Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹25.1 Cr+₹8.5 L (0.34%)Rejected-Finance KHALINI DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L2 | Rejected-Finance L2 | |
| 3 | L3₹26.2 Cr+₹1.2 Cr (4.95%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹28.3 Cr
EMD Value
₹38.3 L
Closing Date
3 Oct 2025, 10:00 amClosed
Executive Engineer HPPWD Shimla Division No. III
Executive Engineer HPPWD Shimla Division No. III
Construction of Shopping Office Complex at Sabji Mandi for M.C. Shimla Construction of Type-II Type III blocks for M.C residential Colony at Pashu Padaw near Boileauganj SH C O Type II Type III blocks for M.C. residential Colony at Pashu Padaw,
2025_PWD_115714_1
SE-IV-10976-10991dt.23-9-25
Open Tender
Civil Works - Buildings
Percentage
730 days
Boileaguanj
Please refer Tender documents.
11 documents required · 11 mandatory
₹30,000
₹38.3 L
13 Oct 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work:- Cutting in Earth work in by mechanical means (Hydraulic excavator)/ manual means in all heights and depths in all kinds of soil including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiesling and wedging out of rock (where blasting is prohibited and their intermediate classifications soils including dewatering where ever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site, according to the CPWD specification and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site including prescribed dumping charges (to be arranged by the contractor with in M.C area or out of MC area at his own cost upto all leads/ distance to the satisfaction of Engineer-in-Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour machineries, tools equipments and safety measures and incidentals necessary to complete the work wise mechanical means and labour (if required) all useful material such as stones,shingles aggregate and slates shall be properly stacked at site to the meximum possible extent in all leads and lifts through all modes of transportation and used/removed as per the direction of Engineer-in-charge. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respect including all incidental charges:- :- All kinds of soil. | 5,592.4 | Per cubic metre | 805.6 | ₹45,05,237.44 |
| 2 | Earth work in foundation and trench by mechanical means (Hydraulic excavator)/ manual means in all heights and depths in all kinds of soil including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiesling and wedging out of rock (where blasting is prohibited and their intermediate classifications soils including dewatering where ever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site, according to the CPWD specification and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site including prescribed dumping charges (to be arranged by the contractor with in M.C area or out of MC area at his own cost in all leads/ distance) to the satisfaction of Engineer-in-Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour machineries, tools equipments and safety measures and incidentals necessary to complete the work wise mechanical means and labour (if required) all useful material such as stones,shingles aggregate and slates shall be properly stacked at site to the meximum possible extent in all leads and lifts through all modes of transportation and used/removed as per the direction of Engineer-in-charge. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respect including all incidental charges:- :- All kinds of soil. | 4,045.05 | Per cubic metre | 877.5 | ₹35,49,531.38 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including carriage of materials in all leads and lifts. | 86.81 | Per cubic metre | 1,763.5 | ₹1,53,089.44 |
| 4 | FORM WORK :-Centering and shuttering including strutting, propping etc. and removal of form for upto all floor levels including carriage of materials in all leads and lifts:-
(i) Foundations, footings, bases of columns, etc. for mass concrete. | 1,242.24 | Per square metre | 247.8 | ₹3,07,827.07 |
| 5 | (ii) Suspended floors, roofs and the like. | 4,646.24 | Per square metre | 583.7 | ₹27,12,010.29 |
| 6 | (iii) Columns, Pillars, Piers, Abutments, Post and struts. | 3,544.64 | Per square metre | 590.1 | ₹20,91,692.06 |
| 7 | (iv) Lintels, beams, plinth beams, girders,bressumers and cantilevers. | 4,850.6 | Per square metre | 540 | ₹26,19,324 |
| 8 | (v)Stairs, (excluding landings) except spiral-staircases. | 470.64 | Per square metre | 507.8 | ₹2,38,990.99 |
| 9 | (vi) Edges of slabs and breaks in floors and walls.(a) Under 20 cm wide | 941.04 | Per Running metre | 140.7 | ₹1,32,404.33 |
| 10 | (vii) Walls any thickness including attached pillasters, buttresses, plinth and string courses etc. | 6,188.4 | Per square metre | 519.8 | ₹32,16,730.32 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_168839.xls
BOQ • 0.47 MB
SBD282531460.pdf
Tender Documents • 2.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .