| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC L1 is Accepted by LER |
| 2 | L2₹7.8 LRejected-AOC | ₹7.8 L | L2 | Rejected-AOC L2 is Rejected by AER |
| Sl No | Description | Qty | Unit | V.R. CONSTRUCTIONS AND DEVELOPERS L2 | G Thirumalai L1 |
|---|---|---|---|---|---|
| 1.01REPAIRS TO PU MIDDLE SCHOOL RCC BUILDING @ Thalavanur PT | |||||
| 1.02 | chipping the concrete and roughing the surface | 111.22 | sqm | 100 ₹11,121.50 | 35 ₹3,892.53 |
| 1.03 | Finishing the top of roof with one course preesed tiles of size 23x23x20 mm including cost and conveyance of all chatrge etc | 10.32 | sqm | 2,000 ₹20,640 | 1,325.91 ₹13,683.39 |
| 1.04 | Pointing with CM 1:3 Mix with water proofing compound over pressed tiles | 167.18 | sqm | 287.01 ₹47,981.76 | 287.01 ₹47,981.76 |
| 1.05 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 171.59 | sqm | 1,498.62 ₹2.6 L | 1,498.62 ₹2.6 L |
| 1.06 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. | 368.9 | sqm | 205.81 ₹75,923.31 | 205.81 ₹75,923.31 |
| 1.07 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. | 368.59 | sqm | 262.48 ₹96,747.50 | 262.48 ₹96,747.50 |
| 1.08 | Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. | 83.21 | sqm | 159.23 ₹13,249.53 | 159.23 ₹13,249.53 |
| 1.09 | Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete. | 49.68 | sqm | 156.84 ₹7,791.81 | 156.84 ₹7,791.81 |
| 1.10 | Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend. | 14 | rm | 633.77 ₹8,872.78 | 633.77 ₹8,872.78 |
Tender Value
Refer Docs
EMD Value
₹7,700
Closing Date
19 Feb 2026, 3:00 pmClosed
BDo (BP) Vallam
Panchayat Union Vallam
TN/VPM/Vlm/RBMRS/25-26P5
2026_RDTN_657228_1
TN/VPM/Vlm/RBMRS/25-26P5
Open Tender
Civil Works
Vallam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,700
Yes
30 May 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
REPAIRS TO PU MIDDLE SCHOOL RCC BUILDING @ Thalavanur PT
chipping the concrete and roughing the surface
Finishing the top of roof with one course preesed tiles of size 23x23x20 mm including cost and conveyance of all chatrge etc
Pointing with CM 1:3 Mix with water proofing compound over pressed tiles
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete.
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend.
Construction of chappal rack in verandah
Electrification arrangements
Provision for Bala painting
Repairs to Doors and Windows
Labour welfare fund @ 1.0%
Name board
Photo charges
cost and supply of new steel window
Consttuction of cupborad with shelter
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_788172.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_788172.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid