| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | ₹7.7 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 LAdmitted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹8.3 L | L2 | Admitted-Finance |
| 3 | L3₹8.8 LAdmitted-Finance | ₹8.8 L | L3 | Admitted-Finance |
| 4 | L4₹9.7 LAdmitted-Finance | ₹9.7 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ZEENAT ELECTRICAL L3 | RAJAT BHARDWAJ CONTRACTOR L1 | KULDEEP KUMAR SUDAN L2 | M/s Shalimar View electrical and Civil Construction L4 |
|---|---|---|---|---|---|---|---|
| 1.00Providing of Protection works to the foundations at various tower locations of 132KV S/C Janipur Jhajjarkotli Udhampur transmission line by way of crate works and reconstruction of retaining walls 3Nos Locations as per requirement at each site. | |||||||
| 1.01 | Earth work in Bulk excavation by manual in trenches,drains,pipes,cables, foundations, back cutting for retaining walls etc.means over areas (not exceeding 1.5 m in width and 10sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth lead up to 50 meters and lift upto 1.5m, as directed by the site Engineer- in- charge All kind of soil | 107 | Cum | 1,500 ₹1.6 L | 250 ₹26,750 | 200 ₹21,400 | 150 ₹16,050 |
| 1.02 | Providing and laying of position cement concrete of specified grade including cost of centering and shuttering all work upto plinth level with 1:5:10 (1 cement :5 fine sand : 10 graded crushed stone aggregates 40 mm nominal size for R/Walls | 6 | Cum | 1,500 ₹9,000 | 3,000 ₹18,000 | 3,000 ₹18,000 | 5,000 ₹30,000 |
| 1.03 | Random Rubble Stone masonary with hard stone from quarry in superstructure, avobe plinth level upto floor five including leveling with ( 1 cement : 6 coarse Sand :12 grade stone aggreage 20 mm nominal size ) with cement mortar 1:6(1 cement: 6 coarse sand) including curing complete job as per drawing for R/Walls as per drawing. | 89 | Cum | 1,500 ₹1.3 L | 4,500 ₹4.0 L | 3,000 ₹2.7 L | 5,000 ₹4.5 L |
| 1.04 | Providing and laying of position cement concrete of specified grade including cost of centering and shuttering all work upto plinth level with 1:3:6 (1 cement :3 fine sand : 6 graded crushed stone aggregates 20 mm nominal size.for foundation coping. | 2 | Cum | 1,500 ₹3,000 | 2,500 ₹5,000 | 5,500 ₹11,000 | 9,000 ₹18,000 |
| 1.05 | Hand packing of stones in wire crates including cost of stones 6.00mx1.200mx1.200m (20Nos) | 173 | Cum | 1,500 ₹2.6 L | 900 ₹1.6 L | 1,900 ₹3.3 L | 200 ₹34,600 |
| 2.00 | Supply of Galvanized Wire crates 6.00mx1.200mx1.200m | 20 | Nos | 1,000 ₹20,000 | 8,000 ₹1.6 L | 6,500 ₹1.3 L | 5,150 ₹1.0 L |
| 3.00Mechanical Carriage of materials average lead 30KM | |||||||
| 3.01 | Cement | 8.5 | MT | 500 ₹4,250 | 1 ₹8.50 | 100 ₹850 | 500 ₹4,250 |
| 3.02 | Sand | 35 | Cum | 500 ₹17,500 | 1 ₹35 | 100 ₹3,500 | 400 ₹14,000 |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
20 Feb 2026, 2:00 pmClosed
Executive Engineer TLMD-I Jammu
Executive Engineer TLMD-I Janipur Jammu
Protection work for tower foundations at various locations of 132KV Janipur Jhajjarkotli Udhampur transmission line
2026_PDD_302281_1
TLMD-I/J/11 of 2025-26 Dated 04.02.2026
Open Tender
Civil Works
180 days
132KV janipur Jhajjarkotli Udh tx line
Refer SBD
3 documents required · 3 mandatory
₹2,000
Executive Engineer TLMD-I Janipur Jammu
₹23,000
5 Mar 2026
4 Feb 2026
23 Feb 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
5 Feb 2026 - 10 Feb 2026
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid