Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.0 L+₹28,660.62 (7.65%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L2₹4.0 L+₹28,660.62 (7.65%)Admitted-Finance | L2 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
3 Oct 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Wildlife Warden Jambu Zoo
Nagrota, Jammu
Providing and fixing of railing and grating oppposite Indian Wolf, Hyena and Emu enclosure at Jambu Zoo
2026_FD_325319_1
23 WLWJZ of 2026-27
Open Tender
Civil Works - Others
Item Rate
30 days
Jambu Zoo, Nagrota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Wildlife Warden, Jambu Zoo
₹14,000
15 Oct 2026
19 Sept 2026
5 Oct 2026
19 Sept 2026
3 Oct 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Steel work welded in built up sections/framed work, including cutting,
hoisting, fixing in position and applying a priming coat of approved steel
primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. Double frame Grating =53 no @40.00 kg =2120.00kg Raling 2 1/2 inch square pipe =67 Rm @4.16 kg per meter = 278.72 kg 1 1/2" Sqaure pipe = 155 [email protected] kg per meter = 387.50 kg and 1" pipe = 533.53 Rm @1.20 kg per m = 640.23 kg flat 40*5 =128 Rm @1.57 kg per meter= 200 kg Total =2120+278.72+387.50+640.23+200=3626.45 kg | 3,626.45 | kg | 181.6 | ₹6,58,563.32 |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.5 | cum | 6,591 | ₹9,886.5 |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture
to give an even shade. Two or more coats on new work 2*210*3.50=1450 sft 2*210*2.50= 1050 sft Total = 2500 sft or 232.34 @.82=190.51 sqm | 190.51 | each | 131.85 | ₹25,118.74 |
| 4 | Labour employed for making the surface fit for grating and railing including all necessary tools required complete job | 10 | each | 718 | ₹7,180 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.18 MB
BOQ_1098939.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .