 4985/ 2000 with latest amendments with free solvent cement. Ivory Grey, both end plain. Length of each straight Pipe 6mts with tolerance (+)10mm
Supply and Delivery of 200X200X200 mm dia P.V.C. Equal Tee duly IS-10124/2009 with free solvent cement.
Supply and Delivery of 140X140X140 mm dia P.V.C. Equal Tee duly IS-10124/2009 with free solvent cement.
Supply and Delivery of 315 mm. dia (IS.No. 10124/2009 Part- 8 with latest amendment) F.T.P.
Supply and Delivery of 200 mm.. dia ( IS. No. 10124/ 2009 Part- 6 with latest amendment) F.T.P.
Supply and Delivery of 160 mm. dia ( IS. No 10124/2009 Part- 6 with latest amendment) F.T.P..
Supply and Delivery of 200 X 140 mm dia.P.V.C. Reducer (Class-II) duly IS-10124/2009 with free solvent cement.
Supply and Delivery of 160 X 140 mm dia.P.V.C. Reducer (Class-II) duly IS-10124/2009 with free solvent cement.
Supply and Delivery of 200 X 160 mm dia.P.V.C. Reducer (Class-II) duly IS-10124/2009 with free solvent cement.
Supply and Delivery of 200 mm. dia 60° ( IS. No. 10124/2009 Part- 8 with latest amendment ) bend
140 mm. dia 90° (IS. No. 10124/ 2009 Part- 8 with latest amendment) bend
Supply and Delivery of 140 mm. dia 60° ( IS No. 10124/ 2009 Part- 8 with latest amendment ) bend
Supply and Delivery of 200 mm. dia IS. NO. 10124/ 2009 Part- 4 with latest amendment End cap.
Supply and Delivery of 140 mm. dia IS. NO. 10124/ 2009 Part- 4 with latest amendment End cap.
Supply and Delivery of Extra Coupler for 315 mm. dia P.V.C. pipe (extra) IS. 10124/2009with latest amendments with free solvent cement.
Supply and Delivery of Extra Coupler for 200 mm. dia P.V.C. pipe ( extra) I.S. 10124/2009, Part- II with free solvent cement.
Supply and Delivery of Extra Coupler for 140- mm. dia P.V.C. pipe (extra) I.S 10124/ 2009, Part- II with free solvent cement.
Supply and Delivery of Extra Solvent cement duly I.S. 14182-1994 with latest amendments
Supply and Delivery of G.I. Quadrupped Set and Inlet & Outlet Pipe Fittings (2 nos. chamber for 1 set) as per drawing &Technical specifications for Major RLI schemes
Supply of 150 mm dia NB Foot Valve (Flanged type) lS -4038 / 1986
Supply of 150 mm dia C.I. Sluice Valve as per IS 14846(ISI MARKED)
Supply of 150 mm dia Alfa Alfa type Valve (C type)
Supply of 90 degree G.I Bend (both end flanged-ISI marked-IS 1239,Galv- IS4736 (I) 150 mm dia
Supply of 90 degree G.I Bend (one end flanged other end free-ISI marked-IS 1239,Galv- IS4736 (I) 150 mm dia
Supply of 90 degree G.I Bend (both end flanged-ISI marked-IS 1239,Galv- IS4736 (I) 150 mm dia long bend (with priming)
150 mm dia CI Non return valve both end flanged and swing type with side by pass arrangement as per IS 5312(Part-I)/2000
Supply of Galv. MS Flanged Pipe ISI markec- IS: 1239, Galv- IS4736 150mm.dia (4.8mm) (ISI MARKED)
Supply of Galv. MS Column Pipe ISI markec- IS: 1239, Galv- IS4736 80mm.dia screwed one end and flanged other end 3 m long
Supply & transportation of MS Shore manifold with painting made of 350 mm dia MS ERW pipe 1.5 mtr long having 2 numbers of 150 mm dia inlet and 3 nos of 150 mm dia outlet all end flanged welded , MS ERW Pipe conferming to IS 1239(Part-I)/3589 Medium and MS Flanged conferming to IS 6392/719tABLE 17) , Flanged thickness of 300 & 150 mm dia 18 and 12 mm respectievely thick +3 mm of raised surface.
Supply and Delivery of 150x300 mm expander MS with both end flanged weld ISI marked
Supply and Delivery of 150 mm dia MS Hose Clamp(45 mm thick, 2 mm width)
Supply and Delivery of 150 mm dia (NB) C.I. Nipple one end threaded & other end grooved
Supply and Delivery of Foundation Bolt for Distribution Chambers (Quadruped Sets) manufactured from 20 mm nominal diameter M.S Rod as per IS 2062/1992. Total length of the Bolt is 375+ 10 mm having welded head 80+ 10 mm in length & 20 mm in nominal diameter with Nut & Bolt
Supply and Delivery of Foundation Bolt for Distribution Chambers (Quadruped Sets) manufactured from 16 mm nominal diameter M.S Rod as per IS 2062/1992. Total length of the Bolt is 375+ 10 mm having welded head 80+ 10 mm in length & 16 mm in nominal diameter with Nut & Bolt
Supply and Delivery of GI Hexagonal Head Bolts & Nuts conforming to IS-1363 (Part-I) 1992 product grade - C with latest ammedments for boths IS-1363 (Part-3) / 1992 of product grade C with latest amount for nuts properties / class for bolt 4.62 nuts for 4.5. M 20x80 mm.
Supply and Delivery of Compresed Asbestos fibre jointing for Quadruped & Tripod set (for raised surface of Flange as per IS-6392) 500mm.dia(Table-5)
Supply and Delivery of ISI marked P.V.C.Flexible Hose pipe as per IS 15265 - 150 mm dia
300 mm dia( Table-11)
200mm.dia( Table-11)
200mm.dia( Table-5)
150mm.dia( Table -17)
80 mm.dia( Table -17)
150mm.dia( Table -5)
Supply and Delivery of 150 mm dia Foot Valve Leather Washer
Supply and Delivery of Electro Motor Pump set , both having ISI Marked, IS-12615 & IS- 6595; Monoblock as per IS 9079 b) 200 M3/hr, 18 m head. (20 HP) Electro Motor Pump set , both having ISI Marked, IS-12615 & IS- 6595; Monoblock as per IS 9079 b) 200 M3/hr, 18 m head. (20 HP)
Supply of Switch Fuse Unit, lSI marked, IS 60947 -63 Amps 415 volts A.C TPN Main Switch. (ISI Marked)
Supply of Switch Fuse Unit, Confirming to IS 60947 -200 Amps 415 volts A.C TPN Main Switch.
MOTOR CONTROLLER, IS 60947 20 HP 3 phase electromagnetic Star- Delta motor controllers with 4 pole heavy duty power contactor, single phasing preventer and normal protective features, MCB, Indicators, push buttons, Ammeter & Voltmeter, All in IP54 encolser of min 16 swg. C R Sheet, 10 tank process powder coat painted and as per technical specification.
Supply of Bus Bar Chambers (As per appvd. existing dwg)-IS60947 -200Amp
25 sqmm 3.5 core Aluminium PVC insulated (Heavy Duty) armoured electric cable duly ISI marked as per IS 7098/1988
50 sqmm 3.5 core Aluminium PVC insulated (Heavy Duty) armoured electric cable duly ISI marked as per IS 7098/1988
Laying of WTA
Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, within a lead of 75 m as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1500 mm.
Earth work in excavation of field trenches as per design section and alignment for laying of pipe lines (PVC, RCC, ACP etc.) upto a depth of 1500 mm all sorts of soils including removing, spreading or stacking extra earth as directed. The item includes necessary trimming of sides trenches, levelling, dressing and ramming the bottom as required complete .
Laying of PVC pipes of different diameters within field trenches in curve/ straight line including using UPVC fittings, Viz. Horizontal and Vertical Bends, riser pipes, Tee Reducer etc.and making leak proof joints with couplers after roghening the surface with wire brush and emery paper and applying solvent cement (The rate is inclusive of transport of pipesfittigs and solvent cement to be supplied by deptt.) all complete asper direction of Engineer-In- charge. i)315 mm.dia
ii)200 mm. dia
iii)140 mm. dia
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.
Filling in foundation or plinth by fine sand in layers not exceeding 15 cm. As directed and consolidating the same by through saturation with water and ramming complete, including the cost of supply of sand.
Ordinary Cement concrete (1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering, reinforcement, if any, in ground floor as per relevant IS code. a) Pakur Variety (Stack yard to site distance= 40 KM)
Ordinary Cement concrete (Mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(a) Pakur vareity
Hire and labour charges for shuttering with centering and necessary staging upto 4 metre using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). Above 30 mm. to 37 mm. thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structure including distribution bars, stirrups, binders etc. including supply of rods, initial straightening of bend bars excluding coil bars and removal of loose rust (if necessary) cutting to requisite length, hooking, bending to correct shape, placing in proper position and binding with 1.626 mm (16 SWG) black annealed wire at every inter section complete as per drawing and direction including cost of wire upto 1st floor level. ( For Tor steel). for SAIL /TATA /RINL
Brick work with Ist class brick in cement mortar (1 : 6) . (a) In foundation and plinth
Brick work with Ist class brick in cement mortar (1 : 6) . (a) In superstructure ground floor.
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 15 mm thick plaster.
Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete.
Earth work in filling in trenches after laying pipe lines (PVC, RCC, ACP etc.) with good earth obtained from excavation of field trenches in layers not exceeding 225 mm, including watering and ramming etc. layer by layer complete. (Payment will be made on the basis of measurement of finished quantity of work.)
Labour charges for fitting and fixing and laying , where necessary of fowlling M.S/G.I. /E.R.W pipes and accessories (to be supplied deparmentally) including transportation of the same cutting, threading, jointing & making leak proof threaded / flanged joints at site, by using scoket/ rubber insertion, nuts and bolts etc., maintaing the proper alignment and level / all complete / as per direction of E-I-C. (a) 150 mmm dia E.R.W Pipe.
Fitting and fixing of M.S. I G.I. I C.l.accessories and special in pipe line (accessories & special to be supplied departmentally) including supply of jointing materials viz.rubber insertion, nuts & bolts, havoc Zink (Zink Oxide) complete as per direction of Engineer-in-Charge. (iv) 150mm. dia. C.1.sluice valve
Erection, fitting and fixing set of M.S Quadrupped inlet and outlet pipe fittings for Ist chamber and 2nd chamber of Major RLI scheme.(Rate inclusive of transportation from Deptt. Store to work site).
Labour charges for fitting and fixing 150 mm. diaAlfa Alfa G type valve with 140 mm. dia class-II U.P.V.C riser pipe with the help of flanged P.V.C tail piece by joining the P.V.C end of Tail piece and riser pipe with coupler and flanged end of tail piece and flap valve with rubber insertion , nuts and bolts etc. complete.
(ii) 150 mm dia MS 90 degree bend both end flanged weld
Installation / Erection of SurgeTank / Shore manifold (to be supplied from Deptt. free of cost) over a rigid base of cement concrete (1`:2:4) with stone chips 20mm. down of 1250 mm X 1250 mm X 150 mm. over a single layer of brick flat soling and embedding the legs of the surge tank/shore manifold within the concrete base including cost of all materials and labour and as per direction of Engineer-in-Charge.
Supplying, fitting and fixing including transportation of Sign board of MS fabricated Structure Sheet Size 2 m x 1 m x 1.5 mm thick, MS flat bar (40 mm x 6 mm) welded with frame with 2 nos. MS Angle post (45 mm x45 mmx6mm) of 2.44 m length embeded 0.6 m into 1:2:4 Cement Concrete pasting flex on the MS Sheet ( 2 m x 1 m) as approved signage. This will include Civil construction works of foundation, Painting , material , fitting fixing and labour complete as per Drawing and direction of EIC.
Placing and positioning the Centrifugal pump motor set on the pump base / pump house floor, aligning properly with necessary packing and fixing the set with holding down nuts and washer including cutting holes of requisite size in the floor / base, grouting the bolts and mending good all damages complete as per direction of the Engineer-in-Charge.
Testing of pipe line system against leakage by fillinh the distribution chamber with water and supplying water through the entire pipe line net work for atleast4 (Four) hours including hiring and transport of suitable generstor , pump , tools and plants, fuel and lubricants and installation of the pump connecting the same with pipe line network making necessary electrical connection and dismantling all these after completion of test all complete as per direction of Engineer -In -Charge.
Patch / Doubling work with 5 mm MS plate including weld gas cutting fitting fixing
Add extra carriage besides initial transport by truck of the pipes and constructional materials@4% on every item as applicable
GST @ 18% on every item from (Sl no 2.01 to 2.28)
Labour welfare Cess@1%on every item from (Sl no 2.01 to 2.29)
Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, within a lead of 75 m as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1500 mm. (considering 50 mm clearence)
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Ordinary Cement concrete (Mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(a) Pakur variety
Ordinary Cement concrete (Mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(a) Pakur variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 metre using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). 25 mm. to 30 mm. thick wooden shuttering.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor / upto 4m. Tor steel/Mild steel ( Other than SAIL/ TATA/RINL) i)For foundation Blocks of Water Distribution System
Brick work in cement mortar (1 : 6) with first class kiln burnt bricks including racking out joints, scaffolding and other incidental works etc. complete. a) In foundation & plinth.
b) In superstructure ground floor
Plaster (to wall, floor, ceiling etc.) with (1:6) sand and cement mortar including rounding off or chamfering corners, as directedand racking out joints or roughening of concrete surface including throating. Nosing and drip course as necessary at ground floor. (a) 15 mm thick (1:6) proportion.
b) 20 mm thick with 1:6 cement mortar.
c) 10 mm thick with 1:4 cement mortar.
25 mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Water proofing as per item 9, polymer based paint as per item 8 (a) of subhead C of Section (C).
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor.3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement(ii) 25 mm. thick
Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete.
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor.(ii) Grill weighing above 16 Kg./sq.mtr and above.
Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150 mm apart complete in all respect as per design including cost of all labour and materials.
Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete . A) UPVC Pipes:(i) 75 mm. Dia
B) UPVC Fittings:a) Plain Tee (i) 75 mm. Dia
c) Bend 87.5 degree (i) 75 mm. Dia
Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 150 mm. Including watering and ramming etc. layer by layer complete with earth obtained from excavation of foundation.
Priming one coat on steel or other metal surface with synthetic enamel / oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary. Two coats (super gloss hi- gloss except white) Steel surface iv) Two coats (with any shade except white)
White washing including cleaning and smoothening surface thoroughly (5 parts of stone lime and 1 part of shell lime should be used in finishing coat) all floor
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification.
Suppling 1 mtr x 0.6 m x 24 swg MS board contaning list of spout wise water users by making numbers of spout as directed by EIC. The board should have base colour - Black and words - White to be fitted and fixed on the wall of the pump house.
Add 4% Carrige as applicale of Construction of Pump House
GST @ 18% on every item from (Sl no 3.01 to 3.27)
Labour welfare Cess@1%on every item from (Sl no 3.01 to 3.28)
Supplying,fitting & fixing of M.S. angle (Size: 50 mm x 50 mm x 6 mm) including gas cutting etc.(WRDD schedule Page-31, Item no-7,Sl no-8(b))
Supplying, fitting & fixing 350 mm x 250 mm x 25 mm size Wooden Plank on wall I(for fitting & fixing of electrial equipments as necessary on the plank). (WRDD schedule Item no-9 ,Page-42,Sl no-8)
Supply, Fitting & fixing of DPIC main switch 15/16A 240 Volts (Havells) on board on wall including mending good the damage for light circuit of pump house (PWD elec. Sh. Page-D-1,item -1(a)
Supplying & Fixing bulk head light fitting (Havells make) with die cast aluminium housing & frosted glass on wall/ceiling incl. S&F 8watt CFL / 100 watts GLS lamp complete set (PWD elec. Sh. Page-D-13,item- 1(23)
Supply & Fixing of 20 watt single / twin florescent light fitting complete with all accessories directly on wall / ceilling / TW round block and suitable size of fastener ..((PWD elec. Sh. Page-D-13,item- 24)
Wiring from 15/16A DPIC main switch to Busbar box in 1.1KV grade single core stranded 'FR' PVC insulated and unsheathed copper wire (Finolex/havells/KDK) of 2 x 36/0.3(2.5 Sq. mm) + 1 x 22/0.3(1.5 Sq. mm) in PVC casing capping (Precision make) including necessary PVC clips,fittings etc incl supply of wire. (PWD elec. Sh. Page-E-11,,item-1)
Wiring from 15/16A DPIC main switch to BDB in 1.1KV grade single core stranded 'FR' PVC insulated and unsheathed copper wire (Finolex/havells/KDK) with 2X 36/0.3(2.5 Sq. mm) + 1 X 22/0.3(1.5 Sq. mm) in PVC casing capping (Precision make) including necessary PVC clips,fittings etc.incl supply of wire (PWD elec. Sh. Page-E-11,,item-1)
Distribution wiring in 1.1KV grade 2 x 22/0.3 (1.5 Sq. mm) single core stranded 'FR' PVC insulated and unsheathed copper wire (Finolex/havells/KDK) with 1X22/0.3 (1.5 Sq. mm) single core stranded 'FR' PVC insulated and unsheathed copper wire for ECC, including necessary PVC clips,fittings etc. to light/fan/calling bell with piano key type switch of (Anchore make) fixed on sheet steel fabricated switch board with perspex/ bakelite top cover on wall including necessary connections and making earthing attachments and mending good damages to the building works incl. supply of wire.[PVC casing capping and switch board both on surface] average run 5 meter (PWD elec. Sh. Page-E-21,,item-1(a)
Distribution wiring in 1.1KV grade 2X22/0.3 (1.5 Sq. mm) single core stranded 'FR' PVC insulated and unsheathed copper wire (Finolex/havells/KDK) with 1X22/0.3 (1.5 Sq. mm) single core stranded 'FR' PVC insulated and unsheathed copper wire for ECC, including necessary PVC clips,fittings etc. to 5amps 3 pin flush type plug socket with piano key type switch of (Anchore make) fixed on sheet steel fabricated switch board with perspex/ bakelite top cover on wall including necessary connections and making earthing attachments and mending good damages to the building works.[PVC casing capping and switch board botyh on surface] average run 1.5 meter (PWD elec. Sh. Page-E-22,item- 5(6)
Fitting & fixing of 200A 500 V iron clad/ sheet steel TP/ TPN main switch on iron legs on wall.(PWD elec. Sh. Page-C-1,item-1 )
Fitting & fixing of 63A 500 V iron clad/ sheet steel TP/ TPN main switch/isolators on iron legs on wall . (PWD elec. Sh. Page-C-1,item-1)
Fitting & fixing of only 200A 500V iron clad M.S. sheet metal busbar chamber on angle iron frame on wall for 4 bars 63Amps .( PWD elec. Sh. Page-C-1,item-6 )
Fitting & fixing of Star - Delta starter (for 20 HP motor contol) on angle iron frame on wall . (PWD elec. Sh. Page-C1,item-7(b) )
Fitting & fixing of Volt meter and Ammeter with necessary screws and other fixing materials including making holes where necessary and making connections (PWD elec. Sh. Page-C-2,item-10)
Supplying and Drawing with 1.1 KV, PVC flexible 'FR' cables copper conductor conforming to IS 694 in suitable size with fitting and fixing on wall/Kiosk Box, including making necessary connection to the pre-fixed devices with all necessary accessories like saddle, screw, clips, gland, socket etc. conforming to lEE regulation and as per direction of EIC. (Brand: Gloster/Havells/Finolex) [a] For Major RLI. (i) 4Cx 25 sqmm Copper cable conforming to IS 694 in [100/200 A TPN switch to BUS-bar
(ii) 3C X 16 sqmm copper cable conforming to IS 694 [Busbar to 63 A, TP Main switch and 63 A TP switch to Motor starter] ( WRDD SOR 2018/ Ch-6.0 para-9.0 sl-14 page 42 )
(iii) 2 X 3C X 10 sqmm copper cable conforming to IS 694 in 32 mm GI conduit (lSI-Medium quality) IfStar-DeltaMotor starter to Motor] WRI&DD SOR 2018/ Ch-6.0 para-9.0 sl-14 page 42
Suppling & fitting & fixing of danger Board (mannual) 4"x6" in two distinguishing position in the door of pump house (outside) and at the palce of panel board. (PWD elec. Sh. Page-D-13, item- 21(a))
Earthing with 50 mm (2") dia Galvanized iron pipe(TATA MAKE) 3.64 mm thick X 3.04 mtr.(10ft) long and 1X4 SWG G.I.(Hot Dip) Wire (4 mtr. Long ) 13 mm (1/2") dia X80 mm (3") long G.I. Bolts, double nuts and double washer including S&F 15 mm dia G.I. Pipe protection (1 mtr) long to be fitted with bitumen partly under the ground level and partly above the ground level driven to an average depth of 3.56 mtr. (12") below the ground level and restoring the surface duly rammed for Soft/Morrum soil by ISI-Medium G.I. Pipe (PWD elec. Sh. Page-G-1,item-2(a) )
Installation of Electro motor pumping set of any make- brand and for RLI scheme on pump foundation over SAL sleeper(to be sublied departmentally) by supllying and fixing nuts and bolts and making connection of suction hose and foot valve with necessary fitting at the enlet end of the water pump and fitting fixing of 90 degree MS priming bend Sluice valve and delevery hose with all necessary fitting at the deevery end of the water pump, duly connected with pipe line maintainig proper allingment and level including cutting holes on the wall and pump base of the pump house where necessary, mainding good damages after complition of the works as per direction of Engineer -In -Charge.(Pump Set and all accessaries will be suplied departmenatally (a) For Major RLi schemes. [Ref:-WRIDD SOR 2018 , 8.00 carriage of materials, item no -15 page no -16]
Supplying and fixing earth bar of galvanized M.S. Flat 25 mm × 6 mm on wall having clearance of 6 mm. from wall including providing drilloed holes (on busbar) about 3 cm. apart complete with G.I. bolts, nuts, washers etc. as required for tapping.(PWD elec. Sh. Page-G-2, item-4a)
Connecting the equipments to earth busbar including supplying and fixing G.I. Wire No. 8 SWG on wall/floor with stapples burried inside floor/wall as required and making connection to equipments with bolts, nuts, washers, cable, lugs etc. as required and mending good all the damages..(PWD elec. Sh. Page-G-2, item-5a)
Suppling fitting & fixing of shock treatment chart in a wooden frame with brass. (Passed rate of SE(A-M) Burdwan (A-M) Circle)
Add 18% GST from tem no 4.01 to 4.23
Add 1% Labour cess from tem no 4.01 to 4.24
ENERGISATION: Materials PCC Pole 9 Meter Long
PCC Pole 8 Meter Long
M.S. CHANNEL 75 X 40 MM
M.S ANGLE 65 X 65 X 6 MM.
M.S. FLAT 65 X 6 MM
GI STAY SET HT (1830X20MM)WRKG LD-7900KG
GI STAY WIRE 7/3.15MM (7/10 swg) H.T.
Porcelain guy insulator HT
GI STAY SET HT (1830X20MM)WRKG LD-7900KG
GI STAY WIRE 7/3.15MM (7/10 swg) H.T.
Porcelain guy insulator LT
GI EARTH SPIKE 1833X20 MM
G.I. WIRE 5 MM.
11KV Polymer disc insulator 45KN
Hardware fittings 30/50 sq.mm
11KV Polymer Pin insulator 45KN
TPGO ISOLATOR 200 Amps
Transformer 63KVA
Turn Buckle
LT DIST KIOSK FOR 63 KVA TRNF(SMC/FRP)
PVC cable 50 sqmm4 core
COND ACSR 50 sq. mm
LA 12KV (5KA) FOR 11 KV
CE AB cable
EYE FOR ANCHOR & SUSPENTION CLAMP
DEAD END CLAMP LT ABC
SUSPENTION CLAMP
I.P.C 50.70 SQ MM
LT DIST Box 3 PH
GI shackle 9' with nut & bolt
Porcelain shackle insulator 3" x3 1/2"
Labour Cost: Survey of SURVEY OF HT OH LINE
SURVEY OF LT OH LINE
Survey of GIS point
Painting of GIS Code
Erection of Sub Stn DP Structure by PCC Pole 9mtr. Long Comp. with all fittings and foundation but w/o any insulator and with paint
Erection of single PCC Pole 8 mtr.
Erection of PCC Pole Long Comp. with all fittings and foundation upto 3 mtr but w/o any insulator and with paint
Erection of Stay set comp. H.T.
Erection of Stay set comp. L.T.
Earthinng Complete
Fixing of Solid Tee-Off Bracket on Double pole
STRINGING & SAGGING WITH ACSR 50 SQ MM X 3 WIRE
Fixing of 11 KV TPGO on sub-Stn. Structure with proper adjustment
Fixing of 11KV Pin insulator
Fixing of 11KV Disc insulator
Erection of Dist. Transformer 63KVA ,11/0. 43
Pipe Earthing DTR neutra point
Fixing of L.T. Kiosk and Comp. connection , Single CKT
Fixing of 11 KV lightning Arrestor on structure
Fixing of L.T. Shackle insulator
Drawal of LT AB cable
Fixing of dead end clamp
Fixing of Suspension clamp
Fixing of pc ABC to ABC Tee Joint
Erection of Stay set comp. H.T.
Supervision charge @10 % on( Material+labour cost)
Cess @ 1% on Labour Charge,materials cost and supervision
Quotation Money including supervision charge , security deposits & GST 18% on supervision charge+ labour charge
Formation, Strengthining and capacity building of WUA: Campaigning in the command area of New Major RLI Sub-project by community workers for mass awareness , capacity building to achieve sustainability of Sub-projects. Cost include wage payment to community workers, transportaton, leaflet etc.[Approved estimate regarding activities for institutional development for sustainability of project
Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges [Approved estimate regarding activities for institutional development for sustainability of project
Registration Cost for WUA under suitable act ( Society ) deed writing including registration charge, conveyance cost & opening of Bank A/C Charges etc [Approved estimate regarding activities for institutional development for sustainability of project
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge ( rate on meeting ) [Approved estimate regarding activities for institutional development for sustainability of project
Meeting and onsite demonstration for operation & maintenance of one New Major RU , water manangement and mode of collection of water tax, building of corpus fund etc [Approved estimate regarding activities for institutional development for sustainability of project
IEC Materials ( Leaflet, poster, notebook )= 8 meetings, for SL - 2 and SL-4 [Approved estimate regarding activities for institutional development for sustainability of project
Documentation Cost for activities of WUA Scheme - by still photography, report booklet etc in both hard and soft copy.[Approved estimate regarding activities for institutional development for sustainability of project
Impact study & monitoring of scheme by site visit of 2 Community workers during 3 years' period [Approved estimate regarding activities for institutional development for sustainability of project
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.14 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2379789.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid