Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.7 LAccepted-AOC | ₹56.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹60.1 LRejected-Finance 115 VILLAGE BAHIN TEHSIL HATHIN DISTT PALWAL 121105 | HATHIN | PALWAL | HARYANA | 121105 | ₹60.1 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Naresh Kumar Contractor L1 | JAGBIR SINGH COONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00NS Items | |||||
| 1.01 | Supply of cable complete with necessary connections 16 sqmm 4 core armaured cable Complete. | 50 | Per Metre | 700 ₹35,000 | 900 ₹45,000 |
| 1.02 | S/E of 45 watt LED street light fitting, potted driver, toughened glass and aluminium dia cast body (Philips/ Bajaj/ Crompton/ Wipro/ Havells/ Halonix/ Surya) make including making necessary connetions. | 4 | Each | 3,000 ₹12,000 | 4,000 ₹16,000 |
| 1.03 | S/E of copper pipe for split Air Conditioner (A.C.) including making necessary connections and all patty material required to complete the job in all respect. | 6.09 | Metre | 1,000 ₹6,090 | 1,500 ₹9,135 |
| 1.04 | S/E of PVC Drain Pipe for split A.C. including making necessary connections and all patty material required to complete the job in all respect. | 9.14 | Metre | 300 ₹2,742 | 500 ₹4,570 |
| 1.05 | S/E of 20 watt LED tube light fitting (Philips/Bajaj/Crompton/Wipro/Havells/Surya) make including all patty material required to complete the job in all respect. | 20 | Each | 200 ₹4,000 | 300 ₹6,000 |
| 1.06 | SULPHATE CHLORIDE | 187 | Sqm | 800 ₹1.5 L | 1,100 ₹2.1 L |
Tender Value
₹50.6 L
EMD Value
₹1.0 L
Closing Date
1 Apr 2026, 5:00 pmClosed
YOGESH SHARMA
Executive Engineer Mewat
CONSTRUCTION OF SUB HEALTH CENTRE (SHC) AT VILLAGE ADBAR, Block Nuh, Distt Nuh
2026_HRY_510967_1
2026E60D7464 68C7 4FFC 94BB 534B59D724DD696DEV
Open Tender
Civil Works
180 days
ADBAR
2 documents required · 2 mandatory
₹5,000
₹1.0 L
Yes
24 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
1 Apr 2026
25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0.0 | NS Items | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 1.01 | Supply of cable complete with necessary connections 16 sqmm 4 core armaured cable Complete. | - | Per Metre | - | - | - |
| 1.02 | S/E of 45 watt LED street light fitting, potted driver, toughened glass and aluminium dia cast body (Philips/ Bajaj/ Crompton/ Wipro/ Havells/ Halonix/ Surya) make including making necessary connetions. | - | Each | - | - | - |
| 1.03 | S/E of copper pipe for split Air Conditioner (A.C.) including making necessary connections and all patty material required to complete the job in all respect. | - | Metre | - | - | - |
| 1.04 | S/E of PVC Drain Pipe for split A.C. including making necessary connections and all patty material required to complete the job in all respect. | - | Metre | - | - | - |
| 1.05 | S/E of 20 watt LED tube light fitting (Philips/Bajaj/Crompton/Wipro/Havells/Surya) make including all patty material required to complete the job in all respect. | - | Each | - | - | - |
| 1.06 | SULPHATE CHLORIDE | - | Sqm | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_589767.xls
BOQ • 0.25 MB
AD0151495.pdf
Additional Documents • 1.50 MB
Download all tender documents and submit your bid