Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance HIMACHAL PRADESH HP | L1 | Admitted-Finance | |
| 2 | L2₹2.3 L+₹7,760.24 (3.54%)Admitted-Finance VILLAGE KURGU P O SHAHDHAR TEHSIL RAMPUR DISTT SHIMLA H P | RAMPUR | SHIMLA | HIMACHAL PRADESH | L2 | Admitted-Finance | |
| 3 | L3₹2.4 L+₹17,555.44 (8.01%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DIWAN LUCKTOO L2 | MANISH KUMAR L3 | MUKESH KUMAR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc.conslidating each depositrd layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 metres complete in all respect as per entire satisfaction of Engineer in Charge. | 22.5 | Cum | 580 ₹13,050 | 610 ₹13,725 | 570 ₹12,825 Lowest |
| 2.00Providing and laying cement concrete 1 : 1.5 :3(1 cement :1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work complete in all respect with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge . | ||||||
| 2.10 | Foundation,footing,bases of columns and the like & mass concrete. | 1.52 | cum | 8,600 ₹13,072 | 8,750 ₹13,300 | 8,570 ₹13,026.4 Lowest |
| 2.20 | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 2.98 | cum | 8,750 ₹26,075 | 8,790 ₹26,194.2 | 8,700 ₹25,926 Lowest |
| 3.00 | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | 225 | kg | 95 ₹21,375 | 99 ₹22,275 | 91 ₹20,475 Lowest |
| 4.00 | Providing in RCC woek smooth finishing of the exposed surface with cement mortor 1:3 (1cement:3 Sand) | 36.62 | sqm | 200 ₹7,324 | 220 ₹8,056.4 | 195 ₹7,140.9 Lowest |
| 5.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
| 5.10 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | 36.62 | sqm | 600 ₹21,972 | 630 ₹23,070.6 | 542 ₹19,848.04 Lowest |
| 6.00Providing, Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1975 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge.(Earth work in trenches to be measured and paid separately) | ||||||
| 6.10 | 50 mm OD PE-80, PN-8 | 100 | Rmt. | 102 ₹10,200 | 105 ₹10,500 | 99 ₹9,900 Lowest |
Tender Value
₹2.2 L
EMD Value
₹4,383
Closing Date
24 Sept 2026, 11:00 amClosed
EE JSD Rampur
JSD Rampur
Jacketing for RCC storage Tank 1 No. Providing Laying Jointing and testing of HDPE pipe 50mm and barbed wire fencing
2026_HPIPH_143420_1
7393-7443 Dated 14.09.2026
Open Tender
Civil Works
Item Rate
Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹4,383
5 Oct 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc.conslidating each depositrd layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 metres complete in all respect as per entire satisfaction of Engineer in Charge. | 22.5 | Cum | - | - |
| 2Providing and laying cement concrete 1 : 1.5 :3(1 cement :1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work complete in all respect with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge . | |||||
| 2.1 | Foundation,footing,bases of columns and the like & mass concrete. | 1.52 | cum | - | - |
| 2.2 | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 2.98 | cum | - | - |
| 3 | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | 225 | kg | - | - |
| 4 | Providing in RCC woek smooth finishing of the exposed surface with cement mortor 1:3 (1cement:3 Sand) | 36.62 | sqm | - | - |
| 5Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | |||||
| 5.1 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | 36.62 | sqm | - | - |
| 6Providing, Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1975 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge.(Earth work in trenches to be measured and paid separately) | |||||
| 6.1 | 50 mm OD PE-80, PN-8 | 100 | Rmt. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Form6.pdf
Tender Documents • 0.27 MB
F8.pdf
Tender Documents • 1.09 MB
Terms.pdf
Tender Documents • 0.02 MB
BOQ_213092.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .