| 1 | L1₹70.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹72.0 L+₹1.5 L (2.17%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical NO 23A V V | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | R.BABU L1 | DCB INFRA L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Sckat Road to Poosivakkam (via) Pudupettai Km 0/0-1/390 in Poosivakkam Panchayat at Walajabad Panchayat Union Estimate Amount Rs.67.44 Lakh Manitenance Amount Rs.5.56 Lakh | |||||
| 2.00 | Clearingthe light jungle including all labour charges for burrying and burning etc., complete. | 1,593.84 | Sqm | 6.3 ₹10,041.19 Lowest | 7.5 ₹11,953.8 |
| 3.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | |||||
| 4.00 | Km 0/055 - 1/000 | 168.88 | Cum | 534 ₹90,181.92 Lowest | 550 ₹92,884 |
| 5.00 | Km 1/00 - 1/390 | 70.2 | Cum | 545 ₹38,259 Lowest | 575 ₹40,365 |
| 6.00Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum | |||||
| 7.00 | Km 0/055 - 1/080 | 576.56 | Cum | 7,645 ₹44,07,801.2 Lowest | 7,750 ₹44,68,340 |
| 8.00Applying tack coat over BT surface (not treated with primer) using 3 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete | |||||
| 9.00 | Km 1/080 - 1/390 | 1,162.5 | Sqm | 34 ₹39,525 Lowest | 45 ₹52,312.5 |
| 10.00Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
Tender Value
₹73 L
EMD Value
₹73,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Kancheepuram
O/o The Project Director, DRDA, Kancheepuram
Strengthening of Sckat Road to Poosivakkam (via) Pudupettai Km 0/0-1/390 in Poosivakkam Panchayat (R-11) at Walajabad Block of Kancheepuram District having PKG. No.TNKPM-08/NBD/2026-27 under NABARD 2026-27
2026_RDTN_656727_1
DIPR/984/Tender/2026, Dt.13.02.2026
Open Tender
Civil Works - Roads
Item Wise
180 days
DRDA, Kancheepuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹73,000
Yes
O/o The Project Director, DRDA, Kancheepuram
7 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
17 Feb 2026
Strengthening of Sckat Road to Poosivakkam (via) Pudupettai Km 0/0-1/390 in Poosivakkam Panchayat at Walajabad Panchayat Union Estimate Amount Rs.67.44 Lakh Manitenance Amount Rs.5.56 Lakh
Clearingthe light jungle including all labour charges for burrying and burning etc., complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Applying tack coat over BT surface (not treated with primer) using 3 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Km stone, Hm stone,& Guardstone,etc.
KM stones
HM stones
Providing 60cm Equilateral triangle board
Providing 90cm Octognal board stop
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
PriceBid08.pdf
Additional Documents • 0.41 MB
BOQ_787557.xls
BOQ • 0.41 MB
TechnicalBid08.pdf
Tender Documents • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .