| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC NO 103 104 OGARAM TOWERS NEHRU NAGAR 2ND LINK STREET OMR KOTTIVAKKAM CHENNAI 600 041 | CHENNAI | CHENNAI | TAMIL NADU | 600041 | ₹20.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹22.2 LRejected-AOC | ₹22.2 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹22.8 LRejected-AOC | ₹22.8 L | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SEETHARAM CONSTRUCTION COMPANY | M/s.Sri Lakshaya Enterprises | Thirumalai Enterprises |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc,complete 10 cum | 23.9 | M3 | 4,899.5 ₹5,781.41 | 4,780 ₹5,640.40 | 5,449.2 ₹6,430.06 |
| 2.00 | Supplying and filling stone dust including cost and conveyance of stone dust from an approved quarry and including all labour charges for filling levelling well ramming etc complete as per specification | 3.1 | M3 | 4,030 ₹4,755.40 | 930 ₹1,097.40 | 961 ₹1,133.98 |
| 3.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Sand and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 2.6 | M3 | 13,520 ₹15,953.60 | 13,780 ₹16,260.40 | 14,040 ₹16,567.20 |
| 4.00Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | ||||||
| 4.01 | For Foundation | 10.5 | M3 | 82,950 ₹97,881 | 89,775 ₹1.1 L | 90,300 ₹1.1 L |
| 4.02 | For Ground Floor | 10.2 | M3 | 83,640 ₹98,695.20 | 88,658.4 ₹1.0 L | 88,740 ₹1.0 L |
| 5.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | ||||||
| 5.01 | Footing, Plinth Beam, etc. | 18.08 | M2 | 16,272 ₹19,200.96 | 6,689.6 ₹7,893.73 | 6,780 ₹8,000.40 |
| 5.02 | Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works. | 82.86 | M2 | 91,146 ₹1.1 L | 92,057.46 ₹1.1 L | 99,432 ₹1.2 L |
| 5.03 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 39.1 | M2 | 48,875 ₹57,672.50 | 52,159.4 ₹61,548.09 | 54,740 ₹64,593.20 |
Tender Value
₹22.6 L
EMD Value
₹22,600
Closing Date
18 Jun 2025, 3:00 pmClosed
The Commissioner , Tambaram Corporation
No.01,Kalaivani Street ,Rajakilpakkam,Chennai-73
Construction of Ward Office and Collection Counter Building in Hastinapuram Bus stop
2025_DMA_569347_5
1085/2025/E1
Open Tender
Civil Works
90 days
Tambaram City Municipal Corporation
Construction of Ward Office and Collection Counter Building in Hastinapuram Bus stop
2 documents required · 2 mandatory
₹0
₹22,600
16 Mar 2026
16 Jun 2025
18 Jun 2025
16 Jun 2025
18 Jun 2025
16 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_680114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid