| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.0 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹70.7 L+₹4.3 L (6.43%)Rejected-Finance 66 C O J R NAICKER ASWATHNAGAR SANJAYNAGAR P O BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹71.6 L+₹5.1 L (7.69%)Rejected-Finance | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹73.6 L+₹7.2 L (10.8%)Rejected-Finance NO 9 LAKSHMI NIVAS SOMASHETTAHALLI CHIKKABANAVARA POST BANGALORE 560 090 | BENGALURU URBAN | KARNATAKA | 560090 | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹79.8 L+₹13.3 L (20.0%)Rejected-Finance | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | LAKSHMI CONSTRUCTIONS L4 | VARGHESECHACKO AND CO L1 | chowdeshwariconstructionco L6 | OM ENTERPRISES L2 | M/S AMRITHESH ENTERPRISES L3 | SREE BUILDERS L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5 mtr in depth for foundation, etc. orfor shafts, wells, cesspits,manholes, pier holes, etc. nexc 10 sq m on plan and getting out in hard / dense soil, complete all as specified and as directed. | 6.5 | Cum | 380 ₹2,470 | 340 ₹2,210 Lowest | 550 ₹3,575 | 425 ₹2,762.5 | 450 ₹2,925 | 450 ₹2,925 |
| 2.00 | Returning, filling incl spreading, levelling watering and well ramming in layers not exceeding 25cm in soft / loose soil for sewage pipe line manholes sides and cleaning the site, all as specified and directed. | 4.5 | Cum | 150 ₹675 | 50 ₹225 Lowest | 110 ₹495 | 139 ₹625.5 | 250 ₹1,125 | 100 ₹450 |
| 3.00 | Removing excavated materials (soils) to a distance not exceeding 50m and depositing where directed at a level not exceeding1.5 m above the starting point, all as specified and as directed. | 2 | Cum | 400 ₹800 | 90 ₹180 Lowest | 140 ₹280 | 320 ₹640 | 1,500 ₹3,000 | 120 ₹240 |
| 4.00 | Material & Labour for Pre-cast reinforced cement concrete 1:2:4 type B1 (using 20 mm graded stone aggregate) set in cement mortar 1:4 as in cover slab including all necessary form work, exposed surfaces of concrete shall be finished even and smooth without using extra cement, complete all as specified and as directed. | 1.2 | Cum | 9,500 ₹11,400 | 5,500 ₹6,600 Lowest | 6,500 ₹7,800 | 9,500 ₹11,400 | 8,200 ₹9,840 | 7,300 ₹8,760 |
| 5.00 | Material & Labour for RCC M-25 as in floor / roof Slab and roof projection Slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs, beams and columns and in shelves, completeall as specified and directed. | 1.1 | Cum | 9,500 ₹10,450 | 7,000 ₹7,700 Lowest | 7,000 ₹7,700 Lowest | 7,388 ₹8,126.8 | 8,500 ₹9,350 | 7,500 ₹8,250 |
| 6.00 | Material & Labour for Pre-cast PCC 1:3:6 type C1 (using 20 mm graded stone aggregate) cement concrete block masonry with solid blocks exceeding 10cm in width and set in cement mortar 1:6 of any description, complete all as specified and as directed. | 2.9 | Cum | 7,200 ₹20,880 | 7,000 ₹20,300 | 6,000 ₹17,400 | 5,750 ₹16,675 Lowest | 5,900 ₹17,110 | 7,900 ₹22,910 |
| 7.00 | Material & Labour for Formwork to soffits of suspended slabs such as roof slabs, floor slabs, lintels, Chajjas, cantilevers etc all as specified and directed. | 30 | Sqm | 450 ₹13,500 | 340 ₹10,200 Lowest | 550 ₹16,500 | 495 ₹14,850 | 600 ₹18,000 | 450 ₹13,500 |
| 8.00 | Taking down chowkhat or frame (wooden / steel) exceeding 1.50 Sqm not exceeding 4.0 Sqm each with shutter (with out taking off shutters from the frame), all as specified and as directed. | 12 | Each | 280 ₹3,360 | 30 ₹360 Lowest | 150 ₹1,800 | 357 ₹4,284 | 150 ₹1,800 | 100 ₹1,200 |
| 9.00 | Taking down chowkhat or frame (wooden / steel) not exceeding 1.5 Sqm each with shutter (with out taking off shutters from the frame) all as specified and as directed. | 264 | Each | 240 ₹63,360 | 30 ₹7,920 Lowest | 150 ₹39,600 | 282 ₹74,448 | 100 ₹26,400 | 100 ₹26,400 |
| 10.00 | Material & Labour for second class hard wood, Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints, supplied and fixed complete all as specified and directed. | 0.38 | Cum | 76,000 ₹28,880 | 75,000 ₹28,500 | 90,000 ₹34,200 | 86,387 ₹32,827.06 | 68,000 ₹25,840 Lowest | 85,000 ₹32,300 |
Tender Value
₹82.5 L
EMD Value
₹1.5 L
Closing Date
10 Oct 2025, 6:00 pmClosed
Ranjeet Kumar, IDSE, CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
SPECIAL REPAIR TO WASHROOM AND ALLIED WORKS OF 1(T) MESS IN CTI AT AFS JALAHALLI
2025_MES_729554_1
85350/E8
Open Tender
Civil Works
Item Rate
180 days
GE (M) (AF) Jalahalli
As per Tender Document
8 documents required · 8 mandatory
₹1,000
GE (M) (AF) Jalahalli
₹1.5 L
Yes
29 Oct 2025
5 Sept 2025
17 Oct 2025
5 Sept 2025
10 Oct 2025
26 Sept 2025
5 Sept 2025 - 12 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .