| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹9.6 LRejected-Finance | ₹9.6 L | L2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | KRISHNAMOORTHY L1 | BARGUNAN P L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the old damaged RCC Slab etc compliete., | 2 | m3 | 4,308 ₹8,616 | 4,310 ₹8,620 |
| 2.00 | Dismantling the Old damaged PCC Wall etc.,complete | 20 | m3 | 486 ₹9,720 | 490 ₹9,800 |
| 3.00 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 6 | m3 | 218 ₹1,308 | 220 ₹1,320 |
| 4.00 | Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers including Refilling. | 4 | m3 | 160 ₹640 | 165 ₹660 |
| 5.00Supplying and delivery of 9'' dia (230mm )stoneware pipe inlcuding spun yarn cement moratar and labour charges etc., complete | |||||
| 6.00 | 230mm 9// dia stone ware pipe | 6 | m | 1,177 ₹7,062 | 1,200 ₹7,200 |
| 7.00 | 300mm dia 12'' dia stone ware pipe | 6 | Rm | 1,708 ₹10,248 | 1,780 ₹10,680 |
| 8.00 | Refilling trenches with selected excavated soil in layers not exceeding 20cm in depth ramming and Consolitaion of each layer watering etc.,all complete per standard specifications and as directed by the departmental engineer. | 3 | m3 | 40 ₹119.88 | 50 ₹149.85 |
| 9.00 | Suppling and erecting CENTERING for sides and soffits including supports and strutting upto 3.00m high for plane surfaces such as RCC Side for Drain Wall in all floors with all cross bracing using mills steel sheets of size 90cmx60cm an DBG 10 stiffened with welded mild steel angles of size 25mm .3mm for boarding laid over country wood joints of size 10cmx6.50 cm spaced at about 90cm centre and supported by cauuarinas props of 10cm to 13cm dia spaced at 75cm center to center etc compiete and directed . | 17 | m2 | 524 ₹8,908 | 530 ₹9,010 |
| 10.00 | Plain Cement concrete of 1:2:4 using 20mm jelly for chamber side wall | 5 | m3 | 7,372 ₹36,860 | 7,377 ₹36,885 |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
7 Jan 2026, 3:00 pmClosed
Commissioner Cuddalore Corporation
Bharathi Road,Cuddalore City Municipal Corporation Office, Cuddalore
CUDDALORE CORPORATION - Raising of existing UGD chambers at ward areas 01 to 45 wards in cuddalore corporation.
2026_MAWS_639672_1
ROC.NO.249/2024/E3
Open Tender
Civil Works
90 days
WORK
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,500
Yes
17 Feb 2026
6 Jan 2026
7 Jan 2026
6 Jan 2026
7 Jan 2026
6 Jan 2026
Dismantling the old damaged RCC Slab etc compliete.,
Dismantling the Old damaged PCC Wall etc.,complete
Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS
Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers including Refilling.
Supplying and delivery of 9'' dia (230mm )stoneware pipe inlcuding spun yarn cement moratar and labour charges etc., complete
230mm 9// dia stone ware pipe
300mm dia 12'' dia stone ware pipe
Suppling and erecting CENTERING for sides and soffits including supports and strutting upto 3.00m high for plane surfaces such as RCC Side for Drain Wall in all floors with all cross bracing using mills steel sheets of size 90cmx60cm an DBG 10 stiffened with welded mild steel angles of size 25mm .3mm for boarding laid over country wood joints of size 10cmx6.50 cm spaced at about 90cm centre and supported by cauuarinas props of 10cm to 13cm dia spaced at 75cm center to center etc compiete and directed .
Plain Cement concrete of 1:2:4 using 20mm jelly for chamber side wall
Supplying and fixing of Steel steps for chambers etc., complete.
Plastering with cement mortar 1: 5 mix (One cement and five sand) 12 mm thick including cost and conveyance of all materials,finishing,curing,and all labour chargesetc.completeas Standard specification.
Suppling and erecting CENTERING for sides and soffits including supports and strutting upto 3.00m high for plane surfaces such as RCC Side for Drain Wall in all floors with all cross bracing using mills steel sheets of size 90cmx60cm an DBG 10 stiffened with welded mild steel angles of size 25mm .3mm for boarding laid over country wood joints of size 10cmx6.50 cm spaced at about 90cm centre and supported by cauuarinas props of 10cm to 13cm dia spaced at 75cm center to center etc compiete and directed .
Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc..,
Supplying and fixing of SFRC manhole cover of size with heavy duty outer iron frame and 600mm diameter frame, counter sunk holding screws, etc., complete complying with standard specification at all leads & lifts
Reinforced Cement concrete M20 (Mix 1:1 ½ :3 one part of cement, one half parts of sand and three parts of 20mm hard blue granite metal by volume, characteristic strength not less than 20 N / Sqmm machine mixed, for all reinforced cement concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., completer complying with the relevant standard specification at all leads inside the building.
Conveyance the excess earth or earth not suitable for refilling, dumpling and spreading, leveling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete
For GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_765825.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_765825.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid