Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.2 L+₹1,634.30 (1.40%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JACCOB AND CO L1 | SCFFABRICATERS L2 |
|---|---|---|---|---|---|
| 1.00 | Erection of centre support | 4 | Each | 800 ₹3,200 Lowest | 1,000 ₹4,000 |
| 2.00 | Erection of 3.5'V cross arm | 5 | Each | 200 ₹1,000 | 150 ₹750 Lowest |
| 3.00 | Erection of Tapping channel cross arm | 1 | Each | 200 ₹200 | 150 ₹150 Lowest |
| 4.00 | Erection of HT TI fitting | 5 | Each | 75 ₹375 Lowest | 75 ₹375 Lowest |
| 5.00 | Fixing of 11KV Polymer Disc with metal parts | 3 | Each | 150 ₹450 | 50 ₹150 Lowest |
| 6.00 | Fixing of 11KV Polymer Pin insulator | 15 | Each | 50 ₹750 Lowest | 50 ₹750 Lowest |
| 7.00 | Excavation of normal ground and Erection of stay set complete | 5 | Each | 450 ₹2,250 | 425 ₹2,125 Lowest |
| 8.00 | Loading & unloading of 16KVA/11KV DT | 2 | Each | 400 ₹800 Lowest | 500 ₹1,000 |
| 9.00 | Loading & unloading of 63 KVA/11KV DT | 2 | Each | 600 ₹1,200 | 500 ₹1,000 Lowest |
| 10.00 | Transporting of DT 63 KVA/11KV & 16KVA/11KV | 4 | Each | 1,000 ₹4,000 | 800 ₹3,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,216
Closing Date
18 Aug 2025, 2:00 pmClosed
Executive Engineer/Distribution/Urban/TTN
131, 132 Ettayapuram road Tuticorin - 2
Imp est prop 2 Nos SP DT and Eos 2 Nos SC prop 2 Nos SP DT in puthiamputhur Section
2025_EB_588012_1
EE/D/U/TTN/ OT.WC No-014/25-26/Dt.01.08.2025
Open Tender
Electrical and Maintenance Works
Works
180 days
Tuticorin
Details Refer in tender document
2 documents required · 2 mandatory
₹0
₹1,216
Yes
13 Oct 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
18 Aug 2025
1 Aug 2025
1 Aug 2025 - 18 Aug 2025
Amount
Erection of centre support
Erection of 3.5'V cross arm
Erection of Tapping channel cross arm
Erection of HT TI fitting
Fixing of 11KV Polymer Disc with metal parts
Fixing of 11KV Polymer Pin insulator
Excavation of normal ground and Erection of stay set complete
Loading & unloading of 16KVA/11KV DT
Loading & unloading of 63 KVA/11KV DT
Transporting of DT 63 KVA/11KV & 16KVA/11KV
Erection of DT 16KVA /11KV
Erection of 63 KVA/11KV
Erection of Single Pole Transformer Structure complete set
Erection of 3phase cross arm
Erection of LT Shackle with metal parts
Erection of Alu.Knop
LT Line Stringing,Sagging binding of conductor 7/3.15AAAC including transporting of materials from Road side to site with LC 30%
Transporting charges
Alteration of Clamp
Dismantling& Re Erection of S phase X arm
Dismantling &RE Erection of LT pin insulator & Shackle& Al-Knob
Dismantling &Re Erection of 7/2.50 AAAC
G.S.T. @18% should be Entered by the Bidder
SCFFABRICATERS (BID ID -1430917)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .