Tender Value
₹1.4 L
EMD Value
₹3,380
Closing Date
28 Sept 2026, 11:00 amDue tomorrow
Sr. Excutive Engineer ES Div Electrical System
Sr. Excutive Engineer ES Div Totu shimla.
Tender for demolition of cracked and settled cement concrete area of Stub-A and its re-laying in RCC with soling underneath, c/o surface drain on back side of Stub-A for diversion of run-off water coming from uphill side of T-6 of 66kV D/C LILO line
2026_HPSEB_143168_1
ESDS-08/2026-27
Open Tender
Civil Works
Percentage
60 days
Chailla Kainchi
please refer Tender Documents
4 documents required · 4 mandatory
₹590
Yes
₹3,380
Yes
28 Sept 2026
10 Sept 2026
28 Sept 2026
10 Sept 2026
28 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 166kV D/C LILO line to sub-station Sainj | |||||
| 1.01 | Demolition cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer- in – charge a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 1.02 | cum | 959.61 | ₹974 |
| 1.02 | Demolition of Dry Stone filling in floors, behind retaining walls, recharge pit, of the required thickness in all lifts and staking the same within tower area. | 3.11 | cum | 417.06 | ₹1,297.47 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m, in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kind of soil. | 2.94 | cum | 163.75 | ₹481.43 |
| 1.04 | Filling, spreading & leveling of Removed/ Stacked stone boulders in item No.2 above in floors, behind retaining walls, recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer- in- charge ( Labour rate). | 3.08 | cum | 417.06 | ₹1,285.8 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level : a) 1:5:10 ( 1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.89 | cum | 4,476.56 | ₹8,451.75 |
| 1.06 | Steel reinforcement for R. C. C work including straightening, cutting bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe- 500D or more. | 17.38 | kg. | 73.42 | ₹1,276.04 |
| 1.07 | Centering and shuttering including strutting propping etc. and removal of form all heights: Foundations, footings, bases of columns, etc. for mass concrete | 13.66 | Sqm. | 206.79 | ₹2,824.75 |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering shuttering, finishing and reinforcement – All work plinth level : 1:1.5:3 ( 1 cement : coarse sand) : 3 graded | 3.16 | Mtr. | 6,358.9 | ₹20,094.12 |
| 266kV Gumma Hulli transmission line | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tenderdocuments.pdf
Tender Documents • 0.49 MB
Technocommercial.xls
Additional Documents • 0.06 MB
BOQ_212685.xls
BOQ • 0.30 MB
corrigendum2NIT8.pdf
PDF • 0.29 MB
corrigendum1NIT8.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .