| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-Finance 1 6 1 NETAJI NAGAR JADAVPUR KOLKATA WEST BENGAL 700092 UDYAM WB 10 0030905 | KOLKATA | WEST BENGAL | 700092 | ₹11.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹11.9 LRejected-Finance 94 9 DAYANAGAR ROAD COSSIMBAZAR MURSHIDABAD W B 742102 | MURSHIDABAD | MURSHIDABAD | WEST BENGAL | 742102 | ₹11.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹12.3 LRejected-Finance | ₹12.3 L | L3 | Rejected-Finance L3 |
Tender Value
₹11.7 L
EMD Value
₹23,500
Closing Date
16 Jan 2026, 1:00 pmClosed
Director_General_Park_and_Square
5, S N Banerjee Road, Kolkata-700013
IMPROVEMENT OF PAVER BLOCK PATH WAY AT WATER BUSTER PUMPING STATION(SIRITY SASHAN) IN WARD NO-116,BR-13.
2025_KMC_980371_1
KMC/DG_PS/XIII/116/64/25-26
Open Tender
CIVIL WORKS
45 days
Kolkata
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹23,500
23 Apr 2026
29 Dec 2025
19 Jan 2026
30 Dec 2025
16 Jan 2026
30 Dec 2025
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)d)Silver Sand. Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible. 3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable. (6th Corrigenda & addenda dated 29.07.2019)
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 5. Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (b) (iii) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. ( 3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)
SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK AVEMENTS (ICBP)WITH CONCRETE BLOCKS( WITH CONCRETE GRADE AS PER TABLE I OF IS 15658 : 2006) MANUFACTURED FROM BIS LICENSEE ANUFACTURER, WITH SPACER WITH (SMALL PROTUDING PROFILES ON THE VERTICAL FACE OF A PAVERBLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCKS AS PER CI NO. 3.26 OF IS 15698) AND OF SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO (THE RATIO OF LENGTH TO THICKNESS OF A PAVERBLOCK, AS PER CL. NO. 3.3 OF I.S 15658) ON THE PREPARED BASE COURSE OF SPECIFIED CBR AS PAR TABLE I OF IRC SP- 63 (2018) OR ELSE AS MENTIONED IN DESIGN AND DRAWING WITH A CUSHION OF COMPACTED BEDDING SAND OF 25 MM -35 MM THICK (GRADING OF THE BRDDING SAND AS PAR CLAUSE 6.5.1 OF IRC SP 63) AND FILLING UP THE GAPS IN BETWEEN PAVERBLOCKS WITH JOINT FILLING UP THE GAPS IN BETWEEN WITH JOINT FILLING SAND (THE GRADING OF THE JOINT FILLING SAND WILL BE AS PAR CLAUSE 6.5.2 OF IRC SP-63(2018)WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND ,COMPACTION, LEVELLING, AND FILLING UP OF THE EDGE GAP. 50 MM THICK
BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 31. Supplying, fitting & fixing granite tiles 10mm to 12mm. thick in columns, wall, facia etc. with 15 thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks including pointing in cement mortar (1:2) (1 white cement : 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of the Engineer-in-charge including cost of all materials, labours, scaffolding, staging ,curing and roughening of concrete surface complete. [Using cement slurry at back side of tiles@ 4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m] Area of each slab upto 0.2 Sq.m (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25%for each addl. floor above 4th floor) (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking thephysical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld. (3rd Corrigenda & addenda dated 04.06.2018)
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Ten_and_dec.pdf
Additional Documents • 0.61 MB
BOQ_2390273.xls
BOQ • 0.29 MB
Ten_Doc.pdf
Tender Documents • 1.09 MB
SPE_CON.pdf
Additional Documents • 0.46 MB
Download all tender documents and submit your bid