| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC PURBA ASHOKPALLY NH 34 P O RAJGANJ 733134 DIST UTTAR DINAJPUR | RAJGANJ | UTTAR DINAJPUR | WEST BENGAL | 733134 | ₹3.4 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹343.0 Cr+₹339.6 Cr (9987.0%)Rejected-AOC | ₹343.0 Cr+₹339.6 Cr (9987.0%) | L2 | Rejected-AOC Higher Rate |
| 3 | L3₹3.5 Cr+₹11.6 L (3.40%)Rejected-AOC | ₹3.5 Cr+₹11.6 L (3.40%) | L3 | Rejected-AOC Higher rate |
Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
6 Mar 2026, 5:00 pmClosed
Sr. SE, NHC_III, Matigara Siliguri.
Sr. SE, NHC_III, Matigara Siliguri.
Short term Maintenance Contract for 35.607 km from km 71.00 to km 106.607 of NH_512 under N.H. Division No. VII P W Roads Directorate in The District of Dakshin Dinajpur during the year 2025_2026
2026_MoRTH_896876_1
WBPW_Rd/SE/NHC3/eRFP-9/2025-26
Open Tender
Civil Works - Highways
Percentage
365 days
District of Malda
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
GM MoRTH
₹3.4 L
Yes
Siliguri
14 Jul 2026
4 Feb 2026
9 Mar 2026
4 Feb 2026
6 Mar 2026
18 Feb 2026
10 Feb 2026 - 14 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Maintenance (Bill No. 1) Removal of rank vegetation/weeds and undesirable vegetation from shoulders, embankment slopes upto ROW (both sides) complete in all respects including breaking of clods, rough dressing and disposal of waste material and vegetation at a place outside ROW as per direction of Engineer-In-Charge and as per Maintenance Standards Clause 3.3 (Frequency will be once in a quarter). a) Shoulders including side slopes of embankment up to toe line on both sides of the carriageway. (Frequency of cleaning will be four times in a year; however limited to only areas prone to growth of rank/undesirable vegetation and weeds). | 5,697.12 | Sqm | 12.32 | ₹70,188.52 |
| 2 | Clearing longitudinal and transverse covered drains and pipe drains including manholes, gratings, channels and gullies etc. and bringing them to original drainage capacity, including disposal of sediments, extraneous debris and vegetation growth blocking the free flow from site outside ROW with all leads and lifts complete in all respects as directed by the Engineer and as per Maintenance Standards Clause no. 3.1. The job also includes removing and refixing of precast slab in original position, (Freqnency of cleaning will be as per site requirement however limited to twice in a year). | 2,800 | R.M. | 2.42 | ₹6,776 |
| 3 | Providing spot reconditioning, reconstruction and regravelling to repair specific erosion or other damages for restoring the eroded area to originally constructed cross section on cuts and fills slopes/shoulders conforming to Technical Specifications Clause no. 3002. Fill material should be brought from borrow areas located outside ROW conforming to Technical
Specification no. 305. Watered and well compacted with plate compactor or power rammer with all leads and lifts as directed by the Engineer (Quantity of compacted Fill material to be measured on cross sectional area basis) | 1 | Cum | 139.15 | ₹139.01 |
| 4 | Providing, laying and compacting Wet Mix Macadam (WMM) base course with approved materials complete as per Technical Specifications Clause no. 406 of MoRTH | 393.06 | Cum | 4,185.49 | ₹16,45,148.7 |
| 5 | Prime Coat on WMM Surface by SS1 Cationic emulsion @ 0.85kg/sqm | 3,930.59 | Sqm | 92.47 | ₹3,63,461.66 |
| 6 | Providing, laying and compacting Dense Graded Bituminous Macadam complete as per technical Specification Clause no. 505 including tack coat as per Technical Specifications Clause no.503. | - | Cum | 11,963.83 | - |
| 7 | Tack Coat on WMM Surface by RS1 Cationic emulsion @ 0.275kg/sqm | 3,930.59 | Sqm | 19.53 | ₹76,764.42 |
| 8 | Providing, laying and compacting Bituminous Concrete as per technical Specification Clause no. 507 including tack coat as per Technical Specifications Clause no. 503. | 1 | Cum | 13,206.22 | ₹13,193.01 |
| 9 | Tack Coat on bituminous surface using RS1 Cationic emulsion @ 0.250kg /sqm. | 39,030.76 | Sqm | 17.91 | ₹6,99,040.91 |
| 10 | Clearing slab/box type culverts and pipe culverts including clearing, cleaning and reshaping of upstream and down stream faces of these culverts within right of way. The job includes disposal of excess material recovered from site including vegetation outside ROW with all leads and lifts complete in all respects as per direction of Engineer-in-Charge. and as per Maintenance Standards Clause 3.1 (Frequency of cleaning will be one time in a year i.e. before start of monsoon). b) Pipe Culverts | - | Each 1000 M dia | 1,039.29 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_942714.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .