| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹40.6 L+₹1.9 L (4.89%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹40.7 L+₹2.0 L (5.07%)Rejected-Finance VILL CHOMON ADAMPUR JALANDHAR PUNJAB 144103 UDYAM PB 10 0011450 | JALANDHAR | PUNJAB | 144103 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹41.0 L+₹2.3 L (5.85%)Rejected-Finance AWADHI ROAD ADAJAN 1ST 102 DABKA NO 1 1 6 4 C 4TH FLOOR | GANDHINAGAR | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹41.2 L+₹2.5 L (6.36%)Rejected-Finance | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | R K ENTERPRISES L2 | siddharthenterprises L4 | M/s Sahib and Company L3 | PRATHAM TRADERS L1 | N S ENGINEERS L6 | A H BUILDERS L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Concrete in ground floors and paving n.exc 15 cm thickness (below or above ground level), cement concrete ( un reinforced), etc complete all as specified and directed. | 1 | Cubic Metre | 500 ₹500 | 580 ₹580 | 200 ₹200 Lowest | 450 ₹450 | 500 ₹500 | 450 ₹450 |
| 2.00 | Taking down cement or cement lime plaster, any description on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. | 870 | Square Metre | 30 ₹26,100 Lowest | 30 ₹26,100 Lowest | 45 ₹39,150 | 40 ₹34,800 | 35 ₹30,450 | 35 ₹30,450 |
| 3.00 | Demolition of Concrete of any description and in any position not otherwise specifically provided for, cement concrete ( un reinforced), etc complete all as specified and directed.( For sunken) | 1 | Cubic Metre | 500 ₹500 | 560 ₹560 | 500 ₹500 | 460 ₹460 Lowest | 500 ₹500 | 460 ₹460 Lowest |
| 4.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, etc complete all as specified and directed. | 568 | Square Metre | 40 ₹22,720 Lowest | 45 ₹25,560 | 80 ₹45,440 | 45 ₹25,560 | 40 ₹22,720 Lowest | 45 ₹25,560 |
| 5.00 | Demolition of reinforced cement concrete as in chimney, Roofs, floors (other than ground floors), beams staircases, landing, chajjas, and similar suspended work complete all as specified and directed. | 2 | Cubic Metre | 600 ₹1,200 | 580 ₹1,160 | 500 ₹1,000 | 470 ₹940 Lowest | 500 ₹1,000 | 470 ₹940 Lowest |
| 6.00 | Taking down chowkhats or frames with shutters (without taking off shutters from the frames) not exc 1.50 Sqm each complete all as specified and directed. | 50 | Each | 100 ₹5,000 Lowest | 100 ₹5,000 Lowest | 250 ₹12,500 | 140 ₹7,000 | 150 ₹7,500 | 140 ₹7,000 |
| 7.00 | Taking down, Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each but with shutters (without taking off shutters from the frame),etc complete all as specified and directed. | 35 | Each | 150 ₹5,250 | 100 ₹3,500 Lowest | 250 ₹8,750 | 195 ₹6,825 | 200 ₹7,000 | 195 ₹6,825 |
| 8.00 | Taking down shutter of any description exceeding 1.00 Sqm but not exceeding 2.00 Sqm each and removing from site complete all as specified and directed. | 30 | Each | 250 ₹7,500 | 120 ₹3,600 | 250 ₹7,500 | 120 ₹3,600 | 100 ₹3,000 Lowest | 120 ₹3,600 |
| 9.00 | Taking down shutter for , easing, adjusting of old wooden shutters of any description exc. 1 Sq,m and not exc. 2 Sq.m each and refixing in same opening after tiling work complete all as specified and directed. | 20 | Each Shutter | 200 ₹4,000 | 120 ₹2,400 | 250 ₹5,000 | 210 ₹4,200 | 100 ₹2,000 Lowest | 210 ₹4,200 |
| 10.00 | Demolition of brickwork built in cement mortar including all quoins, arches, pillars etc complete all as specified and directed. | 5.38 | Cubic Metre | 400 ₹2,152 | 320 ₹1,721.6 Lowest | 500 ₹2,690 | 460 ₹2,474.8 | 400 ₹2,152 | 460 ₹2,474.8 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
9 May 2026, 6:00 pmClosed
GE (AF) Adampur
GE (AF) Adampur
REPAIR TO MISC B/R WORKS IN SMQS AND MAP QTRS AT AFS ADAMPUR
2026_MES_760611_1
GE(AF)/ADM/T-07 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
Under GE (AF) Adampur
As per tender
8 documents required · 8 mandatory
₹500
GE (AF) Adampur
₹80,000
Yes
6 Jun 2026
16 Apr 2026
11 May 2026
16 Apr 2026
9 May 2026
2 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Concrete in ground floors and paving n.exc 15 cm thickness (below or above ground level), cement concrete ( un reinforced), etc complete all as specified and directed. | - | Cubic Metre | - | - |
| 2 | Taking down cement or cement lime plaster, any description on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. | - | Square Metre | - | - |
| 3 | Demolition of Concrete of any description and in any position not otherwise specifically provided for, cement concrete ( un reinforced), etc complete all as specified and directed.( For sunken) | - | Cubic Metre | - | - |
| 4 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, etc complete all as specified and directed. | - | Square Metre | - | - |
| 5 | Demolition of reinforced cement concrete as in chimney, Roofs, floors (other than ground floors), beams staircases, landing, chajjas, and similar suspended work complete all as specified and directed. | - | Cubic Metre | - | - |
| 6 | Taking down chowkhats or frames with shutters (without taking off shutters from the frames) not exc 1.50 Sqm each complete all as specified and directed. | - | Each | - | - |
| 7 | Taking down, Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each but with shutters (without taking off shutters from the frame),etc complete all as specified and directed. | - | Each | - | - |
| 8 | Taking down shutter of any description exceeding 1.00 Sqm but not exceeding 2.00 Sqm each and removing from site complete all as specified and directed. | - | Each | - | - |
| 9 | Taking down shutter for , easing, adjusting of old wooden shutters of any description exc. 1 Sq,m and not exc. 2 Sq.m each and refixing in same opening after tiling work complete all as specified and directed. | - | Each Shutter | - | - |
| 10 | Demolition of brickwork built in cement mortar including all quoins, arches, pillars etc complete all as specified and directed. | - | Cubic Metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_851989.xls
BOQ • 2.16 MB
tender.pdf
Tender Documents • 1.06 MB
corregendum.pdf
PDF • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .