Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-Finance NA | NA | NA | 121004 | ₹22.7 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹23.8 L+₹1.1 L (4.77%)Accepted-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹23.8 L+₹1.1 L (4.77%) | L2 | Accepted-Finance Admitted |
| 3 | L3₹24.3 L+₹1.6 L (6.87%)Accepted-Finance | ₹24.3 L+₹1.6 L (6.87%) | L3 | Accepted-Finance Admitted |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Swarnik Construction L3 | M/S S R CONSTRUCTION L1 | M/s Ajay Kumar Contractor L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or cement concrete in cement mortar and including stacking of material with in distance of 60M as per direction of Engineer-in-charge | 8.42 | Cum | 450 ₹3,789 | 100 ₹842 | 54 ₹454.68 Lowest |
| 2.00 | Earth work in foundation in all type of soil with all lift and lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-incharge. | 399.6 | Cum | 55 ₹21,978 | 50 ₹19,980 Lowest | 54 ₹21,578.4 |
| 3.00 | Earth work in Making Diversion/Bundha by transported earth with a lead 200 m to 1.00 km i/c excavation, loading, unloading, manual compaction, dressing & all lift complete. | 1,135.2 | Cum | 100 ₹1,13,520 | 50 ₹56,760 Lowest | 54 ₹61,300.8 |
| 4.00 | Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 12.23 | Cum | 4,200 ₹51,366 Lowest | 5,200 ₹63,596 | 5,400 ₹66,042 |
| 5.00 | Laying Plain Cement Concrete A20 M-15 (1 cement :2 coarse sand :4 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 81.04 | Cum | 5,000 ₹4,05,200 Lowest | 5,400 ₹4,37,616 | 5,400 ₹4,37,616 |
| 6.00 | Laying R.C.C. A20 M-25 (1 cement :1 coarse sand :2 graded Stone aggregate) with including all cost of material, labour, T&P etc required for proper completion of work. | 91.07 | Cum | 7,200 ₹6,55,704 | 7,500 ₹6,83,025 | 5,400 ₹4,91,778 Lowest |
| 7.00 | Centering and shuttering for R.C.C. Work including all cost of material, labour, T&P etc required for proper completion of work. | 368.32 | Sqm | 400 ₹1,47,328 | 650 ₹2,39,408 | 280 ₹1,03,129.6 Lowest |
| 8.00 | Providing & Fixing Steel Reinforcement (TMT Fe-550) with cost of bending, binding, cutting and placing of reinforcement i/c all cost of binding wire, material, labour, T&P etc required for proper completion of work. | 7.78 | MT | 70,000 ₹5,44,600 | 65,000 ₹5,05,700 Lowest | 81,000 ₹6,30,180 |
| 9.00 | Laying Brick on edge soling with local sand filling in joints i/c cost of labour, material and T&P etc required for proper completion of work. | 63 | Sqm | 200 ₹12,600 | 100 ₹6,300 Lowest | 360 ₹22,680 |
| 10.00 | Providing & Fixing PVC Drainage Pipe 75 mm dia i/c all cost of material, labour and T&P etc. Complete. | 2.4 | RM | 115 ₹276 | 50 ₹120 Lowest | 360 ₹864 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
1 Jun 2026, 3:00 pmClosed
Ex. Eng., Meerut Division Ganga Canal, Meerut
Office of Executive Engineer, Meerut Division Ganga Canal, Meerut
01/EE/2026-27 Reconstruction of VRB of Rt. Bhola Dy. at km. 12.600 (Lot-3)
2026_UPIDC_1150705_3
01/EE/2026-27
Open Tender
Civil Works - Canal
Piece-work
90 days
As per Tender Notice
As per Tender Notice
2 documents required · 2 mandatory
₹944
₹60,000
2 Jul 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or cement concrete in cement mortar and including stacking of material with in distance of 60M as per direction of Engineer-in-charge | 1 | Cum | - | - |
| 2 | Earth work in foundation in all type of soil with all lift and lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-incharge. | 1 | Cum | - | - |
| 3 | Earth work in Making Diversion/Bundha by transported earth with a lead 200 m to 1.00 km i/c excavation, loading, unloading, manual compaction, dressing & all lift complete. | - | Cum | - | - |
| 4 | Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 1 | Cum | - | - |
| 5 | Laying Plain Cement Concrete A20 M-15 (1 cement :2 coarse sand :4 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 1 | Cum | - | - |
| 6 | Laying R.C.C. A20 M-25 (1 cement :1 coarse sand :2 graded Stone aggregate) with including all cost of material, labour, T&P etc required for proper completion of work. | - | Cum | - | - |
| 7 | Centering and shuttering for R.C.C. Work including all cost of material, labour, T&P etc required for proper completion of work. | - | Sqm | - | - |
| 8 | Providing & Fixing Steel Reinforcement (TMT Fe-550) with cost of bending, binding, cutting and placing of reinforcement i/c all cost of binding wire, material, labour, T&P etc required for proper completion of work. | - | MT | - | - |
| 9 | Laying Brick on edge soling with local sand filling in joints i/c cost of labour, material and T&P etc required for proper completion of work. | - | Sqm | - | - |
| 10 | Providing & Fixing PVC Drainage Pipe 75 mm dia i/c all cost of material, labour and T&P etc. Complete. | 1 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.10 MB
Tendernotice_2.pdf
PDF • 2.11 MB
BOQ_2154983.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .