| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance BASUKINATH | GUMLA | JHARKHAND | 835201 | -5.08% | ₹9.9 L | L1 | Admitted-Finance |
| 2 | L2₹10.4 LAdmitted-Finance | -0.08% | ₹10.4 L | L2 | Admitted-Finance |
Tender Value
₹10.4 L
EMD Value
₹20,893
Closing Date
2 Feb 2026, 5:00 pmClosed
EE, RMC
RMC
Construction of RCC Drain at Dorand back side of High Court from Kashmiri Chikken Shop to Tulsi Chwok under ward No 45
2026_UDD_109421_16
193/ENG 2026
Open Tender
Civil Works
90 days
RMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹20,893
27 Apr 2026
22 Jan 2026
3 Feb 2026
22 Jan 2026
2 Feb 2026
22 Jan 2026
Labour for cleaning the work site before and after work etc.
Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. Extra for earthwork in hard soil as per specification & direction of E/I.(vide classification of soil item-B)
Providing,supplying & spreding of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials, labour,royality and taxes all complete as per specification and direction of E/I ( Mode of measurment compacted volume.)
Supplying and laying (properly as per design and drawing ) rip-rap with good quality of boulders duty packed including the cost of materials royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.
Providing RCC-M200 with nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone --do--all complete as per drawing and Technical specification.
Providing precast R.C.C. M-200 with nominal mix of (1:1.5:3) in slab of desired size with approved quality of stone chips and clean coarse sand of F.M. 2.5 to 3 including cost of curing ,shuttering ,carrying the slab manually to site and laying in position all complete (but excluding the cost of reinforcement )taxes and royalty all complete as per building specifications and direction of E/I.
Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
Providing Tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site ,cutting bending and binding with annealed wire with cost of wire ,removal of rust ,placing the rods in position all complete as per building specification and direction of E/I.
Centering and Shuttering including struting,propping etc and removal of from for Foundation, footing s bases of Coloumns etc for mass Concrete.
SAND-LEAD-42km
LOCAL SAND-LEAD-15 Km
Stone Chips-15 Km
BOULDER-LEAD-29 km
EARTH-LEAD-1km
Good & Service Tax (GST)
Labour Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
Tendernotice_2.pdf
PDF • 1.75 MB
BOQ_147846.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid