Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.0 LAccepted-AOC WZ 680 1ST FLOOR KH NO 662 GALI NO 27 PALAM COLONY PALAM VILLAGE SOUTH WEST DELHI 110045 | DELHI | SOUTH WEST DELHI | DELHI | 110045 | ₹21.0 L | 1 | Accepted-AOC LOWEST |
| 2 | 2₹22.8 L+₹1.8 L (8.80%)Rejected-Finance | ₹22.8 L+₹1.8 L (8.80%) | 2 | Rejected-Finance NOT LOWEST |
| 3 | 3₹22.9 L+₹1.9 L (9.24%)Rejected-Finance 1ST FLOOR H NO 165 GALI NO 16 S B S COLONY KARAWAL NAGAR DELHI EAST DELHI DELHI 110094 | NORTH EAST DELHI | DELHI | 110094 | ₹22.9 L+₹1.9 L (9.24%) | 3 | Rejected-Finance NOT LOWEST |
| 4 | 4₹24.2 L+₹3.2 L (15.1%)Rejected-Finance | ₹24.2 L+₹3.2 L (15.1%) | 4 | Rejected-Finance NOT LOWEST |
| 5 | 5₹26.4 L+₹5.4 L (25.6%)Rejected-Finance | ₹26.4 L+₹5.4 L (25.6%) | 5 | Rejected-Finance NOT LOWEST |
| Sl No | Description | Qty | Unit | Kunal Construction Co. L2 | R. S. Associates L3 | High Tech Metal India L4 | M/S VERMA BUILDER L5 | DOLMA ASSOCIATES L1 | GIR RAJ BUILDERS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster on brick or concrete wall surfaces etc including raking out joints, hacking for keys, scrubbing down with water, etc up to 4th storey buildings with and including removing the debris from site to out site MoD land complete all as specified and as directed. | 1,710 | Sqm | 20 ₹34,200 | 10 ₹17,100 Lowest | 10 ₹17,100 Lowest | 20 ₹34,200 | 10 ₹17,100 Lowest | 20 ₹34,200 |
| 2.00 | M&L for 15 mm thick rendering of Ready Mix Mortar of approved make on brick work or concrete surfaces on external walls, finished the surface even and smooth without using extra cement as whole or in patch etc complete all as specified and as directed. Make- Birla (HIL) or its equivalent. | 1,160 | Sqm | 250 ₹2,90,000 | 250 ₹2,90,000 | 250 ₹2,90,000 | 275 ₹3,19,000 | 225 ₹2,61,000 Lowest | 300 ₹3,48,000 |
| 3.00 | M&L for 10 mm thick rendering of Ready Mix Mortar of approved make on brick work or concrete surfaces on internal walls, finished the surface even and smooth without using extra cement as on wall as whole or in patch etc complete all as specified and as directed. Make- Birla (HIL) or its equivalent. | 480 | Sqm | 250 ₹1,20,000 | 250 ₹1,20,000 | 250 ₹1,20,000 | 275 ₹1,32,000 | 210 ₹1,00,800 Lowest | 300 ₹1,44,000 |
| 4.00 | M&L for 5 mm thick cement plater of ready mix mortar of approved make as on ceiling & plastering to be finished even & smooth without using extra cement complete all as specified and as directed. | 70 | Sqm | 250 ₹17,500 | 200 ₹14,000 | 150 ₹10,500 Lowest | 275 ₹19,250 | 200 ₹14,000 | 300 ₹21,000 |
| 5.00 | M&L for applying two coats of exterior emulsion paint over and including priming coat of exterior primer of same make over new surfaces to obtain smooth finishing surface etc complete all as specified and as directed by Engineer - in- charge. | 1,160 | Sqm | 40 ₹46,400 Lowest | 49 ₹56,840 | 60 ₹69,600 | 60 ₹69,600 | 50 ₹58,000 | 60 ₹69,600 |
| 6.00 | M&L for preparation of new plastered surfaces of walls and applying two coats of oil bound distemper over a coat of primer using roller including necessary scaffolding etc complete all as specified and directed. | 480 | Sqm | 35 ₹16,800 | 35 ₹16,800 | 60 ₹28,800 | 25 ₹12,000 Lowest | 39 ₹18,720 | 60 ₹28,800 |
| 7.00 | M&L for preparation of new plastered surfaces of ceiling and applying two coats oil bound distemper over a coat of primer including necessary scaffolding etc complete all as specified and as directed. | 70 | Sqm | 40 ₹2,800 | 35 ₹2,450 | 40 ₹2,800 | 30 ₹2,100 Lowest | 30 ₹2,100 Lowest | 60 ₹4,200 |
| 8.00 | M&L for complete removal of existing treated surface of exterior wall including necessary scaffolding etc for OHT, Watch Tower or Bldg Height up to 30 mtr and applying two coats of cement base paint to obtain smooth finishing surface etc complete all as specified and as directed by Engineer - in- charge. | 2,200 | Sqm | 30 ₹66,000 Lowest | 78 ₹1,71,600 | 60 ₹1,32,000 | 50 ₹1,10,000 | 75 ₹1,65,000 | 60 ₹1,32,000 |
| 9.00 | M&L for complete removal of existing treated surface of exterior wall by electrically operated grinder including necessary scaffolding etc and applying two coats of exterior emulsion paint over one coat of primer of same make to obtain smooth finishing surface etc complete all as specified and directed by Engineer - in- charge. | 19,090 | Sqm | 50 ₹9,54,500 | 48 ₹9,16,320 | 50 ₹9,54,500 | 65 ₹12,40,850 | 43 ₹8,20,870 Lowest | 50 ₹9,54,500 |
| 10.00 | M&L for preparation of old decorated plastered or unplastered surfaces in ceiling by brooming down or steel wire brushing, scraping down, smoke, spots and filling cracks/holes by putty and applying one coat of oil bound distemper complete all as specified and directed by Engr-in Charge . | 250 | Sqm | 40 ₹10,000 | 20 ₹5,000 | 22 ₹5,500 | 15 ₹3,750 | 10 ₹2,500 Lowest | 40 ₹10,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
2 Jul 2026, 6:00 pmClosed
GE (AF) PALAM DELHI CANTT 10
GE (AF) PALAM DELHI CANTT 10
PERIODICAL SERVICES USING SMART PERIODICAL METHODOLOGY TO BUILDINGS IN IN TECH AREA, 140 MC DET, AFCNWP, IFS, CPRU UNDER AGE B/R-I AT AF STN PALAM UNDER GE (AF) PALAM DELHI CANTT-10
2026_MES_771346_1
8026/A/T-13/E8
Open Tender
Civil Works
Item Rate
270 days
GE (AF) Palam Delhi Cant-10
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) PALAM
₹60,000
Yes
27 Aug 2026
11 Jun 2026
9 Jul 2026
11 Jun 2026
2 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster on brick or concrete wall surfaces etc including raking out joints, hacking for keys, scrubbing down with water, etc up to 4th storey buildings with and including removing the debris from site to out site MoD land complete all as specified and as directed. | 1,710 | Sqm | - | - |
| 2 | M&L for 15 mm thick rendering of Ready Mix Mortar of approved make on brick work or concrete surfaces on external walls, finished the surface even and smooth without using extra cement as whole or in patch etc complete all as specified and as directed. Make- Birla (HIL) or its equivalent. | 1,160 | Sqm | - | - |
| 3 | M&L for 10 mm thick rendering of Ready Mix Mortar of approved make on brick work or concrete surfaces on internal walls, finished the surface even and smooth without using extra cement as on wall as whole or in patch etc complete all as specified and as directed. Make- Birla (HIL) or its equivalent. | 480 | Sqm | - | - |
| 4 | M&L for 5 mm thick cement plater in cement mortar (1:3) as on ceiling & plastering to be finished even & smooth without using extra cement complete all as specified and as directed. | 70 | Sqm | - | - |
| 5 | M&L for applying two coats of exterior emulsion paint over and including priming coat of exterior primer of same make over new surfaces to obtain smooth finishing surface etc complete all as specified and as directed by Engineer - in- charge. | 1,160 | Sqm | - | - |
| 6 | M&L for preparation of new plastered surfaces of walls and applying two coats of oil bound distemper over a coat of primer using roller including necessary scaffolding etc complete all as specified and directed. | 480 | Sqm | - | - |
| 7 | M&L for preparation of new plastered surfaces of ceiling and applying two coats oil bound distemper over a coat of primer including necessary scaffolding etc complete all as specified and as directed. | 70 | Sqm | - | - |
| 8 | M&L for complete removal of existing treated surface of exterior wall including necessary scaffolding etc for OHT, Watch Tower or Bldg Height up to 30 mtr and applying two coats of cement base paint to obtain smooth finishing surface etc complete all as specified and as directed by Engineer - in- charge. | 2,200 | Sqm | - | - |
| 9 | M&L for complete removal of existing treated surface of exterior wall by electrically operated grinder including necessary scaffolding etc and applying two coats of exterior emulsion paint over one coat of primer of same make to obtain smooth finishing surface etc complete all as specified and directed by Engineer - in- charge. | 19,090 | Sqm | - | - |
| 10 | M&L for preparation of old decorated plastered or unplastered surfaces in ceiling by brooming down or steel wire brushing, scraping down, smoke, spots and filling cracks/holes by putty and applying one coat of oil bound distemper complete all as specified and directed by Engr-in Charge . | 250 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_863845.xls
BOQ • 0.53 MB
tender.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .