Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 CrAdmitted-Finance | -17.67% | ₹9.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.0 CrAdmitted-Finance | -16.75% | ₹10.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹10.4 CrAdmitted-Finance | -13.20% | ₹10.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹10.7 CrAdmitted-Finance | -10.89% | ₹10.7 Cr | L4 | Admitted-Finance |
| 5 | L5₹10.9 CrAdmitted-Finance B 2 46 SECTOR 18 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | -9.02% | ₹10.9 Cr | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹22.1 L
Closing Date
11 May 2026, 3:00 pmClosed
Ashok Kumar K, Technical Officer D
CCE R AND D WEST PUNE
Provision of Civil Work for Bowl Cleaning Building 14G2 at Acem Nasik
2026_DRDO_905953_1
CCEW/C8/80229/Civil/Bowl/Nsk
Open Tender
Civil Works
480 days
ACEM, Nasik
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22.1 L
19 Jun 2026
20 Apr 2026
12 May 2026
21 Apr 2026
11 May 2026
2 May 2026
22 Apr 2026 - 30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SUBHEAD- I- SITE DEVELOPMENT | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Sqm | - | - |
| 1.02 | SUBHEAD - II EARTH WORK AND EXCAVATION | - | - | - | - |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (No additional lift payment will be given for mechanical excavations)
All kinds of soil | - | Cum | - | - |
| 1.04 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. (No additional lift payment will be given for mechanical excavations) | - | - | - | - |
| 1.05 | Ordinary rock | - | Cum | - | - |
| 1.06 | Hard rock (blasting prohibited) | - | Cum | - | - |
| 1.07 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.(No additional lift payment will be given for mechanical excavations)
All kinds of soil . | - | Cum | - | - |
| 1.08 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. (No additional lift payment will be given for mechanical excavations) | - | - | - | - |
| 1.09 | Ordinary rock | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.21 MB
ENQBowlPart01.PDF
Tender Documents • 12.38 MB
EnqBowlPart02.PDF
Tender Documents • 21.30 MB
BOQ_952249.xls
BOQ • 1.13 MB
ENQBowlPart03.pdf
Tender Documents • 11.43 MB
Download all tender documents and submit your bid