| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC Lowest Amount | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
20 Jul 2022, 3:00 pmClosed
Project Director
DRDA ,Tirunelveli
Desilting of Kuttuvankulam with Reconstruction of weir and strengthening of bund in Kovilammalpuram pt in Kalakkadu Block
2022_RDTN_241817_5
A6/3415/2022 AGAMT 2021-22 Kalakkad
Open Tender
Civil Works
Item Wise
180 days
Tirunelveli District
scanned copy of pre qualification details
3 documents required · 3 mandatory
₹0
₹10,000
DRDA ,Tirunelveli
26 Oct 2022
15 Jul 2022
20 Jul 2022
15 Jul 2022
20 Jul 2022
15 Jul 2022
15 Jul 2022
Amount
1) Improvements to Kuttuvankulam MI Tank in kuttuvankulam Village kovilammalpuram Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Clearing Juliflora Jungle with uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for Cut Open the Bund etc., complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Centering (Below Sill Level)
Deck Slab Centering
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc., complete.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges etc., complete.
Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Supplying and fixing new cut stone fully dressed to size all faces and set in cement mortar 1:3 (One cement and three sand by volume) mixed mechanically in approved mixer) including all incidental charges such as finishing, curing etc., complete as directed by the Engineer in charge of works and as per technical specifications etc., complete.
GST Amount for providing Service to Government Contract Works for the above Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Arunsingh Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_285406.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .