Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC GRAM PANCHAYAT UNION THIRUPUVANAM | RANIPET | TAMIL NADU | 604407 | ₹4.9 L | L1 | Accepted-AOC l1 |
| 2 | Rejected-Technical KALLAKURICHI | TAMIL NADU | 605702 | - | - | Rejected-Technical l2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical l4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical l3 |
| Sl No | Description | Qty | Unit | RAMAKRISHNAN N L1 | R.SIVA L3 | K MURUGESAN L2 | M MURUGAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Name of Work:Construction of Mini CSC (Model 1) @ PUM school in Mukkudi village and Panchayat | |||||||
| 2.00 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete | 10.39 | sqm | 221.65 ₹2,302.94 Lowest | 245 ₹2,545.55 | 234.76 ₹2,439.16 | 243 ₹2,524.77 |
| 3.00 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 3.26 | cum | 4,800 ₹15,648 Lowest | 5,500 ₹17,930 | 5,307.53 ₹17,302.55 | 5,300 ₹17,278 |
| 4.00 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 4.09 | cum | 5,204.9 ₹21,288.04 Lowest | 5,783 ₹23,652.47 | 5,556.99 ₹22,728.09 | 5,704 ₹23,329.36 |
| 5.00 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Ground floor | 10.38 | cum | 5,282.5 ₹54,832.35 Lowest | 5,870 ₹60,930.6 | 5,483.02 ₹56,913.75 | 5,790 ₹60,100.2 |
| 6.00 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement | 21.74 | cum | 489 ₹10,630.86 | 510 ₹11,087.4 | 487.28 ₹10,593.47 Lowest | 504 ₹10,956.96 |
| 7.00 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement | 24.55 | cum | 919.7 ₹22,578.64 Lowest | 1,019 ₹25,016.45 | 974.55 ₹23,925.2 | 1,007 ₹24,721.85 |
| 8.00 | Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc | 0.7 | kg | 77,168 ₹54,017.6 Lowest | 85,200 ₹59,640 | 81,853.21 ₹57,297.25 | 84,564 ₹59,194.8 |
| 9.00 | R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 6.62 | cum | 7,950 ₹52,629 Lowest | 8,985 ₹59,480.7 | 8,646.49 ₹57,239.76 | 8,734 ₹57,819.08 |
| 10.00 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 9.44 | sqm | 147 ₹1,387.68 Lowest | 163 ₹1,538.72 | 163.98 ₹1,547.97 | 284 ₹2,680.96 |
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
5 Aug 2026, 3:30 pmClosed
BLOCK DEVELOPMENT OFFICER(VPT)
BLOCK DEVELOPMENT OFFICER(VPT),PANCHAYAT UNION THIRUPPUVANAM
Construction of Mini CSC (Type 1) at PUM school in Mukkudi Village and Panchayat
2026_RDTN_687456_1
TPM-2026-2027-MINI CSC-MUKKUDI
Open Tender
Civil Works
Item Rate
180 days
PANCHAYAT UNION THIRUPPUVANAM
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,920
Yes
1 Sept 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work:Construction of Mini CSC (Model 1) @ PUM school in Mukkudi village and Panchayat | - | - | - | - |
| 2 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete | 10.39 | sqm | - | - |
| 3 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 3.26 | cum | - | - |
| 4 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 4.09 | cum | - | - |
| 5 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Ground floor | 10.38 | cum | - | - |
| 6 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement | 21.74 | cum | - | - |
| 7 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement | 24.55 | cum | - | - |
| 8 | Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc | 0.7 | kg | - | - |
| 9 | R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 6.62 | cum | - | - |
| 10 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 9.44 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_826278.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_826278.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .