Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹5.1 L+₹14,826.81 (2.99%)Rejected-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹5.2 L+₹24,050.18 (4.85%)Rejected-Finance 115 5 NADIBHAG 1ST LANE BADU ROAD MADHYAMGRAM KOLKATA 700128 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700128 | 3 | Rejected-Finance 3 |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
18 Feb 2026, 11:00 amClosed
Executive engineer (Uttaran Services)
1, Hogg. Street, Hogg Building, 3rd Floor, Kolkata - 700087
DISMANTLING OF EXISTING HUTMENT AND CLEAR THE SITE FOR IMPLEMENTATION OF BANGLAR BARI PROJECT NEAR MAYER BARI AT WARD NO-07,BR-I UNDER KMC.
2026_KMC_1000067_1
KMC/US/HQ/07/25-26/230
Open Tender
CIVIL WORKS
Percentage
60 days
WARD-7
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
9 Oct 2026
7 Feb 2026
20 Feb 2026
7 Feb 2026
18 Feb 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 89.59 | CUBIC METER | 939 | ₹84,121.25 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 1,194.48 | SQUARE METER | 50 | ₹59,724 |
| 3 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 470.3 | CUBIC METER | 447 | ₹2,10,222.7 |
| 4 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 19. Dismantling carefully wood work in posts, postplates, rafters, partition etc., sorting and stacking serviciable materials at site and removing rubbish as directed. | 18.57 | CUBIC METER | 278 | ₹5,163.82 |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 8. Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed. (Payment to be made on measurement of portion of roof or wall removed.) | 1,386.45 | SQUARE METER | 41 | ₹56,844.45 |
| 105 | Sub Total | - | - | - | - |
| 106 | GST 18% | 1 | Nos. | - | - |
| 107 | CESS 1% | 1 | Nos. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
NIT.pdf
Tender Documents • 1.78 MB
BOQ_2449860.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .