| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.0 LAccepted-Finance | ₹48.0 L | L1 | Accepted-Finance Accept |
| 2 | L2₹48.8 LAccepted-Finance A 7 62 SECTOR 15 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | ₹48.8 L | L2 | Accepted-Finance Accept |
| 3 | L3₹53.1 LAccepted-Finance | ₹53.1 L | L3 | Accepted-Finance Accept |
| 4 | L4₹55.8 LAccepted-Finance | ₹55.8 L | L4 | Accepted-Finance Accept |
| 5 | L5₹62.3 LAccepted-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹62.3 L | L5 | Accepted-Finance Accept |
Tender Value
₹85.6 L
EMD Value
₹1.7 L
Closing Date
9 Mar 2026, 3:00 pmClosed
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
Improvement of Toe Wall along footpath at Road No.40 (Vir Banda Bairagi Marg) under Sub Division NW R-13 and Division NW R-1, During 2025-26
2026_PWD_288062_1
118/EE/NWR-1/PWD/2025-26
Open Tender
Civil Works - Roads
90 days
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
Improvement of Toe Wall along footpath at Road No.40 (Vir Banda Bairagi Marg) under Sub Division NW R-13 and Division NW R-1, During 2025-26
18 documents required · 18 mandatory
₹0
₹1.7 L
12 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (a) In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (a) All kinds of soil
Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: In case the cement content in design mix is more than the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : (a) Concrete of M10 grade with minimum cement content of 220 kg /cum
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland Cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: In case the cement content in design mix is more than the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. (Note :- Cement content considered in this item is @ 350 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately) All works up to plinth level. Concrete of M30 grade with minimum cement content of 350 kg /cum
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for all heights : (a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Finishing walls with Acrylic Smooth exterior paint of required shade : (a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
DSR 2023 correction factor is 0.973 as per OM 158/SE (TAS)/GST/2024/02-E dt.08/08/2024
Add Cost Index @ 3%
Credit for Old dismantal Interlocking paver block as per direction of engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_381939.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid