| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC | ₹28.7 L Quoted ₹29.0 L | L1 | Accepted-AOC Award of Contract |
| 2 | L2₹34.2 L+₹5.1 L (17.7%)Rejected-Finance | ₹34.2 L+₹5.1 L (17.7%) | L2 | Rejected-Finance Not Being Lowest |
| 3 | L3₹37.4 L+₹8.4 L (28.8%)Rejected-Finance | ₹37.4 L+₹8.4 L (28.8%) | L3 | Rejected-Finance Not Being Lowest |
| Sl No | Description | Qty | Unit | M/S. ARUN LAXMAN JAGTAP L2 | Arihant Construction L3 | M/s. Shahabad Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (un-reinforced) in ground floor & paving n.exc. 15cm thick below or above ground level. | 32.61 | Cum | 90 ₹2,934.9 | 200 ₹6,522 | 10 ₹326.1 Lowest |
| 2.00 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons laid, bedded and pointed in any mortar etc. | 58.2 | X Sqm | 90 ₹5,238 Lowest | 200 ₹11,640 | 100 ₹5,820 |
| 3.00 | Excavation in trenches n. exc 1.5 m wide and n. exc 1.5 m in depth and getting out in hard/dense soil etc complete all as specified and directed by Engineer-in-Charge | 44.5 | Cum | 170 ₹7,565 | 180 ₹8,010 | 130 ₹5,785 Lowest |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 30cm to 1.5mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 799 | Cum | 160 ₹1,27,840 | 190 ₹1,51,810 | 130 ₹1,03,870 Lowest |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge.
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 435 | Cum | 200 ₹87,000 | 215 ₹93,525 | 130 ₹56,550 Lowest |
| 6.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 3.0m to 4.50 mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge.
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 290 | Cum | 230 ₹66,700 | 240 ₹69,600 | 130 ₹37,700 Lowest |
| 7.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Ordinary Rock (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 300 | Cum | 240 ₹72,000 | 290 ₹87,000 | 130 ₹39,000 Lowest |
| 8.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Ordinary Rock (exceeding 3.0m to 4.50 mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 300 | Cum | 240 ₹72,000 | 315 ₹94,500 | 130 ₹39,000 Lowest |
| 9.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Hard Rock (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 280 | Cum | 200 ₹56,000 | 390 ₹1,09,200 | 130 ₹36,400 Lowest |
| 10.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Hard Rock (exceeding 3.0m to 4.50 mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 290 | Cum | 220 ₹63,800 | 440 ₹1,27,600 | 130 ₹37,700 Lowest |
Tender Value
₹43.6 L
EMD Value
₹88,000
Closing Date
24 Jun 2026, 6:00 pmClosed
Garrison Engineer (North) Ahilyanagar
Military Engineer Services Garrison Engineer (North) Nagar Pathardi Road Ahilyanagar Fort Ahilyanagar 414 002
PROVISION OF CERTAIN SANCTIONED WORKS AT OLD APS, RIDING SCHOOL AND SWIMMING POOL OF ACC and S IN AOR OF AGE BR II UNDER GE (NORTH) AHILYANAGAR
2026_MES_769326_1
8256/E8
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer (North) Ahilyanagar
As per NIT
8 documents required · 8 mandatory
₹500
Garrison Engineer (North) Ahilyanagar
₹88,000
Yes
12 Sept 2026
3 Jun 2026
26 Jun 2026
3 Jun 2026
24 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (un-reinforced) in ground floor & paving n.exc. 15cm thick below or above ground level. | 32.61 | Cum | 100 | ₹3,261 |
| 2 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons laid, bedded and pointed in any mortar etc. | 58.2 | X Sqm | 100 | ₹5,820 |
| 3 | Excavation in trenches n. exc 1.5 m wide and n. exc 1.5 m in depth and getting out in hard/dense soil etc complete all as specified and directed by Engineer-in-Charge | 44.5 | Cum | 100 | ₹4,450 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 30cm to 1.5mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 799 | Cum | 100 | ₹79,900 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge.
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 435 | Cum | 100 | ₹43,500 |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 3.0m to 4.50 mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge.
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 290 | Cum | 100 | ₹29,000 |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Ordinary Rock (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 300 | Cum | 100 | ₹30,000 |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Ordinary Rock (exceeding 3.0m to 4.50 mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 300 | Cum | 100 | ₹30,000 |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Hard Rock (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 280 | Cum | 100 | ₹28,000 |
| 10 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Hard Rock (exceeding 3.0m to 4.50 mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-incharge
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 290 | Cum | 100 | ₹29,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
TenderDOCUS8256.pdf
Tender Documents • 1.49 MB
BOQ_861551.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .