| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.0 CrAccepted-AOC | ₹20.0 Cr | L-1 | Accepted-AOC Awarded being valid and eligible L-1 Bidder as per Tender Committee evaluation. Awarded value is as per ONLINE Bid Price inclusive of Goods and Service Tax (GST) Components. |
| 2 | L-2₹20.3 CrRejected-Finance | ₹20.3 Cr | L-2 | Rejected-Finance Rejected not being L1 Bidder. |
Tender Value
₹23.1 Cr
EMD Value
₹28.9 L
Closing Date
11 Jan 2023, 5:00 pmClosed
General Manager (Civil)/HoD, SECL
Office of GM (Civil)/HoD, SECL Bhawan, Seepat Road, Bilaspur, CG, PIN-495006. Contact No. 9425531873/9437539692/6232015388/ 9425531210 email - gmcivilhod.secl(at)gmail.com and/or gmcivil.secl(at)coalindia.in
Providing concrete Pavement for coal transportation road at different locations of Dipka Expansion Project of Dipka Area including 05 (Five) years of Comprehensive repair and maintenance work.
2022_SECL_264972_1
GM(C)/SECL/BSP/e-T /DPK/2022/302 dtd. 13.12.2022
Open Tender
Civil Works - Roads
2005 days
Dipka Area, Distt-Korba, CG
Please refer Tender documents.
5 documents required · 5 mandatory
₹28.9 L
20 Mar 2023
15 Dec 2022
13 Jan 2023
15 Dec 2022
11 Jan 2023
16 Dec 2022
15 Dec 2022 - 31 Dec 2022
Amount
Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300.
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub basewith cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Add extra in Item No. 4 above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design : Mild steel
Add extra in Item No. 4 above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design : Tor steel
Granular Sub- Base as per Table :- 400 - 1 Construction of granular sub-base by providing close graded Material, carriage of mixed Material to work site, spreadingn in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory roller at OMC to achieve the desired density, complete as per clause 401 Plant Mix Method ( with mechanically crushed stone only) For grading III Material
Granular Sub- Base as per Table :- 400 - 1 Construction of granular sub-base by providing close graded Material, carriage of mixed Material to work site, spreadingn in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory roller at OMC to achieve the desired density, complete as per clause 401 Plant Mix Method ( with mechanically crushed stone only) For grading II Material
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per relevant clauses of section 300 & 2100 in Mechanical Means, Depth upto 3 m.
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with PCC Grade M15.
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with RCC Grade M25.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification and as per relevant clauses of sections 1500, 1700 and 2300 in RCC Grade M25.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as per relevant clauses of section 1600.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m.
Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row. Providing and Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material (cost of bedding included) in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets : 1200 mm dia
Total impact of GST for the purpose of CTC
ASHOK KUMAR MITTAL
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid