Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.8 LAccepted-AOC | L-1 | Accepted-AOC Bidder has been placed L1 | |
| 2 | L-2₹8.9 L+₹10,031.60 (1.14%)Rejected-Finance BILASPUR | L-2 | Rejected-Finance The bidder is replaced L2 and hence not qualified for bid | |
| 3 | L-3₹9.8 L+₹99,640.80 (11.3%)Rejected-Finance | L-3 | Rejected-Finance The bidder is replaced L3 and hence not qualified for bid | |
| 4 | L4₹11.4 L+₹2.6 L (30.1%)Rejected-Finance N A | NA | NA | 121004 | L4 | Rejected-Finance The bidder is replaced L4 and hence not qualified for bid | |
| 5 | Not Admitted-Fee/PreQual/Technical 1ST FLOOR AMRIT EDUCATION GOVT DEGREE COLLAGE ROAD DHALIARA TEHSIL DEHRA DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹11,325
Closing Date
24 Nov 2021, 5:00 pmClosed
Superintending Engineer
Superintending Engineer (OP) Circle, HPSEBL, Una
Tender for Providing SOP to coming small power Industrial load in Industrial Area Pandoga by Providing 4 Nos 100 KVA Sub Station along with 3 Ph LT line under ESD HPSEBL Khad under ED HPSEBL Gagret
2021_HPSEB_53638_1
OCU-07/2021-22
Open Tender
Electrical Works
Item Rate
90 days
Pandoga
Please refer Tender Documents
3 documents required · 3 mandatory
₹590
₹11,325
Una
15 Jan 2022
16 Nov 2021
25 Nov 2021
16 Nov 2021
24 Nov 2021
17 Nov 2021
19 Nov 2021
Amount
Erection Part of HT Line
Errection of LT line. Digging of pit, errection of PCC pole 9 mtr.long, errection of X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Errection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with 7/3.15 mm Conductor of New 3-Ph. L.T Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Fixing of jumper complete in all respect.
Erection Part of 100 KVA Sub-Station
Errection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, errection of D-pole,errection of plate form, errcetion of x-Arm, drop out, fuse unit, Painting of pole, G.O.Switch, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Errection of T/F, and earthing conn. to T/F G.O Switch lightning etc. errection of Stay Set, Errection of Jumper, Pipe earthing 3 Nos., Errection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect , providing & construction of plinth size 3.20x1.20x.045 Mtr. of cement concreting 1:2;4 and 1:4:8 as per site Engineer driection complete in all respect. (100 KVA S/Stn. Structure)
Supply Part of 3-Ph LT Line
PCC Pole 9 mtr. Long Provided by HPSEBL Quantity 32.00 Unit No.
earting set complete in all respect
AAAC 7/3.15 mm Provided by HPSEBL Quantity 1.200 Unit Kms.
Earth hook.
A.I X-Arm 75x75x6mm (Length - 1.50 mtr+0.02 mtr.)
D-Iron (U-Clamp)
Full clamps
L.T Stay wire 7/3.15 @ 6Kg P/set
L.T Stay Set complete
Nut & Bolt off sizes.
G.I. Wire 8 SWG
Spool tie
Sprial PVC Spacer
Earth Knobe
Supply Part of 100 KVA Sub-Station
Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA Provided by HPSEBL Quantity 4.00 Unit No.
Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) Provided by HPSEBL Quantity 8.00 Unit No.
Muffs with concerete filling
X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line and transformer bed
X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-Arm [Channel Iron (100x50x5 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer]
MS Angle Iron (50X50x5 mm), Length: 2800 mm x(1 Nos for LA's + 2 No. for Dist Panel Box)
Transformer Belting & Knee Bracing
MS Angle Iron (50X50x5 mm), Length : 2800 mm x 4 Nos
MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
GO AB Switch Unit (11kV, 400A, 25 KA)
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Stay set complete
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
Pipe Earthing Set
LT Distribution Panel Box with MCCB(160A, 10 kA, 4P 1 No.) and SFU(32A, 5No, rewirable)
Half Clamp (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Thimble
Aluminium Thimble
Full clamps (M.S. flate 50*6mm)
Pin Insulator Provided by HPSEBL Quantity 12.00 Unit No.
Danger Plate
Barbed Wire
LT Cable (3.5 Core) 120 mm²
Energy Meter (3-Phase,4-Wire) DLMS compliant 50A CT Type for 100 KVA Transformer
Aluminium Paint.
LT Switched Capacitors 36- KVAr for 100 KVA (rate per KVAr) (36x4 = 144 KVAr)
Duvedi Electricals
M/S Raizada Enterprises
Mehta Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .