Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹7.2 L+₹40,361.71 (5.91%)Rejected-AOC | ₹7.2 L+₹40,361.71 (5.91%) | L2 | Rejected-AOC HIGHEST BIDDER |
| Sl No | Description | Qty | Unit | BABALU CONSTRUCTION L1 | Shiv Prasad L2 |
|---|---|---|---|---|---|
| 1.00PLATFORM L.P.B.C. STORE AT KM. 19.200 | |||||
| 2.00 | Earth work in exevation of extra earth of floor and itc proper disposal . including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | 86.4 | CUM | 80 ₹6,912 | 69.94 ₹6,042.82 Lowest |
| 3.00 | Laying local sand below brick pitching including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | 43.2 | CUM | 800 ₹34,560 Lowest | 1,179.54 ₹50,956.13 |
| 4.00 | Laying C.C.(1:2:4) of store. including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | 123.84 | sqm | 5,000 ₹6,19,200 Lowest | 5,006.31 ₹6,19,981.43 |
| 5.00 | Centering & shuttering for both side of panel including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | 280.8 | CUM | 80 ₹22,464 Lowest | 165.66 ₹46,517.33 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
7 Feb 2026, 2:00 pmClosed
EE K.C.P.D-5, DUDDHI
EXECUTIVE ENGINEER KANHAR CANAL PROJECT DIVISION-5, DUDDHI SONEBHADRA
ESTIMATE FOR PLATFORM L.P.B.C. STORE AT KM. 19.200 FOR CEMENT STACKING
2026_UPIDC_1109807_1
02/EE/2025-26
Open Tender
Civil Works
Item Rate
30 days
Duddhi Sonebhadra
Please refer tender documents
2 documents required · 2 mandatory
₹855
₹20,000
3 Jul 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
7 Feb 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PLATFORM L.P.B.C. STORE AT KM. 19.200 | - | - | - | - |
| 2 | Earth work in exevation of extra earth of floor and itc proper disposal . including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | - | CUM | - | - |
| 3 | Laying local sand below brick pitching including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | - | CUM | - | - |
| 4 | Laying C.C.(1:2:4) of store. including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | - | sqm | - | - |
| 5 | Centering & shuttering for both side of panel including cost of material , labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Doc_L1_5.pdf
Tender Documents • 2.08 MB
BOQ_2049609.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .