Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC | L1 | Accepted-AOC Agreement with L1 | |
| 2 | L2₹14.3 L+₹1.0 L (7.68%)Rejected-AOC | L2 | Rejected-AOC Agreement with L1 | |
| 3 | Not Admitted-Fee/PreQual/Technical 01 YARPUR THANA BHAWAN SHAMLI MUZAFFARNAGAR UTTAR PRADESH 247777 | SHAMLI | UTTAR PRADESH | 247777 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical 99 SUSHILA BIHAR BHUD BULANDSHAHAR | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SHRI BALAJI CONSTRUCTION L2 | RAJBIR SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling bricks work or stone work and cement concrete in cement mortar and inlcuding stacking of material with in a distance of 60 M as per direction of Engineer-in-Charge. | 49.85 | Cum | 481.7 ₹24,012.74 Lowest | 518 ₹25,822.3 |
| 2.00 | Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled material with in 60m distance. | 2 | Cum | 588.7 ₹1,177.4 | 500 ₹1,000 Lowest |
| 3.00 | Earth work in embankment by power tranported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. | 537.66 | Cum | 167.4 ₹90,004.28 | 55 ₹29,571.3 Lowest |
| 4.00 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-incharge up to a distance of 30M from the foundation trenches. | 74.87 | Cum | 93 ₹6,962.91 | 80 ₹5,989.6 Lowest |
| 5.00 | Providing and Fixing RCC 900 mm dia Hume pipe NP-3 (S&S) I.S.I. Mark including loading, unloading, and shifting. | 10 | RM | 6,510 ₹65,100 | 1,500 ₹15,000 Lowest |
| 6.00 | Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work etc. | 69.06 | Sqm | 781.2 ₹53,949.67 | 500 ₹34,530 Lowest |
| 7.00 | Providing and laying Cement concrete M-15 (1:2:4) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | 22.41 | Cum | 5,574.4 ₹1,24,922.3 Lowest | 5,800 ₹1,29,978 |
| 8.00 | Providing and laying Cement concrete M-20 (1:1.5:3) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | 23.35 | Cum | 6,324 ₹1,47,665.4 Lowest | 6,900 ₹1,61,115 |
| 9.00 | Centering and shuttering for R.C.C. work in box culvert including cost of centering and shuttering up to 3 m height. | 94.38 | Sqm | 748.6 ₹70,652.87 Lowest | 780 ₹73,616.4 |
| 10.00 | Providing and laying Reinforced Cement concrete M-25 (1:1:2) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | 46.44 | Cum | 7,719 ₹3,58,470.36 Lowest | 8,000 ₹3,71,520 |
Tender Value
₹16.2 L
EMD Value
₹32,480
Closing Date
28 Jul 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex. Eng., Meerut Division Ganga Canal, Meerut
Office of the Ex. Eng., Meerut Division Ganga Canal, Meerut
02/EE/2026-27 Reconstruction of Box Culvert (V.R.B) at Km 2.250 of Sherpur minor in District Ghaziabad. (Lot-07)
2026_UPIDC_1171721_8
02/EE/2026-27
Open Tender
Civil Works - Canal
Piece-work
90 days
As per Tender Notice
As per Tender Notice
2 documents required · 2 mandatory
₹944
₹32,480
26 Oct 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling bricks work or stone work and cement concrete in cement mortar and inlcuding stacking of material with in a distance of 60 M as per direction of Engineer-in-Charge. | - | Cum | - | - |
| 2 | Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled material with in 60m distance. | - | Cum | - | - |
| 3 | Earth work in embankment by power tranported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. | 1 | Cum | - | - |
| 4 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-incharge up to a distance of 30M from the foundation trenches. | - | Cum | - | - |
| 5 | Providing and Fixing RCC 900 mm dia Hume pipe NP-3 (S&S) I.S.I. Mark including loading, unloading, and shifting. | - | RM | - | - |
| 6 | Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work etc. | - | Sqm | - | - |
| 7 | Providing and laying Cement concrete M-15 (1:2:4) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | - | Cum | - | - |
| 8 | Providing and laying Cement concrete M-20 (1:1.5:3) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | - | Cum | - | - |
| 9 | Centering and shuttering for R.C.C. work in box culvert including cost of centering and shuttering up to 3 m height. | 1 | Sqm | - | - |
| 10 | Providing and laying Reinforced Cement concrete M-25 (1:1:2) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | 1 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.29 MB
Tendernotice_2.pdf
PDF • 2.07 MB
BOQ_2199850.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .