Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.2 CrAdmitted-Finance C 20A METAL COLONY AMBABARI JAIPUR DIST JAIPUR RAJSTHAN PIN 302023 | JAIPUR | RAJASTHAN | 302023 | L1 | Admitted-Finance | ||
| 2 | L2₹40.4 Cr+₹6.2 Cr (18.2%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹41.0 Cr+₹6.8 Cr (20.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical 6A JAISALMER BARMER BY PASS ROAD PAL ROAD JODHPUR | JODHPUR | JODHPUR | RAJASTHAN | - | Rejected-Technical Non-Responsive List not enclosed ongoing works as per format Schedule-V |
Tender Value
₹37.7 Cr
EMD Value
₹75.4 L
Closing Date
22 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Widening and Strengthening of Barana Jalwara Nahargarh Pandon road SH-72 km. 10/0 to 24/500 and 27/0 to 34/500
2022_CEPWD_287818_9
ACE PWD ZONE KOTA NITNO-08-2022-23
Open Tender
Civil Works
Percentage
360 days
BARAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
20000 EE PWD DIV. SHAHABAD
₹75.4 L
Yes
ACE PWD ZONE KOTA
13 Sept 2022
25 Jul 2022
24 Aug 2022
25 Jul 2022
22 Aug 2022
25 Jul 2022
5 Aug 2022
150 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Thorney Jungle | 13.16 | Hectare | 18,287 | ₹2,40,656.92 |
| 2 | Scarifying, including picking up scarified Material and stacking of old serviceable Material within a lead of 1000 meter [MoRTH Specification: Clause 202 & 305.4.3]. Top bituminous surface of surface dressing or SDBC or premix carpet with all lift and lead upto 1000m for reusable Materials. | 60,975 | Sqm | 7.2 | ₹4,39,020 |
| 3 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 2,04,850.62 | Cum | 111 | ₹2,27,38,418.27 |
| 4 | Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 17,674 | Cum | 36 | ₹6,36,264 |
| 5 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | 13,755.56 | Cum | 1,207 | ₹1,66,02,960.92 |
| 6 | Providing, laying and spreading of granular sub-base by providing coarse graded Material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRTH Specification : clause No. 401. Grading-III | 8,554 | Cum | 476 | ₹40,71,704 |
| 7 | Providing, laying, spreading and compacting crushed graded stone aggregate as per Table 400-10 & 400.11 to Wet Mix Macadam specifications including premixing the Material with water to OMC in mechanical mixer (Pug mill) as per design mix, carriage of mixed Material by tipper to site laying in uniform layers, with motor grader/F.E. loader/Paver Finisher, in sub-base/base course on a well prepared under-base and compacting with Vibratory Roller to achieve the desired density including lighting, guarding, barricading and maintenance of Driversion etc. (MoRTH specification : Clause 406). with all lead & lift | 26,397.13 | Cum | 1,475 | ₹3,89,35,759.38 |
| 8 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS:8887 & manufacturer’s specifications @7.50 kg/10 sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification : Cl. 502, 112 | 1,05,588.5 | Sqm | 31.55 | ₹33,31,317.18 |
| 9 | Providing and applying tack coat on the prepared surface, with bitumen emulsion as per IS:8887 & manufacturer’s specifications @0.275 kg/sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification Cl. 502, 112. | 1,05,588.5 | Sqm | 11.78 | ₹12,43,304.59 |
| 10 | Providing and laying Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates (as per table 500-9, 500-10 and design mix) for base/binder course including loading of Material with F.E. loader, heating of binder (including cost of anti stripping compound, wherever required) aggregates and filler in hot mix plant (40-60 TPH), transporting the mixed Material by tippers and laying with sensor paver finisher as per clause 504.3.5 to the required level and grade, rolling by self propelled power rollers and vibratory rollers or pneumatic tyred roller, 150-250 KN. TP=0.7 Mpa, to achieve the desired density (approved by the department) but excluding primer/tack coat. (MoRTH specification : clause 505, 112). with all lead & lift (a) 50-75mm compacted thickness with 4.5% bitumen content VG30 grade | 8,447.08 | Cum | 6,981 | ₹5,89,69,065.48 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.45 MB
Tendernotice_2.pdf
PDF • 16.66 MB
Tendernotice_3.pdf
PDF • 7.92 MB
BOQ_511972.xls
BOQ • 0.32 MB
7-TENDER-DOCUMENT-BARANA-JALAWARA.pdf
Tender Documents • 0.67 MB
7-Potentional-Baran-jalawar.pdf
Tender Documents • 0.12 MB
rate-analysis-00.pdf
Tender Documents • 9.52 MB
component-new.pdf
Tender Documents • 8.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .