| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1 CrAdmitted-Finance AIGAVAN UPARHAR DHARM RAJ MISHRA AIGAVAN UPARHAR MAHILA UPARHAR KARARI KAUSHAMBI UTTAR PRADESH 212216 UDYAM UP 46 0007784 | KAUSHAMBI | UTTAR PRADESH | 212216 | ₹1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 CrAdmitted-Finance NAGAON ASSAM | ₹1.0 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per Technical bid/ Comparative Statement bidder is Non - Responsive |
| Sl No | Description | Qty | Unit | Dilip Kumar Bora L2 | Shiv construction Company L1 |
|---|---|---|---|---|---|
| 1.00civil work | |||||
| 2.00 | 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 173.21 | Cum | 301 ₹52,137.11 | 296 ₹51,271.05 |
| 3.00 | 11.1 Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks:
11.1.1 1:4 (1 cement : 4 coarse sand) sqm | 166.65 | sqm | 984 ₹1.6 L | 966 ₹1.6 L |
| 4.00 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.2 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.62 | cum | 8,173 ₹1.0 L | 8,027 ₹1.0 L |
| 5.00 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 4,362.61 | kg | 94 ₹4.1 L | 92 ₹4.0 L |
| 6.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 410.98 | sqm | 323 ₹1.3 L | 318 ₹1.3 L |
| 7.00 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 37.42 | cum | 8,782 ₹3.3 L | 8,626 ₹3.2 L |
| 8.00 | 6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand | 17.69 | cum | 7,226 ₹1.3 L | 7,097 ₹1.3 L |
| 9.00 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 57.97 | cum | 2,269 ₹1.3 L | 2,229 ₹1.3 L |
| 10.00 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22A.1 Mild steel and Medium Tensile steel bars
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 12,202.38 | kg | 94 ₹11.5 L | 92 ₹11.2 L |
Tender Value
₹1 Cr
EMD Value
₹2 L
Closing Date
10 Apr 2026, 2:00 pmClosed
Managing Director
Office of the Managing Director, APTDC Ltd., Ganeshguri, Ghy, 5
Infrastructure Development at Mushalpur College under Chapaguri LAC in Baksa District..
2026_WPTBC_52148_1
PTDC/Engg/2026-27/546
Open Tender
Civil Works
360 days
Baska
Please refer tender document
3 documents required · 3 mandatory
₹5,000
₹2 L
Yes
Managing Director, APTDC Ltd., Ganeshguri, Ghy, 5
11 May 2026
20 Mar 2026
10 Apr 2026
20 Mar 2026
10 Apr 2026
20 Mar 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1civil work | ||||||
| 2 | 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 173.21 | Cum | 286.85 | ₹49,686.15 | item2 |
| 3 | 11.1 Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks:
11.1.1 1:4 (1 cement : 4 coarse sand) sqm | 166.65 | sqm | 937 | ₹1,56,149.18 | item3 |
| 4 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.2 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.62 | cum | 7,783.65 | ₹98,253.01 | item4 |
| 5 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 4,362.62 | kg | 89.65 | ₹3,91,108.43 | item5 |
| 6 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 410.98 | sqm | 307.95 | ₹1,26,561.6 | item6 |
| 7 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 37.42 | cum | 8,364 | ₹3,12,972.52 | item7 |
| 8 | 6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand | 17.69 | cum | 6,882 | ₹1,21,715.05 | item8 |
| 9 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 57.97 | cum | 2,161.2 | ₹1,25,289.09 | item9 |
| 10 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22A.1 Mild steel and Medium Tensile steel bars
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 12,202.38 | kg | 89.65 | ₹10,93,943.55 | item10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
SBD.pdf
Tender Documents • 1.10 MB
BOQ_82543.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid