Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.6 LAdmitted-Fee/PreQual/Technical/Finance MAHANADI SOUTH DIVISION NO I CUTTACK | -22.25% | ₹13.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.0 L+₹39,395.13 (2.89%)Admitted-Fee/PreQual/Technical/Finance AT TENTOI P O ALIKANTA DISTRICT JAGATSINGHPUR PIN 754108 | ALIKANTA | JAGATSINGHPUR | ODISHA | 754108 | -20.00% | ₹14.0 L+₹39,395.13 (2.89%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.9 L+₹1.3 L (9.32%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹14.9 L+₹1.3 L (9.32%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.9 L+₹1.3 L (9.34%)Admitted-Fee/PreQual/Technical/Finance AT KENTAL PS KISHORENAGAR DIST CUTTACK | CUTTACK | ODISHA | 752120 | -14.99% | ₹14.9 L+₹1.3 L (9.34%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹17.5 L+₹3.9 L (28.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹17.5 L+₹3.9 L (28.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹17.5 L
EMD Value
₹17,500
Closing Date
12 May 2026, 5:00 pmClosed
S.E, Mahanadi South Division-I, Cuttack
S.E, Mahanadi South Division-I, Cantonment Road, Cuttack-753001
Renovation of Tirtol Lock cum fall of Taladanda Main Canal at RD 55.70km
2026_CELBB_128526_4
MSD_TCN_02/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
CUTTACK
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹17,500
Yes
21 May 2026
28 Apr 2026
13 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
28 Apr 2026 - 5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work excavation of foundation in ordinary soil including rough dressing breaking the clods & leveling the bed and sides and depositing the excavated materials away from work site with all leads, lifts, delifts, cost of labour, T&P, cess, taxes etc. complete as per direction of Engineer-in-charge. | 183.71 | Per Cum | - | - |
| 0_) | Filling in foundation and plinth with sand well watered and rammed including cost carriage and royalty of sand & labour charges etc. complete as per the direction of the Engineer-in-Charge | 18.82 | Per Cum | - | - |
| 0_) | CC work of M-15 grade with 40mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. | 18.82 | Per Cum | - | - |
| 0_) | CC work of M-20 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. | 88.19 | Per Cum | - | - |
| 0_) | CC work of M-25 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. | 21.65 | Per Cum | - | - |
| 0_) | Providing form work for concrete with F2 finish for all permanent exposed surfaces not prominently expose to public views such as in gallaries, adits, bridge and retaining walls etc. with all shutters or ply wood shutters including supply of rigid tie and supports with all labour, materials, cess & T&P etc. complete as per the direction of the Engineer-in-Charge. | 330.52 | Per Sqm | - | - |
| 0_) | Collecting supplying fitting & placing uncoated HYSD reinforcement for RCC work including cutting, bending, binding and tying the grill and placing in position including cost of binding wire 18 to 20 gauge etc. complete as per the direction of the Engineer-in-Charge. | 8.8 | Per Qntl | - | - |
| 0_) | Removing old revetment and approns and re-packing with old sotne including filling the interstices with small stones & wedges as per site requirements and packing the surface to proper lines & level with all leads and lifts & delifts including all labour T&P Cess and all other incidental charges involved for etc. complete as per specification and direction of the Engineer in charge. | 58.5 | Per Cum | - | - |
| 0_) | Earthwork in excavation in all kind of soil including dressing and levelling the bed and depositing the soil away from the work site with all lead , lifts and delifts etc. complete as directed by the Engineer-in-charge. | 561 | Per Cum | - | - |
| 0_) | Puddle filling with good clay with initial lead 50m and lift of 1.50mtr including digging siff clay, carrying weatehering, pulversing, laying and troding etc. all complete with all cost of labour T&P and all other incidental charges required etc. complete as per specification and direction of the Engineer in charge. | 561 | Per Cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
04.pdf
Tender Documents • 6.55 MB
BOQ_588943.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .