Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
21 Dec 2021, 3:00 pmClosed
Managing Director
II Floor, MHU Complex, 692, Anna Salai, Nandanam, Chennai-600035.
Selection of System Integrator for Supply, Design, Development, Implementation and Maintenance of CCTNS 2.0
2021_ELCO_192871_1
ELCOT/PROC/OT/33384/CCTNS 2.0 (SCRB)/ 2020-21
Open Tender
Computer- S/W
185 days
Across Tamil Nadu
Please refer Tender documents.
10 documents required · 10 mandatory
₹10,000
ELCOT
₹25 L
ELCOT
25 May 2022
1 Feb 2021
21 Dec 2021
1 Feb 2021
21 Dec 2021
2 Jul 2021
9 Feb 2021
Amount
a. CAPEX: DC/ DRC/ Field Assets & Application Development
CAPEX - DATA CENTER HARDWARE
Web / Application Servers
Database Server
Enterprise Management System
Anti-Virus Software
Host Intrusion Prevention Software
CAPEX - DISASTER RECOVERY CENTER HARDWARE
Web / Application Servers
Database Server
Anti-Virus Software
Host Intrusion Prevention Software
CAPEX - FIELD ASSETS HARDWARE
Desktop
UPS (2KVA) Units (Excluding Battery)
UPS (Units + Batteries) 2 KVA Online UPS, 60 Mins Backup
Inverter
Multi-Function Printer
Laser Printer
External Hard Disk (1 TB)
CAPEX APPLICATION DEVELOPMENT
Design & Development of Webbased Application as per Scope of Work
Design & Development of API/ Web Service and Integration with Central Systems / State Departments & SCRB Applications as per Scope of Work
Design & Development of Mobile Application as per Scope of Work
Description of Work / Item(s)
Amount
e. OPEX: Price Discovery - 3. Data Center/ Disaster Recovery Center
Application Server
Database Server
Description of Work / Item(s)
Amount
e. OPEX: Price Discovery - 4. API/ Web Service Development
API Development
Web service development
Description of Work / Item(s)
Amount
e. OPEX: Price Discovery - 5. Person Man-Month Rate
Technical Solution Architect
Database Expert
Service Desk Expert
Infrastructure Expert
Application Developer
Server Admin
Mobile Applications Programmers
Network Expert/ Admin
IT Security domain expert
Description of Work / Item(s)
Amount
3. Total Bid Value
a & b. Total Cost of Implementation (BoQ1 + BoQ 2) CAPEX (DC/ DRC/ Field Assets & Application Development + Training & Capacity Building)
c. Total Cost of Operations and Maintenance (BoQ3) OPEX (Newly Supplied Hardware, Application & Helpdesk Resources)
d. Total Cost of Operations and Maintenance for Existing Hardware (BoQ4 + BoQ5 + BoQ6) OPEX (Existing Hardware)
e. Total Cost of Operations and Maintenance for Price Discovery OPEX (Price Discovery) (BoQ7 + BoQ8 + BoQ9 + BoQ10 + BoQ11 + BoQ12)
Description of Work / Item(s)
Amount
b. CAPEX: Training & Capacity Building
Train the Trainers
Description of Work / Item(s)
Amount
c. OPEX: Newly Supplied Hardware, Application & Helpdesk Resources
Operations and Maintenance of Datacenter Hardware (Refer CAPEX: Data Center (1.1 & 1.2))
Operations and Maintenance of Enterprise Management System (Refer CAPEX: Data Center (1.3))
Operations and Maintenance of Disaster Recovery Center Hardware (Refer CAPEX: Disaster Recovery Center (2.1 & 2.2)
Operations and Maintenance of Field Assets (Refer CAPEX: Field Assets (3.1 to 3.7))
Operations and Maintenance of Application (Refer CAPEX: Application Development (4.1 to 4.3))
Cost of Manpower deployed in shifts at Data Center (24x7) Total 360 Man months
Cost of Manpower deployed at SCRB for Service Desk Operations (16 x 7) Total 360 Man-months
Description of Work / Item(s)
Amount
d. OPEX: Existing Hardware
UPS Units
UPS Batteries
Description of Work / Item(s)
Amount
d. OPEX: Existing Hardware -Servers:
a) IBM Servers
Description of Work / Item(s)
Amount
d. OPEX: Existing Hardware -Servers: b) Dell Servers
Dell Power Edge R530
Dell Power Edge R930
Dell Power Edge R840
Description of Work / Item(s)
Amount
e. OPEX: Price Discovery - 1. Site Infrastructure - 1a.Site Preparation:
Network CAT 6 UTP Cable
CAT6 Information outlet
Back box and Face plate
Electrical cable 2.5 sq.mm wire (Mtr)
Electrical cable 1.5 sq.mm wire (Mtr)
Electrical cable 4 sq.mm wire (Mtr)
25 mm PVC for UTP CAT -6 data (Mtr) cabling (Clamp, Screw, L and T Bend)
15 or 25mm PVC for electrical (Mtr) cabling (Clamp, Screw, L and T Bend)
Power socket -5amp socket with (no's) switch
Power socket -5/15amp SS Combined
32 Amps MCB (Dual Pole) with Metal Box
Copper wire/strip for earthing
Earth Rod (5ft)
Earthing (including Cement pit & Cover)
Wall Mount 9 U Rack with Delivery (Power panel, Cooling Fan)
16 Port Switch Unmanaged
16 Port Jack Panel Unloaded
1 Mtr Patch Cord
2 Mtr Patch Cord
Description of Work / Item(s)
Amount
e. OPEX: Price Discovery - 2a. Site Shifting
Site Shifting Charges (Police Stations/ Special Units/ Higher Offices/ Training Centers)
Description of Work / Item(s)
Amount
e. OPEX: Price Discovery - 2. Hardware Items
12 V/42 AH SMF Battery for 2 KVA Online UPS, 60 Mins Backup
Online UPS (Unit + Battery) (5 KVA, 120 Mins Backup) as per specification
Toner Cartridge
COFORGE LIMITED
COFORGE LIMITED
Tata Consultancy Services Limited
COFORGE LIMITED
COFORGE LIMITED
COFORGE LIMITED
COFORGE LIMITED
Tata Consultancy Services Limited
COFORGE LIMITED
COFORGE LIMITED
Tata Consultancy Services Limited
Tata Consultancy Services Limited
Tata Consultancy Services Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf