Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | -15.01% | ₹8.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.5 L+₹19,595.29 (2.35%)Admitted-Finance C 185 G NO 7 GANGA VIHAR DELHI 110094 | NORTH EAST DELHI | DELHI | 110094 | -13.01% | ₹8.5 L+₹19,595.29 (2.35%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 L+₹47,126.68 (5.66%)Admitted-Finance | -10.20% | ₹8.8 L+₹47,126.68 (5.66%) | L3 | Admitted-Finance |
Tender Value
₹9.8 L
EMD Value
₹19,595
Closing Date
7 Jul 2026, 1:00 pmClosed
Executive Engineer
12, Cavalry Lane, Engineering Department, University of Delhi, Delhi-110007
Distempering, painting and Repair work in staircase, waiting area and corridors of ISHW Dhaka, University of Delhi
2026_DU_914474_1
CEET-185
Open Tender
Civil Works
Works
45 days
North Campus
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Registrar, University of Delhi
₹19,595
16 Jul 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. Bars upto 12 mm diameter | - | meter | 8.03 | - |
| 2 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect. SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | 0.4 | sqm | 137.39 | ₹54.96 |
| 3Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2). | |||||
| 3.01 | 25 mm average thickness in 2 layers. | 25 | sqm | 571.49 | ₹14,287.25 |
| 3.02 | 50 mm average thickness in 3 layers. | 25 | sqm | 1,142.98 | ₹28,574.5 |
| 4 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) | 75 | sqm | 400.63 | ₹30,047.25 |
| 5 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | 2,700 | sqm | 166.48 | ₹4,49,496 |
| 6 | Providing and applying white cement based putty of average thickness 1 mm,of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 2,300 | sqm | 151.84 | ₹3,49,232 |
| 7 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. Complete. | 2,700 | sqm | 24.47 | ₹66,069 |
| 8 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | 53.17 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_961025.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .