Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹3,648
Closing Date
31 Aug 2026, 6:00 pm5d left
DFO Demarcation Forest Division Kashmir, Srinagar
Office of the Divisional Forest Officer Demarcation Forest Division Kashmir, Sheikh Bagh, Srinagar, Kashmir, Jammu and Kashmir
Installation of 90 Pre-cast RCC Boundary Pillars as per approved design along the Forest Demarcation line (Mainline B.Ps Only) as per the map in Forest Dara Ravi Part-I, Forest of Sindh Forest Division Ganderbal falling in Srinagar District
2026_FD_319377_3
e-NIT NO 02 OF 2026-27 DATED 03-08-2026
Open Tender
Civil Works
Percentage
65 days
Dara Ravi Part-I, Sindh Forest Division (Srinagar)
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
Centralized Pooling Account No. 0110010200001102
₹3,648
31 Aug 2026
19 Aug 2026
1 Sept 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pre-cast R.C.C Boundary Pillars of Height =3' 6", Top section = 4"x 4", Bottom section = 5"x 5",
No’s of vertical 6mm HB wire
to support 4mm internal cage (Concrete ratio = 1:2:4). | - | NO | 1 | - |
| 2Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 meter in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5 meter including disposal of excavated earth up to 1 meter. From cutting edge, disposed earth to be leveled and neatly dressed in 80% dense All Kinds of Soil & 20% ordinary rock. | |||||
| 2.1 | All kinds of Soil @ 50% of Total Qty | 1 | CUM | - | - |
| 2.2 | Ordinary Rock @ 50% of Total Qty | 1 | CUM | 1 | ₹1 |
| 3Providing & laying dry stone solling including ramming, dressing etc complete in foundations and under floors,including carriage & head load | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level in (1:3:6) mix using 20mm nominal size of aggregate. Coping (Above Ground) | |||||
| 5 | Finishing walls with textured exterior paint of required shade on new work (two or more coats applied @3.28 litre/10sqm over and including base coat of water proofing cement paint @2.20 kg/10sqm including BP No. on all Pillars with writing of Geo-locations (Exterior finishing) Pillars /Top of Pillar | 1 | SM | 1 | ₹1 |
| 6Centering and shuttering including strutting, propping etc and removal of form work for in Foundations, footings, bases for columns.Pillar (3" above ground-Coping) | |||||
| 7Carriage of material by Mechanical Transport from Source upto dumping site of work | |||||
| 7.1 | Sand average lead 15 kmts | - | CUM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1073597.xls
BOQ • 0.31 MB
Demarcation_NIT-02_Extension_2nd.pdf
PDF • 0.54 MB
Demarcation_NIT-02_Extension.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].