| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC JAISALMER | JAISALMER | RAJASTHAN | 342310 | ₹31.5 L | L1 | Accepted-AOC as per rate finanlized |
| 2 | L2₹32.2 LRejected-Finance B 18 SECTOR 6 NEAR HUDCO COLONY HANUMANGARH RAJASTHAN | HANUMANGARH | RAJASTHAN | 335062 | ₹32.2 L | L2 | Rejected-Finance As per rate Finanlized |
Tender Value
₹37.6 L
EMD Value
₹75,185
Closing Date
16 Jan 2026, 12:00 pmClosed
SE T AND C BHARATPUR
SE TNC BHARATPUR, 220 KV GSS PREMISES, RIICO AREA BHARATPUR -321001
Shifting/ Modification work of 132 kV S/C Weir to Bayana line ( Existing Tower Loc No 52 to 58) ( Line Length- 1.800 kms)
2025_RRVPN_523846_1
TN-24/2025-26
Open Tender
Construction Works
132 kV Weir- Bayana line
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
RRVPNL COLLECTION ACOUNTS
₹75,185
BHARATPUR
27 Feb 2026
5 Jan 2026
16 Jan 2026
5 Jan 2026
16 Jan 2026
5 Jan 2026
9 Jan 2026
DETAIL SURVEY AS PER TENTATIVE ROUTE INCLUDES THE FOLLOWING MAJOR ACTIVITIES:Pegging of line route , providing of survey pillar at an interval of 3-4 Km line route with required jungle clearance for survey, profile preparation of approved route on graph sheet and marking of offset on either side of line , marking of side clearance for hills, sand dunes etc., as per specification and tower scheduling.
CHECK SURVEY AS PER APPROVED ROUTE OF LINE WHICH INCLUDES:Rechecking of the line route as per approved profile, tower centre marking, pit marking, bisection of angle tower as per required at site.
EXCAVATION:Excavation, excluding back filling, including shoring, shutering, dewatering etc. upto the required depth as per foundation speciafication / drawings. (i) Any soil,soft rock other than hard rock
SETTING OF TEMPLATE & STUB / ANCHOR BOLT:Setting of template & stub/ anchor bolt & removal after concreting, excluding cost of excavation and concreting but including back filling with excavated/ borrowed earth (with lead & lift) in layers with ramming andwatering as per specification.(i) Towers including extension upto 9 Meters
CONCRETING:Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size, water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings.(i) 1:1.5:3 Mix
CONCRETING:Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size, water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings.(ii) 1:3:6 Mix
Steel Reinforcement:Cutting ,Bending , Welding of joint if required , fixing and placing of steel reinforcement as per specification and drawing s including material.
EARTHING:(A) Earthing of towers with pipe type earthing excluding the supply of pipes, wires, flats & connectors, but including coke / charcoal, etc., excavation, augering and backfilling in all types of soil.
Erection of Towers:-Erection of super structures including D-shakles, ACD, Hangers, U Bolts, Step bolts, danger plates, phase plate, number plate etc. Also including tack welding of bolts & nuts upto bottom cross arm/beam level including application of Zinc Rinch Paint.i) Erection of towers(with extensions up to 9 Meters)
CONDUCTOR STRINGING:(a) Stringing of ACSR Panther including hoisting of insulator string, laying, jointing & tensioning of conductor, clamping with Armour rods and fixing of vibration damper per route KM of the line.(i) Single conductor
DISMANTLING OF TOWERS:Dismantling of super structure alongwith extensions having tack welded Bolts&nuts, including removing of Dshackles , hangers, U-Bolts , step bolts , ACD Danger plats number plate , phase plate of tower including transporation from site to our store and stacking of all material.(a) 132KV S/C & D/C TOWERS
Destringing of Conductor :-(a) Destringing of ACSR Panther conductor Dismanting of vibration damper s and armour rods removal of conductor from clamp and fitting in roliers , detensioning dehoisting of insulator string as reqired and collecting the material & depositing the same in our store and stacking .(i) Single conductor
Stringing of 24 fiber (DWSM) OPGW FIBER OPTIC CABLE INCLUDING LAYING , TENSIONING , CLAMPING , CIPPING , FIXING VIBRATION DAMPER , EARTH BOND ETC. UP TO PLACEMENT OF JUNCTIO BOX
) Installation Hardware set for 24 fiber OPGW fiber OPGW FIBER OPTIC CABLING INCLUDING ALL CABLE FITTING AND ACCESSORIES EXCEPT JOINT BOX ( 1 set of installation of hardware shall contain all installation hardware fitting as may be required for 1 km of OPGW/ Approch fiber optic cable )
Joint box (24 Fiber) connection of all cable terminal and testing of losses through OTDR
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
Tendernotice_2.pdf
PDF • 30.67 MB
NIBTN24.pdf
Tender Documents • 1.77 MB
BIDTN24.pdf
Other Document • 30.66 MB
BOQ_934821.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid