| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.0 L+₹2,733.13 (0.55%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M.Sankaranarayanan L1 | S.SELVARAJU L2 |
|---|---|---|---|---|---|
| 1.001.) Construction of Co-location Building for Zonal Depty BDO at Manjini Panchayat. | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 12.86 | cum | 246 ₹3,163.56 Lowest | 250 ₹3,215 |
| 3.00 | Supplying and Filling foundation and basement with filling Msand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 1.28 | cum | 1,800 ₹2,304 Lowest | 1,800 ₹2,304 Lowest |
| 4.00 | Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. | 4.48 | cum | 42 ₹188.16 Lowest | 42 ₹188.16 Lowest |
| 5.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 2.78 | cum | 5,459 ₹15,176.02 Lowest | 5,500 ₹15,290 |
| 6.00 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. | 10.31 | cum | 5,910 ₹60,932.1 Lowest | 6,000 ₹61,860 |
| 7.00 | Brickwork in CM 1:5 mix using country bicks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 12.44 | cum | 6,014 ₹74,814.16 Lowest | 6,050 ₹75,262 |
| 8.00 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. | 0.47 | MT | 89,883 ₹42,245.01 Lowest | 90,000 ₹42,300 |
| 9.00 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete | 21.73 | Sqm | 1,033 ₹22,447.09 Lowest | 1,050 ₹22,816.5 |
| 10.00 | Reinforced Cement Concrete 1:1.5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete. | 3.44 | cum | 9,138 ₹31,434.72 Lowest | 9,150 ₹31,476 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
12 Nov 2024, 3:00 pmClosed
BDO VP Attur
BDO Office Taluk Office Campaus Attur
Construction of Co Location Building for Zonal Deputy BDO H/O Manjini Panchayat of Attur Block at Salem District RRGSA - 2024-25
2024_RDTN_498988_1
Roc No.3520/2024/T1
Open Tender
Civil Works
Lump-sum
180 days
Block Development Office
As Per Tender Documents
3 documents required · 3 mandatory
₹0
₹5,000
BDO Office Attur
29 Oct 2025
6 Nov 2024
12 Nov 2024
6 Nov 2024
12 Nov 2024
6 Nov 2024
7 Nov 2024
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .