Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAccepted-AOC | L1 | Accepted-AOC Lowest tenderer | |
| 2 | L2₹31.7 L+₹1.7 L (5.68%)Rejected-Finance | L2 | Rejected-Finance Other than lowest quoted tenderer | |
| 3 | L3₹32.6 L+₹2.6 L (8.79%)Rejected-Finance | L3 | Rejected-Finance Other than lowest quoted tenderer | |
| 4 | L4₹35.9 L+₹5.9 L (19.7%)Rejected-Finance | L4 | Rejected-Finance Other than lowest quoted tenderer | |
| 5 | L5₹47.5 L+₹17.5 L (58.4%)Rejected-Finance | L5 | Rejected-Finance Other than lowest quoted tenderer |
Tender Value
₹75.0 L
EMD Value
₹1.4 L
Closing Date
23 Jan 2020, 6:00 pmClosed
CWE Allahabad
HQ CWE New Cantt Allahabad
MANNING AND OPERATION OF WATER SUPPLY INSTALLATION AT OLD CANTT ALLAHABAD UNDER GE (EAST) ALLAHABAD.
2019_MES_309450_1
81511/E/E8
Open Tender
Civil Works
Item Rate
334 days
Allahabad
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
GE (East) Allahabad
₹1.4 L
Yes
3 Mar 2020
26 Dec 2019
25 Jan 2020
27 Dec 2019
23 Jan 2020
16 Jan 2020
Amount
Outsourcing for Manning & operation, routine maintenance and valve operation of water supply installations including Chloronome plant, BP dozers, DG set installed at Pump House Nos. 02, 03, 04, 10, 11 & 12 by employing 06 nos. FGM (Skilled tradesman) (i.e. 01 no. FGM at each Pump House) in first shift of 8 hours i.e. from 0600 Hrs to 1400 Hrs on each day including Sundays and holidays complete all as specified and directed.
Outsourcing for Manning & operation, routine maintenance and valve operation of water supply installations including Chloronome plant, BP dozers, DG set installed at Pump House Nos. 02, 03, 04, 10, 11 & 12 by employing 06 nos. FGM (Skilled tradesman) (i.e. 01 no. FGM at each Pump House) in second shift of 8 hours i.e. from 1400 Hrs to 2200 Hrs on each day complete all as specified and directed.
Outsourcing for Manning & operation, routine maintenance and valve operation of water supply installations including Chloronome plant, BP dozers, DG set installed at Pump House Nos. 02, 03, 04, 10, 11 & 12 by employing 06 nos. FGM (Skilled tradesman) (i.e. 01 no. FGM at each Pump House) in third shift of 8 hours i.e. from 2200 Hrs to 0600 Hrs on each day complete all as specified and directed.
Comprehensive maintenance for external water supply distribution system of Zone A & B including providing requisite tools, plants, equipments, safety gears etc. in one shift of 08 hours per day on all working days by employing 01(one). Skilled pipe fitter and 01 (one) helper of 8 hours i.e. from 0900 Hrs to 1700 Hrs including half an hour break on each day except Sundays and holidays complete all as specified and directed. (Note:- All materials which is required for repair to water supply pipe line will be issued by the department under Sch 'B' free for fixing only).
Comprehensive maintenance for external water supply distribution system of Zone C & D including providing requisite tools, plants, equipments, safety gears etc. in one shift of 08 hours per day on all working days by employing 01(one). Skilled pipe fitter and 01 (one) helper of 8 hours i.e. from 0900 Hrs to 1700 Hrs including half an hour break on each day except Sundays and holidays complete all as specified and directed. (Note:- All materials which is required for repair to water supply pipe line will be issued by the department under Sch 'B' free for fixing only).
NOTES FOR SRL ITEM NO 01 TO 05 : (i) Necessary log sheets, maint register/attendance register be supplied and maintain by the contractor. (ii) Contractor will maintain the system by charging of battery & monitor fuel oil etc. (iii) Maintenance period of pump house shall not be deducted from manning and operation period of 08 hours shift. (iv) The contractor shall employ the skilled Operator/Electrician/Mechanic/Pipe fitter having qulification "ITI" certificate holder with an experience of 02 (Two) years as pump operator/Plumbing work as applicable. (v) Operator will maintain related documents i.e. log sheet of pump, DG Set, Chloronome Plants etc.
(vi) Contractor will ensure to submit the life insurance certificate of each operator. The contractor shall be solely responsible in case of accident/mishappening for the risk involved in the work and nothing shall be paid by the department. (vii) In the event of absence of any tradesmen in any of the shift, contractor shall be liable to bear the recovery @ Rs 1500/- for each shift for each tradesmen. (viii) The contractor will deploy one experience supervisor for supervision and taking instructions from Engr-in-Charge regarding the activity of issue of required store and the cost of deployment of supervisor is deemed to be included in the rate quoted by the contractor. (ix) All the item retrieved shall be returned to AGE E/M Old Cantt store which shall be entered in demolition register. (x) The contractor shall provide torch light/Emergency light to the tradesmen in night duty hours. He will also provide the uniform, shoe, belt, Helmet etc. to the men deputed on duty and they will wear the same on duty.
(xi) The contractor shall employ the FGM/Operator/Helper and will submit police verification of his character and antecedents, within 30 days of commencement of work. (xii) All operators shall be well equipped with toll kit, hand gloves, safety gears etc as directed by EIC. (xiii) Necessary log sheets/attendance register and other routine records as instructed by Engineer-in-Charge be supplied and maintained by the contractor. (xiv) Minor parts/material replacement against defective parts costing upto Rs 500/- each required for smooth functioning of plant shall be deemed to included in quoted rates. (xv) Cleaning of the surroundings area such as trimming of bushes, removing of grass of pump houses shall be deemed to include in quoted rates. (xvi) Payment to operating staff should be carried out through cheque or NEFT to their Bank account. (xvii) DHPP-N & Engine oil shall be issued by the department under Sch 'B' free for filling only. (xviii) Necessary arrangement for collecting DHPP-N, Engine oil & consumable store will be made by the Contractor without any extra cost to this department.
V.K. Enterprises
V S BUILDER
sri krishna construction
M/S PRAGATEE ENTERPRISES
AIRCON SYSTEMS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .