| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | M SATHIYASEELAN L1 | M SANTHI L2 |
|---|---|---|---|---|---|
| 1.00Renovation of PUE School Rcc Roof Building (North Facing) at Okkur in Okkur Panchayat | |||||
| 2.00 | Dismantling the existing damaged Pressed tiles including all labour charges etc.complete | 88.2 | Sqm | 22.57 ₹1,990.67 | 24.63 ₹2,172.37 |
| 3.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete | 88.2 | Sqm | 238.03 ₹20,994.25 | 259.75 ₹22,909.95 |
| 4.00 | Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 24.42 | Sqm | 233.02 ₹5,690.35 | 254.28 ₹6,209.52 |
| 5.00 | Plastering with CM 1:5,12mm Thickness including cost and conveyance of all materials to site and all labour charges etc comoplete | 18.75 | Sqm | 219.32 ₹4,112.25 | 239.33 ₹4,487.44 |
| 6.00 | Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 88.2 | Sqm | 842.55 ₹74,312.91 | 919.43 ₹81,093.73 |
| 7.00 | Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.(New Tiles - 5%) | 94.04 | Sqm | 678.96 ₹63,849.40 | 740.91 ₹69,675.18 |
| 8.00 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete | 85.75 | Sqm | 29.9 ₹2,563.93 | 32.63 ₹2,798.02 |
| 9.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete | 107.41 | Sqm | 114.57 ₹12,305.96 | 125.02 ₹13,428.40 |
| 10.00 | Special desing Art work with first class quality emulsion paint including wall putty priming coat etc complete Rate for 100 sq ft. | 42.96 | Sqm | 641.07 ₹27,540.37 | 699.57 ₹30,053.53 |
Tender Value
₹3.8 L
EMD Value
₹3,790
Closing Date
10 Mar 2026, 3:00 pmClosed
Bdo,Avudaiyarkoil
Pt.union Office,Avudaiyarkoil
Renovation of PUE School Rcc Roof Building (North Facing) at Okkur in Okkur Panchayat
2026_RDTN_670682_1
Avk/PUGF/Work--2
Open Tender
Civil Works
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,790
27 Mar 2026
5 Mar 2026
10 Mar 2026
5 Mar 2026
10 Mar 2026
5 Mar 2026
Renovation of PUE School Rcc Roof Building (North Facing) at Okkur in Okkur Panchayat
Dismantling the existing damaged Pressed tiles including all labour charges etc.complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with CM 1:5,12mm Thickness including cost and conveyance of all materials to site and all labour charges etc comoplete
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.(New Tiles - 5%)
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete
Special desing Art work with first class quality emulsion paint including wall putty priming coat etc complete Rate for 100 sq ft.
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete
Providing block board painting in two coats with good quality paint including cost and conveyance etc. complete.
Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC Plug Point etc
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 16 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Avk_doc--2.pdf
Tender Documents • 0.18 MB
BOQ_805988.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid